  758   Wednesday, October 08, 2014, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 has been moved from the North West Silo to the conditioning station.

  757   Friday, September 26, 2014, 10:56 Travis CaveSpent Target VaultStandard Operation UC#10Spent target move

UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF.

Attachment 1: Vault_Storage_September_26_2014.pdf
Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf Vault_Storage_September_26_2014.pdf
  756   Wednesday, September 24, 2014, 15:16 David WangITEStandard OperationTM4Ta#44Reconnected TM4 in ITE.

TM4 has been reconnected back to ITE. I started all turbo pumps on ITE and TM4. The ITE TP4s was extremely difficult to start. This pump is new, and was replaced before  the last ITE beam time on July. After several times try and starting mode switch, it is started. Its temperature and current draw showed on controller and very good after the start. The current draw on ITE TP1s is  s a little bit high and unstable. I will keep watching on ITE TP1s. I think the ITE TP1s is close to the end of the pump life. Other pumps are good so far.  

  755   Wednesday, September 24, 2014, 15:03 David WangSouth Hot-CellStandard OperationTM4Ta#44Leak check on TM4 HS water line with new Ta#44 target. at SHC

This morning Chad and I leak checked TM4 HS line with new Ta#44 target installed. I calibrated LD before the check. Before check, the LD base LR 0.0xE-9 atm.cc/sec, base LP 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and did a flush around the target. There is no any response had been found on LD,. The line is good on leak tight. with spray method.  No helium pressure test on the HS line at CS since TM4 was moved back to ITE directly.

  754   Wednesday, September 24, 2014, 10:41 Travis CaveITEStandard OperationTM4Ta#44module move

TM#4 with Ta#44 has been moved from the south hot cell to the east target station.

  753   Tuesday, September 23, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM4UC#10, Ta#44Electrical check

Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details.

Attachment 1: TM4_UC10_postbeam_shc.PDF
TM4_UC10_postbeam_shc.PDF
Attachment 2: TM4_Ta44_elecchk_shc.PDF
TM4_Ta44_elecchk_shc.PDF
  752   Tuesday, September 23, 2014, 12:24 chad fisherSouth Hot-CellStandard OperationTM4Ta#44Ucx10 removed Ta#44 installed

Ucx#10 has been removed from TM4 and placed in a pail with argon.

Ta#44 has been installed onto TM4 and target heater bolts torqed to 130 in.lbs.

  751   Tuesday, September 23, 2014, 11:49 David WangITEStandard OperationTM4UCx #10TM4 has been disconnected in ITE.

TM4 has been disconnected and moved to SHC from ITE. ITE was vented with argon before move.

  750   Tuesday, September 23, 2014, 10:50 Travis CaveSouth Hot-CellStandard OperationTM4UC#10module move

TM#4 with UC#10 has been moved from the east target station to the south hot cell.

  749   Tuesday, September 16, 2014, 10:41 David WangITWStandard OperationTM1ZrC #45 Shielding blocks have been transferred from ITE to ITW.

5 Shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam

  748   Monday, September 15, 2014, 11:23 Travis CaveSpent Target VaultStandard Operation  Spent target field measurements

Field measurements on the spent target has finished see the attached PDF for details.

Attachment 1: Vault_Storage_September_15_2014.pdf
Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf Vault_Storage_September_15_2014.pdf
  747   Friday, September 12, 2014, 14:21 Travis CaveSpent Target VaultStandard Operation  Spent target field measurements

Five of the ten target we want to measure the fields on were done today. We will finish up on Monday, and the spent target storage spreadsheet will be updated then.

  746   Wednesday, September 10, 2014, 11:47 David WangITWStandard OperationTM1 TM1 has been connected in ITW.

TM1 has been connected in ITW.  ITW and TM1 turbo pumps have been started. Water is supplied to TM1 only. Everything is good so far.

  745   Wednesday, September 10, 2014, 08:52 Travis CaveITWStandard OperationTM1ZrC#6module move

TM#1 with ZrC#6 has been moved from the conditioning station to west target station.

  744   Wednesday, September 10, 2014, 07:12 David WangITWRepairTM1 Removed ITW HS and COIL flow rate monitors.

Removed ITW HS and COIL flow rate monitors installed at the beginning of this year. They were installed on these two circuits for testing.They are broken during last run in ITW due to radioactive field.

  743   Monday, September 08, 2014, 13:44 David WangConditioning StationStandard OperationTM1ZrC#6TM1 is disconnected at CS.

Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning.

  742   Friday, September 05, 2014, 13:07 Travis CaveSpent Target VaultStandard Operation Ta#43Spent target move

Ta#43 has been moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_September_5_2014.pdf
Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf Vault_Storage_September_5_2014.pdf
  741   Friday, September 05, 2014, 07:15 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.

Helium pressure test on TM1 HS water line at CS is done. 80psi helium with LD 0.0xE-9 atm.cc/sec. 3 minutes test and no response on LD. The line is leak tight.

  740   Thursday, September 04, 2014, 11:19 David WangConditioning StationStandard OperationTM1 TM1 is connected in CS.

TM1 is connected in CS. All turbo pumps are started.

  739   Thursday, September 04, 2014, 09:47 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new target installed

Chad and I  leak checked the TM1 HS line with new target installed. Base leak rate 0.0xe-9 atm.cc/sec. No any response has been found on LD. The line will be pressurized at CS with helium tomorrow.