Message ID: 2344     Entry time: Monday, July 04, 2022, 11:54
Author: Nadia Jorgenson 
Category: Spent Target Vault 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Added Lubrication,fittings need to be changed 

Dan lubricated components on the target storage vault (This was an outstand task from annual inspection). No issues on the main storage vault but we were not able to lubricate the mini storage vault because the position of the grease nipple on the fittings makes them inaccessible, see attached pictures. All four should be replaced with 90 deg fittings. 