Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2548     Entry time: Friday, February 23, 2024, 06:36
Author: David Wang 
Category: ITE 
Type: Maintenance 
Module:  
Target/Number:  
Subject: ITE entrance module has been disconnected. 

ITE entrance module has been disconnected per document 190510. Its a preparation job for next month module moving out to SHC.

ELOG V2.9.2-2455