881
|
Wednesday, April 01, 2015, 10:52 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module move | TM#4 with Ta#45 has been moved from the
conditioning station to the east target station. |
|
880
|
Wednesday, April 01, 2015, 06:56 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 has been disconnected at CS. | TM4 has been disconnected at CS. The CS
and TM4 is venting for move. Anders stopped
vacuum and water system yesterday. |
|
879
|
Tuesday, March 31, 2015, 11:36 |
chad fisher | South Hot-Cell | Development | TM2 | | TM2 Optics Tray Complete | TM2 optics tray is complete.
Master alignment tray: 0 up/down,
0 left/right |
  |
878
|
Monday, March 30, 2015, 09:03 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | Ta#45 | Ta#45 Conditionoing | Monday, March 30, 2015, 08:59: Reset chiller
by switching on off power (fault 2)
Monday, March 30, 2015, 09:02: Switched |
|
877
|
Monday, March 30, 2015, 07:38 |
David Wang | ITE | Standard Operation | TM4 | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update | Updated schedule this morning after last
Fridays ISAC facility support group meeting.
Updated schedule on 2015-April -02. |
   |
876
|
Friday, March 27, 2015, 11:29 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 is connected at CS | TM4 has been connected at CS which includes
high current cables, water lines, EE cable,
and Enizel lens cable. The HV cover has been |
  |
875
|
Friday, March 27, 2015, 10:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS | The helium pressure test on TM4 HS line
at conditioning station is done. No leak.
I also leak checked all vacuum seals on TM4 |
  |
874
|
Thursday, March 26, 2015, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#45 | Electrical check | Electrical check of TM#4 with Ta#45 at
the conditioning station, see attached pdf
for details. |
|
873
|
Wednesday, March 25, 2015, 14:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 and CS turbo- pumps are started . | I connected TM4 and CS vacuum system after
TM4 move. CS roughing pump was started first
this morning. Later, Anders, Bill and I started |
|
872
|
Wednesday, March 25, 2015, 14:25 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Leak check on TM4 HS water line with new Ta#45 target. at SHC | Chad and I leak checked TM4 HS water line
with new Ta#45 target installed at SHC. Leak
detector base leak rate 0.0Xe-9 atm.cc/sec, |
|
871
|
Wednesday, March 25, 2015, 10:37 |
chad fisher | South Hot-Cell | Development | | | TM2 optics tray build | TM2 optics tray build is continuing. Going
well. Hope to have assembly and alignment
finished by Friday. |
  |
870
|
Tuesday, March 24, 2015, 13:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical check | TM#4 electrical checks with and without
the target installed, installed target is
Ta#45. |
 |
869
|
Tuesday, March 24, 2015, 09:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Ta#45 installed | Ta#45 has been installed onto TM4 and is
ready for leak and electrical check. High
current fasteners torqued to 130 in.lbs. |
|
868
|
Tuesday, March 24, 2015, 08:46 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 with no target has been moved
from conditioning station to the south hot
cell. |
|
867
|
Monday, March 23, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | | Ta#45 | Ta#45 inserted into hot cell | Ta#45 has been inserted into the hot cell.
Swipe taken of inner tool port area: 100000
counts/min. |
|
866
|
Monday, March 23, 2015, 07:56 |
David Wang | ITE | Standard Operation | | | TH Shut Down Activities Schedule Feb 23th- Apr 15th update | This schedule is following Dons schedule
on module moves. See attachments for updating.
2015-03-27: Weekly update the schedule. |
   |
865
|
Friday, March 20, 2015, 13:37 |
chad fisher | South Hot-Cell | Development | | | TM2 Optics Tray | Final assembly and alignment of TM2 optics
tray continued today. Front section is "aligned". |
![20150320_113132[2].jpg 20150320_113132[2].jpg](attachment.png) |
864
|
Tuesday, March 17, 2015, 10:33 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#11 | Spent Target Move | The spent UC#11 has benn moved from the
south hot cell to the spent target vault.
See attached PDF for details. |
|
863
|
Monday, March 16, 2015, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | No target | Module move | TM#4 from south hot cell to the conditioning
station no target is attached to the module. |
|
862
|
Monday, March 16, 2015, 09:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | Module move | TM#4 with UC#11 moved from the east target
station to the south hot cell. |
|