Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1368
Entry time:
Tuesday, October 04, 2016, 09:18
Author:
David Wang
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
Subject:
5 Shielding blocks have been transferred from ITW to ITE.
The ITE is configured to take proton beam.
ELOG V2.9.2-2455