An annual electrical inspection was performed on the SMP today by Travis Cave and Nadia Jorgenson as per Work Permit I2022-06-30-2. The following items were checked:
Electrical Inspection of Safe Module Parking:
- Check condition of wiring for physical/radiation/UV damage
- Check for cable tray debris or damage
- Some objects stored in the cable tray but nothing concerning, no damage noted
- Check inside control panel: components and wiring, labeling
- Labeling intact, components in good condition
- Wiring in good condition
- Verify camera views
- Check connectors for damage
- Check pendant for damage and verify labeling intact
- Lid open/close test
- Lid was opened and close multiple times - smooth operation, no concern
- Lid close logic was checked - OK
- Vessel rotation and limit switch check
- Centre, CW and CCW limits were checked, functioning
Still to be done – Mechanical Inspection:
- Lubricate chains
- Inspect tensioners
- Tighten fasteners
- Inspect components during rotation - chain drive, rotary limit switch, and cable reel etc.
|