368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|
366
|
Monday, May 27, 2013, 16:01 |
Bevan Moss | Conditioning Station | Repair | | | CanBUS card | During HV conditioning of TM4 with
Ta#40 there was a spark at ~43 kV that caused
the Bias card to "fry". Dave Morris |
|
365
|
Monday, May 27, 2013, 15:59 |
Bevan Moss | Conditioning Station | Repair | | | Compressor fault | Once again the 7.5 compressors are
tripping due to faults. I believe it is due
to over pressure as a result of the chiller |
|
364
|
Monday, May 27, 2013, 11:55 |
chad fisher | South Hot-Cell | Standard Operation | | | Special Tooling for RFQ target | The special tool made for the RFQ target
autopsy has been inserted into the hot cell.
|
|
363
|
Monday, May 27, 2013, 10:37 |
Bevan Moss | Conditioning Station | Maintenance | TM4 | | Cooling Systems topped off | Rob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary |
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
361
|
Thursday, May 23, 2013, 14:12 |
Bevan Moss | Conditioning Station | Maintenance | | | Primary Circuit Drained and Flushed | Rob Walker has drained the primary
side of the conditioning station. It will
be flushed, filled and chemically treated. |
|
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|
359
|
Thursday, May 23, 2013, 14:07 |
Bevan Moss | Conditioning Station | Repair | | | Chiller Unit Repaired | ESC came today and "repaired"
the chiller. There was something wrong with
the VFD controller. The were able to get |
|
358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
357
|
Thursday, May 23, 2013, 09:51 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta#40 has been moved from the
south hot cell to the conditioning station. |
|
356
|
Wednesday, May 22, 2013, 14:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Ta#40 installed | Ta#40 has been installed.
Leak checking and high voltage tomorrow
before the move. |
|
355
|
Wednesday, May 22, 2013, 10:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south west silo to the south hot cell. |
|
354
|
Tuesday, May 21, 2013, 11:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | May 16th Long HV conditioning | On May 16th 2013 the module was HV conditioned
all day. As a result the maximum stable voltage
has been increased to about 47kV (~4kV more |
|
353
|
Tuesday, May 21, 2013, 11:38 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo. |
|
352
|
Friday, May 17, 2013, 12:02 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | | module move | TM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo. |
|
351
|
Friday, May 17, 2013, 10:04 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | Manipulator has been sucessfully repaired.
Recieved 0.19 mSv. Took Approx. 10-20 minutes |
|
350
|
Wednesday, May 15, 2013, 18:12 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | HV test repeat | After discussion with Friedhelm it
was decided to continue trying to condition
the module today before moving it tomorrow. |
|
349
|
Wednesday, May 15, 2013, 17:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | | TM3 in place but not connected | To confirm that the sparking was
coming from the module rather than the conditioning
station TM3 was grounded and the conditioning |
|