Entry  Wednesday, July 06, 2016, 15:23, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#33, Conditioning SiC#33 SiC#33.docxTCS-2016-07-06-SiC#33.rga
 Wednesday, July 06, 2016, 15:23: RGA on. IGs on

Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.

Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature
Entry  Friday, July 08, 2016, 08:20, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS 
I connected TM2 to TCS and started water system.
Entry  Friday, July 08, 2016, 16:56, Anders Mjos, Conditioning Station, Repair, , , VFD21 OL1 fault on Chiller 
Plant Services group (Tony) will contact a service tech on Monday.
Water system will be switched off over the weekend.
Entry  Tuesday, July 12, 2016, 12:42, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp
Update schedule weekly.Attachment 1,2
Entry  Wednesday, July 13, 2016, 08:47, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved 
TM#3 has been moved from the north east silo to the conditioning station.
Entry  Thursday, July 14, 2016, 10:54, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_129_Sep_to_Dec.xlsx
Update TH schedule 130 according to mini-shut down change.See attachment 1,2,3,4
    Reply  Thursday, July 14, 2016, 13:25, Anders Mjos, Conditioning Station, Repair, , , VFD21 OL1 fault on Chiller 


    
        
            Anders Mjos wrote:
        
        
            
            Plant Services group (Tony) will contact a service tech on Monday.
Entry  Monday, July 18, 2016, 14:14, David Wang, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS 
Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good.  Helium pressure test on  TM3 water lines(except
GE, HS, and Window) were done. Leak detector has no response at 0.0xE-9 atm.cc/sec. They are leak free.
    Reply  Tuesday, July 19, 2016, 14:35, Aurelia Laxdal, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS 


    
        
            David Wang wrote:
        
        
            
            Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good.  Helium pressure
Entry  Friday, July 22, 2016, 10:57, David Wang, Conditioning Station, Repair, TM3, , TM3 has been moved and connected at TCS 
I started vacuum system.
I started TCS water system. The chiller does not work properly still. But, It will not affect the TM3 HV conditioning.  HV cover is installed
on TM3 in TH. The module is ready for HV conditioning.
Entry  Monday, July 25, 2016, 08:15, Anders Mjos, Conditioning Station, Repair, TM3, , HV Test TM3_HV_conditioning_2016-07-25.docxTCS-2016-07-25_TM3_no_target.rgaTCS-2016-07-26_TM3_no_target.rga
 Monday, July 25, 2016, 08:14: Enabled staging for chiller
Monday, July 25, 2016, 08:33: Disabled staging. Fault 2. Staging does not work at this point.
Monday, July 25, 2016, 08:34: Running CP1 manually to cool down water.
Entry  Thursday, July 28, 2016, 11:27, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved 
TM#3 with no target has been moved from the conditioning station to the NE silo.
Entry  Tuesday, August 02, 2016, 15:22, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, TM4 with new target has been connected at TCS 
It is being pumped now at TCS.
Entry  Wednesday, August 03, 2016, 08:08, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#17, Conditioning UC#17 UC#17.docxTCS-2016-08-03_UC#17.rgaTCS-2016-08-08_UC#17.rga
Wednesday, August 03, 2016, 08:08: RGA on
Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)
Wednesday, August 03, 2016, 11:25: PS on
Entry  Wednesday, August 03, 2016, 09:45, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, Helium pressure test on TM4 HS line at TCS  
Helium pressure test on TM4 HS line at TCS  is done.Leak detector 0.0X E-9atm.cc/sec.  5minutes, 70psi helium.    No response
on LD.
Entry  Wednesday, August 03, 2016, 09:49, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 is ready for conditioing at TCS. 
I started TCS water system and installed HV cover onto TM4.  The TM4 containment box is supplied with water also. TM4 is ready for conditioning
at TCS.
Entry  Wednesday, August 03, 2016, 09:56, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Update schedule weekly. See attachments 1,2
Entry  Tuesday, August 09, 2016, 07:15, David Wang, Conditioning Station, Standard Operation, TM4, UCx17, TM4 has been disconnected at TCS 
I stopped TCS water pumps this morning . The argon venting for TCS is in processing.
Entry  Tuesday, August 09, 2016, 11:36, Anders Mjos, Conditioning Station, Maintenance, , , RGA and CG1S moved Old.JPGNew.JPG
 The locations (ports) for the RGA and CG1S was swapped today by Anders and Isaac to provide clearance for the North Hot Cell ventilation. Attached
photos show old and new locations.
Entry  Wednesday, August 10, 2016, 09:44, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved 
TM#3 has been moved from the north east silo to the conditioning station.