1696
|
Thursday, April 05, 2018, 11:29 |
David Wang | ITW | Maintenance | | | ITH MP1 replacement | ITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than
old pump on inlet and exhaust so a new solid |
|
244
|
Thursday, February 14, 2013, 09:31 |
David Wang | ITW | Repair | | | ITH MP1 is replaced. | Edi and I replaced the broken ITH MP1 in
target hall with a new pump. The old pump
was leak on oil. There were no oil had been |
|
2189
|
Thursday, February 18, 2021, 12:33 |
David Wang | ITE | Repair | | | ITE:TP1S | ITE TP1S new pump is installed today. Reset
pump life time on controller to 0 hr. |
|
2360
|
Tuesday, August 23, 2022, 11:33 |
Carla Babcock | ITE | Repair | | | ITE:ANODE swapped with TCS:ANODE | ITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room: |
|
2052
|
Monday, January 27, 2020, 10:40 |
David Wang | Cooling | Maintenance | | | ITE/ITW supply water presuure on dump circuits. | With both stations in operation,ITE dump
supply gauge reading is 27 psi. ITW is 20
Psi. I adjusted ITW dump pressure to |
|
2299
|
Tuesday, January 25, 2022, 08:57 |
David Wang | ITE/ITW | Standard Operation | | | ITE/ITW have been cleaned with vacuum canister. | ITE/ITW are cleaned with vacuum canister.
HV cage inside and blue nylon insulators
are wiped. Garbage inside the pits |
|
1869
|
Friday, February 15, 2019, 12:09 |
David Wang | ITE | Maintenance | TM4 | | ITE water system maintenance. | The ITE water system maintenance job is
done. Changed all paddle wheels and coils
on ITE flow sensors. All using water poly-tubes |
|
2225
|
Wednesday, June 09, 2021, 10:15 |
David Wang | ITE/ITW | Standard Operation | TM4 | UCX33. | ITE water signal interlock check. | Annual ITE water signal interlock check
is done. HS, TAR, TUBE, MSP, EE, COIL
1, containment box window, HVC1, HVC2, 2A |
|
1932
|
Tuesday, June 04, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM2 | | ITE water signal interlock check. | ITE water signal interlock check is done.
Everything is good. Coil 2 circuit
no longer used in ITE . PQRU are looped as |
|
2459
|
Wednesday, June 14, 2023, 13:37 |
David Wang | ITE | Standard Operation | TM4 | | ITE water signal interlock check | ITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A |
|
2046
|
Friday, January 10, 2020, 10:26 |
David Wang | ITE | Standard Operation | | | ITE water signal inerlock check. | ITE water signal interlock
check is done. Everything is good.
It is a annual check we do in winter shut |
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. | ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. |
|
1548
|
Tuesday, May 23, 2017, 14:10 |
David Wang | ITE | Standard Operation | | | ITE water interlock check is done. | We do this check once a year now. Rene
found a target oven reset issue during the
check . He will consult with Friedhelm. The |
|
2198
|
Thursday, March 11, 2021, 11:42 |
Frank Song | ITE | Maintenance | | | ITE water flow wheels and coils replacement. | ITE water flow wheels
and coils are replaced. Wheels and coils |
|
613
|
Thursday, March 06, 2014, 06:58 |
David Wang | ITE | Maintenance | TM3 | | ITE vacuum and leak check on ITE BL2A window flange. | ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low |
|
2088
|
Tuesday, March 17, 2020, 14:59 |
David Wang | ITE | Development | TM4 | P2N | ITE turbopumps are started. | They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. |
|
2113
|
Monday, June 29, 2020, 10:09 |
David Wang | ITE | Standard Operation | TM4 | P2N test. | ITE turbo pumps are stopped | ITE venting is in processing. |
|
655
|
Monday, May 05, 2014, 13:05 |
David Wang | ITE | Repair | TM3 | | ITE target module flange seal has been replaced. | ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before |
|
1479
|
Wednesday, April 05, 2017, 11:57 |
David Wang | ITE | Maintenance | | | ITE target module flange o-ring repalcement | ITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. |
|
2237
|
Friday, July 30, 2021, 16:31 |
Carla Babcock | ITE | Repair | | | ITE re-wire | See the attached for the way ITE has been
re-wired for the Ta62 run. Note also that
the copper block in the schematic on TBHT |
|