1668
|
Tuesday, December 19, 2017, 10:41 |
Anders Mjos | Crane | Maintenance | | | Crane powered down | The target hall crane has been powered
down by Don today in preparation for the
power shutdown over the Holidays. |
|
1669
|
Thursday, December 21, 2017, 15:11 |
Anders Mjos | Conditioning Station | Maintenance | | | Powered down devices | Powered down mechanical pumps in ISAC-I
Experimental hall, vacuum gauge and turbo
pump controllers in ISAC-I B2 North Hot Cell |
|
1674
|
Tuesday, January 02, 2018, 15:17 |
Anders Mjos | Conditioning Station | Maintenance | | | Tested chiller | Tested all 3 compressors and MP2 |
|
1675
|
Thursday, January 04, 2018, 13:28 |
Anders Mjos | Conditioning Station | Maintenance | | | Troubleshooting IG1S | TCS:IG1S is reporting vacuum levels that
seem to be too low (1E-10 to 1E-8 Torr).
The gauge was connected to the controller |
|
1683
|
Monday, January 29, 2018, 06:51 |
David Wang | Conditioning Station | Maintenance | TM1 | | TCS and TM1 vacuum pumps switched off | TCS and Tm1 vacuum pumps are switched off
this morning. TM1 TP1and TP2 work fine during
this test period. Tm1 will be moved back |
|
1687
|
Wednesday, February 14, 2018, 10:06 |
Anders Mjos | ITW | Maintenance | TM2 | | Replaced parker couplings on Window cooling line | By Anders & David. Couplings will be
taken apart for inspection. |
|
1688
|
Friday, February 16, 2018, 13:46 |
Anders Mjos | ITW | Maintenance | TM2 | | Parker coupling inspection | Findings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico. |
|
1694
|
Thursday, March 08, 2018, 14:10 |
David Wang | ITW | Maintenance | | | Two small water leak has been found in ITW. | Two small water leaks have been found on
ITW High active water system. One is from
an unused 1/4" copper valve stem. another |
|
1696
|
Thursday, April 05, 2018, 11:29 |
David Wang | ITW | Maintenance | | | ITH MP1 replacement | ITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than
old pump on inlet and exhaust so a new solid |
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
1715
|
Thursday, May 17, 2018, 11:30 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | | HV test/conditioning of damaged source tray | BIAS only. Water lines looped on top. Containment
box off.
Thursday, May 17, 2018, 11:20: Vacuum |
|
1744
|
Friday, June 29, 2018, 10:12 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Tong Cable Replacement | Tuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable |
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|
1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
1766
|
Tuesday, August 07, 2018, 10:44 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
south hot cell, for a bellows replacement. |
|
1794
|
Tuesday, September 25, 2018, 08:48 |
chad fisher | South Hot-Cell | Maintenance | | | Window leak and torque | The south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket |
|
1808
|
Tuesday, October 23, 2018, 11:32 |
David Wang | South Hot-Cell | Maintenance | | | ITW RV4S leak check. | ITW RV4S (A and B) are leak checked. They
are good. |
|
1820
|
Thursday, November 08, 2018, 09:27 |
chad fisher | South Hot-Cell | Maintenance | | | South East Manipulator cable replacement | The handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no |
|
1858
|
Monday, January 14, 2019, 07:07 |
David Wang | Conditioning Station | Maintenance | TM2 | | Restarted TCS vacuum system . | No issue. |
|
1861
|
Tuesday, January 22, 2019, 09:56 |
David Wang | ITW | Maintenance | TM2 | | ITW water system maintenance. | ITW water system maintenance is done. All
working paddle wheels and coils are replaced.
ITW water system polyurethane tubes are replaced |
|