518
|
Tuesday, October 22, 2013, 16:52 |
Bevan Moss | Conditioning Station | Repair | | | Canbus base card for BIAS | The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the |
|
366
|
Monday, May 27, 2013, 16:01 |
Bevan Moss | Conditioning Station | Repair | | | CanBUS card | During HV conditioning of TM4 with
Ta#40 there was a spark at ~43 kV that caused
the Bias card to "fry". Dave Morris |
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|
795
|
Wednesday, November 19, 2014, 11:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | | CS roughing pump is started. | CS roughing pump is started for TM4 and
UCX 11 target. |
|
402
|
Wednesday, July 17, 2013, 10:10 |
David Wang | Conditioning Station | Development | TM3 | | CS cooling and vacuum system have been turned off | CS water cooling and vacuum system have
been turned off at 10:00 AM this morning.The
TM3 will be disconnected and moved to silo |
|
798
|
Thursday, November 20, 2014, 14:13 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx11 | CS and TM4 was vented with Argon gas | CS and TM4 was vented with Argon gas this
morning before it was moved from CS to ITE. |
|
901
|
Tuesday, April 28, 2015, 10:21 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx12 | CS and TM1 was vented with Argon gas | Dan and I vented CS and TM1 with Argon
gas before it is moved this morning. |
|
982
|
Tuesday, July 07, 2015, 12:12 |
David Wang | Conditioning Station | Repair | | | CS TP1S replacement | CS TP1S had been replaced with a new TP-301
pump this morning.The old pump was broken
last week. |
|
2682
|
Monday, September 16, 2024, 08:48 |
chad fisher | Manipulator Maintenance | Maintenance | | | CRL Technicain Manipulator Maitenance Trip | Over the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance: |
|
509
|
Friday, October 18, 2013, 13:43 |
chad fisher | South Hot-Cell | Repair | TM4 | | C2 Circuit Removal | The C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used |
|
947
|
Monday, June 15, 2015, 10:16 |
chad fisher | South Hot-Cell | Repair | TM2 | | C.B. off | As per scedule TM2 containment box has
been removed.
|
|
606
|
Monday, February 24, 2014, 12:09 |
chad fisher | South Hot-Cell | Repair | TM2 | | C-seal blank off test | Circuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station. |
|
450
|
Wednesday, September 11, 2013, 15:37 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | C-Seal leak checking and repair | This e-log is to cover the work completed
from September 9th until the 11th.
September 9th |
|
444
|
Friday, September 06, 2013, 16:41 |
Bevan Moss | South Hot-Cell | Development | TM3 | | C-Seal crush investigation | Today Maico completed the new leak
testing tool and blank off. He tested them
with C-seals without springs and all was |
6x |
445
|
Friday, September 06, 2013, 17:50 |
Grant Minor | South Hot-Cell | Development | TM3 | | C-Seal crush investigation |
|
|
2394
|
Thursday, November 24, 2022, 11:32 |
Adam Newsome | Spent Target Vault | Standard Operation | TM4 | C#4 | C#4 Spent Target Moved to Storage Vault | C#4 spent target was moved to the storage
vault, in pail 277. Dose rate at approximately
1 m when leaving the hot cell was 164 mSv/h. |
|
2104
|
Wednesday, June 17, 2020, 09:53 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#1 | C#1 target electrical check and leak check at SHC. | Target to HS is 400 ohm. The rest check
is good. See attachment. |
|
2103
|
Wednesday, June 17, 2020, 09:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | C#1 | C#1 installed | Target C#1 has been installed on TM4 with
new high current fasteners torqued to 130in
lbs. |
|
247
|
Friday, February 22, 2013, 13:13 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | Broken Turbo Pump | Today while putting the cover on
the cord that goes to the controller was
bumped. This bent the connector down and |
|
2583
|
Tuesday, May 07, 2024, 09:47 |
David Wang | ITE/ITW | Maintenance | TM2 | | Broken TM2:TP2 has been replaced. | Broken TM2:TP2 has been replaced otday
by a new TV-1001 nav pump supplied by vacuum
group. replaced pump seris number:201281. |
|