Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1007     Entry time: Tuesday, July 21, 2015, 12:38
Author: David Wang 
Category: ITW 
Type: Repair 
Module:  
Target/Number:  
Subject: ITW external water leak on dump circuit has been fixed. 

The leaking 1/8 NPT(M)-1/4NPT(F) adapter on the ITW dump circuit is replaced.

ELOG V2.9.2-2455