Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1170     Entry time: Friday, March 18, 2016, 09:34
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: Target Hall schedule for beam schedule 130 (Apr- Sep) 

I would like to post the spreadsheet of target hall schedule for beam schedule 130(Apr to Sep) first. The MS project of TH schedule for  beam schedule 130 is under construction, and will be posted later.

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep_2016.xlsx  30 kB
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep_2016.pdf  94 kB  | Show | Hide all
ELOG V2.9.2-2455