  2233   Thursday, July 08, 2021, 11:45 David WangSouth Hot-CellStandard OperationTM4Ta#62TM4 Ta#62 leak check and lectrical check result at SHC and TCS. At SHC: HS line no leak . electrical check
result is fine. At TCS: helium pressurized
HS line to 70psi, 3 minutes. LD  leak
 Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf 
  2238   Wednesday, August 04, 2021, 17:24 David WangNorth Hot-CellStandard OperationTM2UCx34#UCX 34# on TM2 electical check and HS leak check at NHC.The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good.
 UCX34_TM2_electrical_check.pdf 
  2256   Wednesday, October 06, 2021, 10:42 David WangITERepair  ITE IG1S cable end connector replacementITE IG1S cable end connector replacement
has been finished by Roy Huang. 
  
  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS. Helium pressure test on TM4 HS line at
TCS is done.  LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS
  
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.Remotely remove TM4(Ta#63) from TCS to
ITE. The move is smooth and successful. 
  
  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE. TM4 has been connected in ITE. See attachment
for checklist.
 from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg 
  2284   Thursday, January 06, 2022, 10:37 David WangITWStandard OperationTM2 ITW vacuum vessel and TM2 internal cooling lines leak check in pit. Frank  and I finished ITW and TM2 leak
check. TM2 internal water-cooling lines 
are leak free. They passed 70 psi helium
  
  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec.  
  
  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary  vacuum
vessel leak check has been down.  Base
leak rate 0.0x E-9 atm.cc/sec on LD. Only
  
  2287   Monday, January 10, 2022, 12:38 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from ITW to NHC.Travis and Nadia moved TM2 from ITW to
NHC this morning. The move is smooth and
successful.
  
  2288   Tuesday, January 11, 2022, 11:50 David WangITWMaintenance   ITW Exit module 1 side sqaure panel O-ing seal replacement.Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal
  
  2289   Tuesday, January 11, 2022, 11:51 David WangNorth Hot-CellStandard OperationTM2 TM2 has been moved from NHC to SMP.TM2( no target ) has been moved  from
NHC to SMP.  The moving is smooth and
successful. 
  
  2294   Wednesday, January 19, 2022, 13:26 David WangCraneStandard Operation  Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames.
 2022-01-19_170.jpg2022-01-19_173.jpg2022-01-19_175.jpg2022-01-19_176.jpg 
  2295   Wednesday, January 19, 2022, 13:36 David WangCraneStandard Operation  Targe hall crane below hook attachment pins and plates annual inspection. Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates.
 2022-01-19_174.jpg2022-01-19_172.jpg 
  2296   Thursday, January 20, 2022, 08:18 David WangNorth Hot-CellStandard OperationTM4No targetTM4 was removed from NHC to S_W silo yesterday. TM4 was removed from NHC to S_W silo yesterday. 
The remove is smooth and successful. 
  
  2298   Monday, January 24, 2022, 11:18 David WangITE/ITWStandard Operation  TH emergency exit hatch functional checkTH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine.
  
  2299   Tuesday, January 25, 2022, 08:57 David WangITE/ITWStandard Operation  ITE/ITW have been cleaned with vacuum canister. ITE/ITW  are cleaned with vacuum canister.
HV  cage inside and blue nylon insulators
are wiped.  Garbage inside the pits
  
  2300   Tuesday, January 25, 2022, 12:49 David WangITE/ITWStandard Operation  Target station vacuum system visual inspection. Two shielding blocks  above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and
  
  2301   Wednesday, February 02, 2022, 11:05 David WangCraneStandard Operation  Target hall overhand crane annual insepection. Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag
  