891
|
Monday, April 20, 2015, 10:12 |
Anders Mjos | Conditioning Station | Standard Operation | TM1 | UC#12 | Conditioning UC#12 | Monday, April 20, 2015, 09:35: Started
cooling water circulation
HV cover did not fit due to interference |
|
897
|
Thursday, April 23, 2015, 12:56 |
Anders Mjos | Conditioning Station | Maintenance | TM1 | | IG1 Good Vacuum limit changed | Changed by Dave Morris.
New value is 1E-5 T (old value was
7.09E-5 T) |
|
903
|
Tuesday, April 28, 2015, 11:09 |
Anders Mjos | ITW | Maintenance | | | Resistance measured of TGHT and TBHT lines to ITW | The new TBHT and TGHT power supplies were
brough up to high current; 350 A and 420
A respectively. The TGHT power supply was |
|
909
|
Monday, May 04, 2015, 13:32 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 expansion tank topped up | Caled cyclotron ops to open P23 and confirmed
penthouse valve open.
Filled up TK2 to 21 in water leve. |
|
913
|
Monday, May 11, 2015, 10:45 |
Anders Mjos | Conditioning Station | Maintenance | | | RGA electronics box installed | The communications chip has been
replaced. The electronics box has been grounded
(see attached pdf). |
|
931
|
Wednesday, June 03, 2015, 13:01 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#31 | Conditioning SiC#31 | PNG1 connected to PNG in service cap
(as per David W)
Wednesday, June 03, 2015, 12:59: |
|
959
|
Tuesday, June 23, 2015, 16:49 |
Anders Mjos | Conditioning Station | Development | | | TCS is beeing migrated to ISAC | by controls group (Dave Morris).
Friday, June 26, 2015
TCS has been migrated to ISAC controls. |
|
966
|
Friday, June 26, 2015, 15:38 |
Anders Mjos | Conditioning Station | Development | TM2 | | Leak check and HV test | Roughing started by David.
Friday, June 26, 2015, 15:31: Started
TP1S |
|
973
|
Thursday, July 02, 2015, 10:22 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TP1S failed | See e-fault 8233. Edi assisted in
diagnosing the problem. The pump will have
to be replaced. |
|
977
|
Friday, July 03, 2015, 09:27 |
Anders Mjos | Conditioning Station | Development | | | Controls working on access control in EPICS | Some reboots will be done. |
|
981
|
Tuesday, July 07, 2015, 10:50 |
Anders Mjos | Conditioning Station | Development | | | EPICS migration update - archiver |
The archiver is now merged with
ISAC - data available under Utilities
- Archiver Retrieval
Old |
|
988
|
Thursday, July 09, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | TM1 | | TM1 in TCS for alpha contamination test | Thursday, July 09, 2015, 13:17: Water
package started.
Thursday, July 09, 2015, 15:20: Water |
|
992
|
Friday, July 10, 2015, 14:41 |
Anders Mjos | Conditioning Station | Maintenance | TM1 | | Replaced roughing pump | The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1 |
|
1039
|
Monday, August 17, 2015, 10:44 |
Anders Mjos | Conditioning Station | Development | TM2 | LP-FEBIAD Test Target (empty) | Conditioning TM2 Source Tray with FEBIAD test target | TGHT, TBHT, ANODE and COIL power tested
(some amps/volts)
Monday, August 17, 2015, 10:43: BIAS/EL/EE |
 |
1045
|
Friday, August 21, 2015, 11:38 |
Anders Mjos | South Hot-Cell | Repair | TM2 | FEBIAD Test Target | Steerer wires found to be touching the gas lines | Yesterday TM2 was inspected in the SHC.
Spark marks were found both on the steerer
wires and on the ANODE wire. The steerer |
|
1048
|
Wednesday, August 26, 2015, 09:54 |
Anders Mjos | Conditioning Station | Maintenance | | | Topped up water in TCS:TK2 | Filled to 24.9 in |
|
1055
|
Thursday, August 27, 2015, 10:10 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | ZrC#7 | Conditioning new Source Tray | Thursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. |
  |
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|
1067
|
Friday, September 11, 2015, 14:31 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | ZrC#7 | Vacuum gauge and EPICS read back calibration | The corelation betwenn the local value
on the gauge controllers and the read back
valiues in EPICS was compared. Data can be |
|
1090
|
Monday, October 05, 2015, 10:19 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance |
|