Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 120 of 138  Not logged in ELOG logo
  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1230   Wednesday, May 11, 2016, 13:16 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.TM2 and TCS vacuum system has been connected.
I started all turbo pumps. Everything is
good so far.
  
  1231   Friday, May 13, 2016, 10:08 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS and window line at CS with new Lp Ta targetThese two lines are passed helium pressure
test this morning. The LD base leak rate
0.0 X E-9 atm.cc/sec. The base pressure 0.0
  
  1232   Friday, May 13, 2016, 10:12 David WangConditioning StationStandard OperationTM2 TM2 water lines, heaters, EE, and EL are connected at TCS.The HV  cover is installed on to TM2
after the connections. The HV key is returned
back to B2 level. The TCS Faraday cage is
  
  1233   Monday, May 16, 2016, 10:48 Anders MjosConditioning StationMaintenance  Topped up water in TCS:TK2 Filled from 15 to 25 in   
  1235   Monday, May 16, 2016, 13:26 Anders MjosConditioning StationStandard OperationTM2Ta#48Conditioning Ta#48 Monday, May 16, 2016, 13:20: BIAS/EL/EE
30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping
 Ta#48.docx 
  1240   Friday, May 20, 2016, 08:13 David WangConditioning StationStandard OperationTM2Ta#48I switched off TCS and TM2 water systemDisconnected  TM2 at TCS(vacuum system
still on). Purged all TM2 water lines for
helium pressure test.
  
  1241   Friday, May 20, 2016, 10:38 David WangConditioning StationStandard OperationTM2Ta#48Helium pressure test on TM2 with new Lp Ta targetLD base LR: 0.0 X E-9. Base pressure:0.0
X E-4. 70 psi helium. 5 minutes each circuit.
  
  1242   Tuesday, May 24, 2016, 10:39 David WangConditioning StationStandard OperationTM2Ta#48TM2 and TCS turbo-pumps have been switched off this morning.The TCS and TM2 are still under vacuum
without venting
  
  1243   Tuesday, May 24, 2016, 10:42 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update the TH schedules. See attachments
1, 2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1256   Tuesday, June 07, 2016, 17:11 David WangConditioning StationStandard OperationTM4UC#16TM4 UCx16 electrical check and leak check at SHCChad and I finished the TM4 UCx6 electrical
check and leak check at SHC. Leak check result
on HS line is good. There is a dead short
 UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf 
  1257   Tuesday, June 07, 2016, 17:14 David WangConditioning StationStandard OperationTM4UC#16TM4 with UCx16 target has been moved from SHC to TCS.Bill and Yasmine did the move remotely
this afternoon. The move is successful.
  
  1258   Tuesday, June 07, 2016, 18:17 David WangConditioning StationStandard OperationTM4UC#16TM4 and TCS turbo pumps are started.TM4 and TCS vacuum system are connected.
  Turbo pumps are started.  Everything
is fine so far.
  
  1259   Wednesday, June 08, 2016, 08:25 Anders MjosConditioning StationStandard OperationTM4UC#16Conditioning UC#16 Wednesday, June 08, 2016, 08:15:
RGA on

Thursday, June 09, 2016,
 UC#16.docxTCS-2016-06-08_UC#16.rga 
  1260   Thursday, June 09, 2016, 08:37 David WangConditioning StationStandard OperationTM4UC#16TM4 with UCx16 helium pressure test at TCSI did a helium pressure test on TM4 at
TCS with UCX16 target installed on the module.
No leak has been found on all using water
 TM4_withUCx16_helium_pressure_test_at_TCS.pdf 
  1261   Thursday, June 09, 2016, 09:44 David WangConditioning StationStandard OperationTM4UC#16TM4 has been connected at TCSIt is ready for HV conditioning/ heating.    
  1262   Thursday, June 09, 2016, 10:04 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Weekly update .  Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1263   Tuesday, June 14, 2016, 08:04 David WangConditioning StationStandard OperationTM4UC#16TM4 has been disconnected at TCSThe TM4 and TCS are vented with argon.    
  1272   Wednesday, July 06, 2016, 07:06 David WangConditioning StationStandard Operation  venting TCS with argon.I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon.
  
  1275   Wednesday, July 06, 2016, 13:38 Travis CaveConditioning StationStandard OperationTM2SiC#33module movedTM#2 with SiC#33 has been moved from the
south hot cell to the conditioning station.
  
  1276   Wednesday, July 06, 2016, 14:25 David WangConditioning StationStandard OperationTM2 TCS and TM2 turbo-pumps have been started.The TCS and TM2 are pumping down.   
ELOG V2.9.2-2455