  2508   Wednesday, November 29, 2023, 12:45 Carla BabcockITEStandard Operation  gas lines pumped downPumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator
  
  2507   Tuesday, November 28, 2023, 12:58 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - Silo to SHCTM3 was moved from the Silo to South Hot
Cell. 
  
  2506   Monday, November 27, 2023, 12:01 chad fisherSouth Hot-CellMaintenance  Manipulator tong cable and wrist replacementBroken tong cable on SW manipulator (serial
#8106) of SHC was replaced today. 
Following ISAC Hot Cell entry procedure,
  
  2505   Thursday, November 23, 2023, 11:15 Adam NewsomeCraneRepair  Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker]It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow,
  
  2504   Wednesday, November 22, 2023, 12:24 Adam NewsomeSpent Target VaultStandard Operation Ta#65Spent Target MoveThe spent Ta#65 target was removed from
the south hot cell and placed  in the spent
target vault. It was placed in pail #284
  
  2503   Monday, November 20, 2023, 12:28 Eric LaheSouth Hot-CellMaintenance  Light Bulb Replacement - South Hot Cell roof lights 3 light bulbs replaced in the ISAC
South Hot Cell - North West light, South
west light, and South East light bulbs. Northeast
  
  2502   Friday, November 17, 2023, 11:28 Adam NewsomeSpent Target VaultMaintenance  Storage vault: issue observed with door openingDuring operation today, it was observed
that the main vault door had issues opening..
typically when the door was around 80-90%
 PXL_20231117_200245076.jpgPXL_20231124_210005281.jpg 
  2501   Friday, November 17, 2023, 11:12 Adam NewsomeSpent Target VaultStandard Operation  Four pails moved from main storage to mini storageThe following four pails were moved from
the main storage vault to the mini storage
vault, to stage for shipping in Jan. 2024:
 Target_Index_2023-11-17.pdf 
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check TM4 with new target UCx#43 was electrical
and leak checked on SHC.
 TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf 
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnectionTM4 with spent target Ta#65 was disconnected
in ITE and moved to SHC.
 TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf 
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent targetTM4 with spent target Ta#65 was electrical
checked right after being moved to SHC. 
 TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf 
  2497   Tuesday, October 31, 2023, 12:12 Travis CaveSpent Target VaultStandard Operation  Spent target measurements All 20 targets in the vault were
measured. The target spread sheet updated.
See attached PDF for details.
 Target_Index_2023-10-31.pdf 
  2496   Friday, October 13, 2023, 11:51 David WangITE/ITWMaintenance  ITH:MP1 is replaced due to its poor performance. ITH:MP1 is replaced this morning due to
its poor performance started yesterday afternoon.
The general field in pit is about 260usv/hr.
  
  2495   Friday, October 13, 2023, 11:46 David WangCoolingMaintenance  HALCW system O2 sensor service and calibration.HALCW system O2 sensor service and calibration
were done in Sep 26th. electrolyte and membrane
on rose mount sensor 499ADO were refilled
  
  2494   Friday, October 06, 2023, 10:47 Travis CaveSpent Target VaultStandard Operation Nb#11Spent Target Move The spent Nb#11 target was removed
from the south hot cell and place in the
spent target vault. It was placed in pail
 Target_Index_2023-10-06.pdf 
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection TM2 with new target Ta#66 was connected
in ITW. 
 TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf 
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check TM2 with new target Ta#66 had an
electrical check and leak check on SHC. 
 TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf 
  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check An electric checked right after TM2
was moved from ITW. 
 TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf 
  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection TM2 with target Nb#11 has been disconneted
in ITW. The HS line was purged with Nitrogen
in station. 
 TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf 
  2489   Thursday, September 14, 2023, 11:16 Adam NewsomeSpent Target VaultDevelopment Ta #58Investigation of Pail 211 (Ta #58)Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the
 Report_on_Inspection_of_Pail_211_on_2023-09-14.pdf 