Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 865     Entry time: Friday, March 20, 2015, 13:37
Author: chad fisher 
Category: South Hot-Cell 
Type: Development 
Module:  
Target/Number:  
Subject: TM2 Optics Tray 

Final assembly and alignment of TM2 optics tray continued today. Front section is "aligned".

Attachment 1: 20150320_113132[2].jpg  1.452 MB  | Show | Hide all
Attachment 2: 20150320_113018_1[1].jpg  608 kB  | Show | Hide all
ELOG V2.9.2-2455