2475
|
Wednesday, August 09, 2023, 13:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#10 | Tm2 Nb#10 has been connect at TCS. | TM2 Nb#10 has been connect at TCS. TCS
water system and vacuum system have been
started. Everything looks ok so far. TCS |
|
|
2474
|
Wednesday, August 09, 2023, 09:41 |
David Wang | North Hot-Cell | Standard Operation | TM2 | Nb#10 | TM2 Nb# 10 electrical and leak check at NHC | Nb#10 has been installed on TM2 . electrical
and leak check on HS line are good. See attachment. |
|
|
2473
|
Tuesday, August 08, 2023, 13:01 |
David Wang | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TM2 TiC#6 post run electrical check at NHC. | TM2 TiC#6 post run electrical check has
been done at TCS. See attachment |
|
|
2472
|
Tuesday, August 08, 2023, 12:59 |
David Wang | ITW | Standard Operation | TM2 | SiC #6 | TM2 SiC#6 dhas been disconnected in ITW | TM2 SiC#6 has been disconnected in ITW.
See check list |
|
|
2471
|
Thursday, August 03, 2023, 12:24 |
Jason Zhang | Crane | Development | | | Cleanup of camera installation on target hall crane, installation of replacement laser | The cleanup of
the ISAC Target Hall crane and installation |
|
|
2470
|
Tuesday, August 01, 2023, 09:06 |
Adam Newsome | Crane | Development | | | Measuring Tape and Camera Removed from Target Hall Crane | In an effort to clean up the camera installation
on top of the ISAC target hall crane to resolve
a fault, the position measuring tape and |
|
|
2469
|
Friday, July 28, 2023, 10:21 |
Adam Newsome | Spent Target Vault | Maintenance | | | Mini Storage Vault: Bearing Lubrication | The bearings on the mini storage vault
were lubricated. It is suspected that this
has never been done. It is suggested that |
|
|
2468
|
Friday, July 28, 2023, 10:09 |
Adam Newsome | Spent Target Vault | Maintenance | | | Main Storage Vault: Bearing Lubrication | Bearings for the main storage vault door
were lubricated on 2023-07-28. It is unknown
when this was last done. It is suggested |
|
|
2467
|
Tuesday, July 25, 2023, 16:25 |
Carla Babcock | North Hot-Cell | Standard Operation | | SiC#45 | SiC#45 post irradiation inspection | Looked at SiC#45 in the hot cell. Looked
very clean, no deposits on the heat shield
or other components. Target also looked very |
|
|
2466
|
Wednesday, July 19, 2023, 08:09 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | An electrical check was made after
new target installed on TM4. |
|
|
2465
|
Wednesday, July 19, 2023, 08:04 |
Frank Song | ITE | Standard Operation | TM4 | UCx#42 | Module Connection | TM4 with new target UCx#42 was connected
in ITE. |
|
|
2464
|
Tuesday, July 18, 2023, 10:08 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | module disconnection & electrical check right after transferred from ITE to NHC | TM4 with spent target SiC#45 was
disconnected ITE and an electrical
check made right after moved on NHC. |
|
|
2463
|
Wednesday, July 12, 2023, 22:21 |
Carla Babcock | North Hot-Cell | Standard Operation | | TiC#5 | TiC#5 post irradiation inspection results | The TiC#5 post irradiation inspection was
done on Wed. June 14 and Mon. June 19. This
target didn't have any obvious issues but |
|
|
2462
|
Wednesday, June 21, 2023, 14:39 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle, |
|
|
2461
|
Wednesday, June 21, 2023, 09:51 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#5 | Spent Target Move | TiC#5 moved to the spent target vault
from the north hot cell. Placed in pail#279
in spot 3A, 40mSv/h when removed from NHC. |
|
|
2460
|
Tuesday, June 20, 2023, 12:37 |
Adam Newsome | Assembly/Bench Test | Development | | | Modifications to wire ropes for pails within existing F-308s | Based on a request from CNL (attached),
modifications were made to the wire ropes
protruding through the tops of F-308s to |
6x |
|
2459
|
Wednesday, June 14, 2023, 13:37 |
David Wang | ITE | Standard Operation | TM4 | | ITE water signal interlock check | ITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A |
|
|
2458
|
Wednesday, June 14, 2023, 07:10 |
Frank Song | ITE | Standard Operation | TM4 | SiC#45 | TM4 with SiC#45 connection in ITE | TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed. |
|
|
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check | TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC. |
|
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check | TM4 with spent target TiC#5 electric
check after moving from ITE to NHC. |
|