Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1943     Entry time: Friday, June 14, 2019, 08:15
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: 5 shielding blocks are moved to ITE.  

ITE is configured to take proton beam.

ELOG V2.9.2-2455