639
|
Friday, April 04, 2014, 16:59 |
Anders Mjos | ITW | Development | | | Flow meters installed on Heat Shield and Coil water return | David W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected |
|
|
651
|
Wednesday, April 16, 2014, 10:16 |
Anders Mjos | ITW | Development | TM3 | Ta#42 | Flow meters installed on Heat Shield and Coil water return |
|
|
|
682
|
Friday, June 13, 2014, 10:33 |
Anders Mjos | ITW | Development | TM1 | UC#9 | Flow meter data | Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE |
|
|
687
|
Tuesday, June 24, 2014, 15:14 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal | When the Containment Box was opened today
by Chad for a target change, we found the
conductor insulator block B (ITD0054) to |
|
|
688
|
Tuesday, June 24, 2014, 15:45 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Ground Electrode and Extraction Electrode dirty after last run | See attached pdf and DocuShare for
more photos. It may be possible to clean
some of it from the Ground Electrode. |
|
|
689
|
Wednesday, June 25, 2014, 12:49 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Conductor insulator broken close to right TGHT terminal |
|
|
|
690
|
Wednesday, June 25, 2014, 12:55 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Object - possibly cable tie found in Containment Box | See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare. |
|
|
696
|
Friday, June 27, 2014, 11:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | | Ground Electrode Cleaned |
|
|
|
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning | Wednesday, October 14, 2014
The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped |
|
|
766
|
Thursday, October 16, 2014, 15:40 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller unit | NOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the |
|
|
767
|
Friday, October 17, 2014, 13:36 |
Anders Mjos | Conditioning Station | Maintenance | | | TCS:Chil staging not operational | NOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the |
|
|
774
|
Wednesday, October 22, 2014, 13:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Controls upgrade on TCS | See work
permit for details |
|
|
781
|
Wednesday, November 05, 2014, 14:21 |
Anders Mjos | Conditioning Station | Development | | | Jumper installed on TGHT, TBHT and COIL | A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing. |
|
|
815
|
Friday, December 05, 2014, 13:46 |
Anders Mjos | Conditioning Station | Development | TM2 | | Not able to start water system | TCS:WPV1 does not open when staging
is enabled. Multiple attempts have been made,
but the valve remains closed. |
|
|
816
|
Friday, December 05, 2014, 15:41 |
Anders Mjos | Conditioning Station | Development | TM2 | | RGA results | Measurement taken at 14:25. IG2 at ~7.7E-6
T |
|
|
817
|
Monday, December 08, 2014, 13:52 |
Anders Mjos | Conditioning Station | Development | TM2 | | Fixed - Not able to start water system |
|
|
|
818
|
Monday, December 08, 2014, 15:22 |
Anders Mjos | Conditioning Station | Development | TM2 | | Circuit D water test | Monday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover. |
|
|
819
|
Monday, December 15, 2014, 08:50 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TK2 level below 15 in (secondary loop) | The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping. |
|
|
820
|
Monday, December 15, 2014, 09:41 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | Water leak found at the isolation transforer |
|
|
|
821
|
Monday, December 15, 2014, 12:53 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TCSTK2 topped up |
|
|