Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1171
Entry time:
Friday, March 18, 2016, 09:42
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM2
Target/Number:
Subject:
TM2 vacuum sysytem has been connected at TCS
TM2 vacuum system has been connected at TCS. Started roughing pump. Everything is good so far.
ELOG V2.9.2-2455