1277
|
Wednesday, July 06, 2016, 15:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#33 | Conditioning SiC#33 | Wednesday, July 06, 2016, 15:23:
RGA on. IGs on
Friday, July 08, 2016, 17:07: |
|
|
1278
|
Friday, July 08, 2016, 08:20 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS | I connected TM2 to TCS and started water
system. |
|
|
1279
|
Friday, July 08, 2016, 16:56 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller | Plant Services group (Tony) will contact
a service tech on Monday.
Water system will be switched off |
|
|
1283
|
Tuesday, July 12, 2016, 12:42 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep) | Update schedule weekly.Attachment 1,2 |
|
|
1284
|
Wednesday, July 13, 2016, 08:47 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved | TM#3 has been moved from the north east
silo to the conditioning station. |
|
|
1285
|
Thursday, July 14, 2016, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update TH schedule 130 according to mini-shut
down change.See attachment 1,2,3,4 |
|
|
1286
|
Thursday, July 14, 2016, 13:25 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
|
|
|
1288
|
Monday, July 18, 2016, 14:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS | Last Friday July-15, TM3 was leak checked
at TCS. All air to vacuum seals on service
cap are good. Helium pressure test |
|
|
1289
|
Tuesday, July 19, 2016, 14:35 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS |
|
|
|
1290
|
Friday, July 22, 2016, 10:57 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 has been moved and connected at TCS | I started vacuum system.
I started TCS water system. The chiller
does not work properly still. But, It will |
|
|
1291
|
Monday, July 25, 2016, 08:15 |
Anders Mjos | Conditioning Station | Repair | TM3 | | HV Test | Monday, July 25, 2016, 08:14: Enabled
staging for chiller
Monday, July 25, 2016, 08:33: Disabled |
|
|
1293
|
Thursday, July 28, 2016, 11:27 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved | TM#3 with no target has been moved from
the conditioning station to the NE silo. |
|
|
1298
|
Tuesday, August 02, 2016, 15:22 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | TM4 with new target has been connected at TCS | It is being pumped now at TCS. |
|
|
1299
|
Wednesday, August 03, 2016, 08:08 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#17 | Conditioning UC#17 | Wednesday, August 03, 2016, 08:08: RGA
on
Wednesday, August 03, 2016, 11:25: |
|
|
1301
|
Wednesday, August 03, 2016, 09:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | Helium pressure test on TM4 HS line at TCS | Helium pressure test on TM4 HS line at
TCS is done.Leak detector 0.0X E-9atm.cc/sec.
5minutes, 70psi helium. |
|
|
1302
|
Wednesday, August 03, 2016, 09:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 is ready for conditioing at TCS. | I started TCS water system and installed
HV cover onto TM4. The TM4 containment
box is supplied with water also. TM4 is ready |
|
|
1303
|
Wednesday, August 03, 2016, 09:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update schedule weekly. See attachments
1,2 |
|
|
1309
|
Tuesday, August 09, 2016, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx17 | TM4 has been disconnected at TCS | I stopped TCS water pumps this morning
. The argon venting for TCS is in processing. |
|
|
1311
|
Tuesday, August 09, 2016, 11:36 |
Anders Mjos | Conditioning Station | Maintenance | | | RGA and CG1S moved | The locations (ports) for the RGA
and CG1S was swapped today by Anders and
Isaac to provide clearance for the North |
|
|
1312
|
Wednesday, August 10, 2016, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved | TM#3 has been moved from the north east
silo to the conditioning station. |
|