Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 546     Entry time: Monday, November 18, 2013, 16:42
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: HV Testing 

 The Glory of TM2 continues 100V at a time. Today I brought the module to 46kV and left it there for 1 hour. During this time there was only 1 spark. I then continues at up to 53kV. At this voltage the canbus continues to be temperamental when the module sparks. The module is still conditioning and I will continue more tomorrow. Attached is the dumped data and a screen shot of the conditioning from 46kV to 53kV.

Attachment 1: the_glory_of_TM2.JPG  174 kB  | Show | Hide all
Attachment 2: 18112013_TM2_No_source_tray_HV_Test.txt  3.983 MB  | Show | Hide all
ELOG V2.9.2-2455