  ID Date Author Category Type Module Target/Number Subject Text Attachments
  541   Tuesday, November 12, 2013, 14:33 Bevan MossConditioning StationRepair  Cooling manifold returned The cooling manifold for the conditioning
station high power water cooled lines has
been returned. The cooling package can once
  
  540   Tuesday, November 12, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM2 Turbo pumps started The turbo pumps have been started
on TM2 and the conditioning station.
  
  539   Tuesday, November 12, 2013, 12:43 Bevan MossConditioning StationStandard OperationTM2 TM2 moved from SHC to TCS TM2 was moved by myself and David
from the SHC to the TCS. Move went well.
Curiously the fields on the module were measured
  
  538   Tuesday, November 12, 2013, 10:59 Bevan MossSouth Hot-CellStandard OperationTM2 Electrical Test Don Jackson and Myself completed
started an electrical test on TM2. All lines
passed the with OL to ground. When testing
 tm2_elec_test.pdf 
  537   Tuesday, November 12, 2013, 09:51 David WangITEStandard OperationTM3 TM3 disconnectionTM3 has been disconnected this morning
and  purged all HV water lines. I found
the power plug for all turbo pump fans wasnt
  
  536   Wednesday, November 06, 2013, 10:41 David WangSouth Hot-CellRepairTM2 Installed 2 turbopumps on TM2Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation.
  
  535   Tuesday, November 05, 2013, 10:37 chad fisherSouth Hot-CellRepairTM2 Thermocouple wire removalThe old thermocouple wire has been sucessfully
removed from the module.
Thanks Bevan, Travis and David.
  
  534   Monday, November 04, 2013, 10:46 chad fisherSouth Hot-CellRepairTM2 TM2 ExplorationTM2 is now in the hot cell with the containment
box off for inspection and eventual blank
off off the water blocks.
 TM2_20131104.jpg 
  533   Friday, November 01, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 has been moved from the north west
silo to the south hot cell. The module has
a field of about 3.1mSv/hr when it was lowered
  
  532   Thursday, October 31, 2013, 11:38 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_EOB.pdf 
  531   Thursday, October 31, 2013, 10:36 David WangITWStandard OperationTM4 I moved 5 shielding blocks from ITE to ITW.I moved 5 shielding blocks from ITW to
ITE. The ITW  is configured to take
proton beam.
  
  530   Friday, October 25, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Target conductance

    

       
            
 TM#4_Ta#41_elec_test_SHC.PDF 
  529   Friday, October 25, 2013, 13:39 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementswith TM4 in ITW as measured today in the
electrical room by David and Anders.
 
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow_wITW-TM4.pdf 
  528   Friday, October 25, 2013, 10:26 Travis CaveITWStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has been moved from the
south hot cell to the west target station.
  
  527   Friday, October 25, 2013, 06:58 David WangSouth Hot-CellStandard OperationTM4 Leak check on TM4 target heat shieldMaico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because
  
  526   Thursday, October 24, 2013, 15:54 Grant MinorSouth Hot-CellStandard OperationTM4Ta#41Target conductance

    

       
            
  
  525   Thursday, October 24, 2013, 15:43 Anders MjosSouth Hot-CellStandard OperationTM4Ta#41Target conductanceThe conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful
 Ta#41_electrical_measurement_TGHT_in_SHC.pdf 
  524   Thursday, October 24, 2013, 11:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the conditioning station to the south hot
cell.
  
  523   Thursday, October 24, 2013, 11:31 Travis CaveSpent Target VaultStandard Operation UC#7Spent target moveUC #7 has been moved from the south hot
cell to the spent target vault, it was placed
in pail #110 and put in slot 8B of the vault,
 Vault_Storage_October_24_2013.pdf 
  522   Wednesday, October 23, 2013, 12:07 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved back
to the south west silo from the south hot
cell.
  