ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
1175
|
Monday, March 21, 2016, 11:30 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are stopped | I stopped TM2 and TCS vacuum pumps. It
will be vented and disconnected this afternoon
for tomorrow moving. |
|
1176
|
Monday, March 21, 2016, 15:27 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 has been disconnected at TCS | TM2 vacuum system has been disconnected
at TCS. Venting is in process now. |
|
1180
|
Thursday, March 24, 2016, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and TCS vacuum system has been connected | TM1 and TCS vacuum system have been connected.
All turbo-pumps are started. The pumping
down is fine. |
|
1181
|
Thursday, March 24, 2016, 13:55 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo and TM#1 was
moved from the north east silo to the conditioning |
|
1182
|
Tuesday, March 29, 2016, 08:38 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 water lines helium pressure check at TCS | TM1 water lines helium pressure check at
TCS is done. 70 psi helium was applied to
water circuits. Leak detector base leak rate |
    |
1183
|
Wednesday, March 30, 2016, 08:40 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | update the schedule according to changes.See
attachment1, 2. |
 |
1184
|
Wednesday, March 30, 2016, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Electrical Check | The results of the TM#1 electrical check
from the 29th of March 2016 |
|
1187
|
Friday, April 01, 2016, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#15 | module moved | TM#1 has been moved from the conditioning
station to the south hot cell, had UC#15
installed and then moved back to the conditioning |
|
1188
|
Friday, April 01, 2016, 14:41 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and TCS vacuum system has been connected. TCS control page white out. | I can not start the TCS pumps due to control
page white out. Control group is working
on this issue. |
|
1189
|
Monday, April 04, 2016, 11:14 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Helium pressure test on TM1 HS line at CS | New UCx target is installed on the module.
70psi helium,3 minutes. NO response on LD.
LD is pumped to bottom LR and LP during test. |
|
1190
|
Tuesday, April 05, 2016, 07:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC#15 | stop CS vacuum pumps. | Stop TCS vacuum pumps . Preparing argon
venting on TM1 and TCS.
7:34 AM, Disconnected TM1 at TCS, |
|
1197
|
Thursday, April 07, 2016, 09:24 |
Travis Cave | Conditioning Station | Maintenance | TM4 | Ta#47 | module moved | TM#4 has been moved from the south hot
cell to the conditioning station. |
|
1198
|
Friday, April 08, 2016, 07:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 vacuum has been connected in ITE. | All turbo pumps are started yesterday.
The pumping down is good over night. |
|
1202
|
Friday, April 08, 2016, 13:16 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | Update schedule weekly .see attachment
1,2 |
 |
1203
|
Monday, April 11, 2016, 09:42 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure test on TM4 HS line at CS with new Lp Ta target | 70 psi helium , 2 minutes. Base leak rate
0.0x E-9 atm.cc/sec. base pressure 0.0XE-4
torr. no response on LD.The line is good. |
|
1205
|
Monday, April 11, 2016, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM4 | | I stopped TCS and TM4 vacuum pumps. | The TM4 is still under vacuum at TCS. It
will be vented tomorrow morning.
I disconnected TM4 vacuum system |
|
1208
|
Wednesday, April 13, 2016, 10:14 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved | TM#2 has been moved from the south west
silo to the conditioning station. |
|
1209
|
Wednesday, April 13, 2016, 10:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | TCS is under roughing now. |
|
1210
|
Wednesday, April 13, 2016, 10:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | TCS is under roughing now.
2016-04-14, Started TCS and TM2 turbo-pumps
yesterday afternoon. Overnight pumping down |
|
1211
|
Thursday, April 14, 2016, 09:46 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | | TM2 water leak test | Thursday, April 14, 2016, 07:50:
RGA on
Friday, April 15, 2016, 08:09 |
|