  2501   Friday, November 17, 2023, 11:12 Adam NewsomeSpent Target VaultStandard Operation  Four pails moved from main storage to mini storageThe following four pails were moved from
the main storage vault to the mini storage
vault, to stage for shipping in Jan. 2024:
 Target_Index_2023-11-17.pdf 
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check TM4 with new target UCx#43 was electrical
and leak checked on SHC.
 TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf 
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnectionTM4 with spent target Ta#65 was disconnected
in ITE and moved to SHC.
 TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf 
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent targetTM4 with spent target Ta#65 was electrical
checked right after being moved to SHC. 
 TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf 
  2497   Tuesday, October 31, 2023, 12:12 Travis CaveSpent Target VaultStandard Operation  Spent target measurements All 20 targets in the vault were
measured. The target spread sheet updated.
See attached PDF for details.
 Target_Index_2023-10-31.pdf 
  2496   Friday, October 13, 2023, 11:51 David WangITE/ITWMaintenance  ITH:MP1 is replaced due to its poor performance. ITH:MP1 is replaced this morning due to
its poor performance started yesterday afternoon.
The general field in pit is about 260usv/hr.
  
  2495   Friday, October 13, 2023, 11:46 David WangCoolingMaintenance  HALCW system O2 sensor service and calibration.HALCW system O2 sensor service and calibration
were done in Sep 26th. electrolyte and membrane
on rose mount sensor 499ADO were refilled
  
  2494   Friday, October 06, 2023, 10:47 Travis CaveSpent Target VaultStandard Operation Nb#11Spent Target Move The spent Nb#11 target was removed
from the south hot cell and place in the
spent target vault. It was placed in pail
 Target_Index_2023-10-06.pdf 
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection TM2 with new target Ta#66 was connected
in ITW. 
 TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf 
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check TM2 with new target Ta#66 had an
electrical check and leak check on SHC. 
 TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf 
  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check An electric checked right after TM2
was moved from ITW. 
 TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf 
  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection TM2 with target Nb#11 has been disconneted
in ITW. The HS line was purged with Nitrogen
in station. 
 TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf 
  2489   Thursday, September 14, 2023, 11:16 Adam NewsomeSpent Target VaultDevelopment Ta #58Investigation of Pail 211 (Ta #58)Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the
 Report_on_Inspection_of_Pail_211_on_2023-09-14.pdf 
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection TM4 was connected in ITE with new
target Ta#65 installed. see attachment in
detail.
 TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf 
  2487   Friday, September 01, 2023, 10:36 Adam NewsomeSpent Target VaultStandard Operation UCx#42Spent Target MoveUCx #42 moved from North Hot Cell to Storage
Vault in Pail #282. Placed in slot 6B. Tray
6 is now full. Pail measured at 34.9 mSv/h
 Target_Index_2023-09-01.xlsm 
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check TM4 with new target Ta#65 has been
E/L checked at NHCPost.
 TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf 
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check TM4 with new target Ta#65 has been
E/L checked at NHCPost.
 TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf 
  2484   Tuesday, August 29, 2023, 10:45 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check   TM4 with spent target UCx#42
has been electric checked at NHCpost right
after transferred from ITE.
 TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf 
  2483   Tuesday, August 29, 2023, 09:33 Frank SongITEStandard OperationTM4UCx#42module disconnection TM4 with spent target UCx#42 was
disconnected in ITE and has been remote moved
to NHC this morning.
 TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf 
  2482   Tuesday, August 29, 2023, 09:28 Frank SongITWRepairTM2Nb#11Module Connection Module was connected yesterday and
all turbo pumps are running at their top
speed. 
 TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf 