Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2213     Entry time: Monday, April 26, 2021, 13:02
Author: David Wang 
Category: South Hot-Cell 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: TM4 new steerer cable installation. 

New steerer cables are installed in TM4. Cables are properly routed in containment box and service cap top. After job, TP2 is installed back onto module top.

ELOG V2.9.2-2455