Message ID: 1058
Entry time: Tuesday, September 01, 2015, 10:38
|
Author: |
David Wang |
Category: |
ITW |
Type: |
Maintenance |
Module: |
TM2 |
Target/Number: |
|
Subject: |
ITW top tank flange clean up and r-ring replacement. |
|
|
During last run, ITW dump circuit had a water leak on an adaptor below the pressure gauge. The top tank flange, slot, and O-ring were water contaminated by the leak. I removed the old o- ring, cleaned up the flange and o-ring slot, and put a new o-ring into the flange. Some pictures will be attached in this mail later. |
|
|
|