162
|
Tuesday, January 23, 2024, 14:03 |
Adam Newsome | Elevation Jack | Maintenance | Inspection of elevating system motor contacts | Motor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1. |
 |
|
163
|
Wednesday, January 31, 2024, 11:39 |
Adam Newsome | Elevation Jack | Maintenance | Jack station 11: synchro replaced | Because of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this |
|
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|
|
165
|
Wednesday, February 07, 2024, 12:04 |
Adam Newsome | Elevation Jack | Repair | Elevating system - brake master relay fuse issue | It was observed when attempting lid up
operation on 2024-02-06 that the brakes for
each of the jacks were not operating correctly. |
|
|
166
|
Thursday, February 08, 2024, 08:50 |
Adam Newsome | Elevation Jack | Maintenance | Elevating system - station 10 motor contactor issue | It was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor |
|
|
167
|
Friday, February 09, 2024, 15:43 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation - 2024 | The cyclotron lid was raised starting ~10:30am
on 2024-02-06 and finishing at ~3:30pm on
2024-02-08, under work permit C2024-02-06-4. |
 |
|
171
|
Wednesday, April 24, 2024, 14:26 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (second) - 2024 | Due to an issue with resonator latching,
there was a need to raise the cyclotron lid
a second time this shutdown. |
|
|
173
|
Thursday, May 02, 2024, 12:42 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation (third) - 2024 | The cyclotron lid was raised starting ~11:45am
on 2024-05-02 and finishing at ~12:12pm
under work permit C2024-05-02-5. |
|
|
174
|
Tuesday, May 07, 2024, 09:35 |
Adam Newsome | Elevation Jack | Standard Operation | Lid down operation (third) - 2024 | A third lid down
operation took place over May 6-7, 2024. |
 |
|
184
|
Monday, June 24, 2024, 12:53 |
Riley Sykes | Elevation Jack | Maintenance | Highfield Service | Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected |
|
|
188
|
Wednesday, July 24, 2024, 14:26 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated |
|
|
189
|
Wednesday, August 07, 2024, 14:24 |
Riley Sykes | Elevation Jack | Maintenance | Service inspection and relubrication | Jack 7L pulled
apart and inspected for deficiencies, alignment |
|
|
194
|
Monday, January 20, 2025, 13:55 |
Adam Newsome | Elevation Jack | Maintenance | Elevating System MRO - 2025 | Elevating System MRO was started Jan. 16
by R. Sykes, M. Dalla Valle, P. Hall-Patch
under work permit C2025-01-16-3. |
  |
|
195
|
Tuesday, January 28, 2025, 12:31 |
Adam Newsome | Elevation Jack | Standard Operation | Lid up operation - 2025 | The lid up operation
took place on Jan. 28, 2025 under work permit |
 |
|
196
|
Friday, January 31, 2025, 13:41 |
Riley Sykes | Elevation Jack | Maintenance | Spare Highfield units 13L/R | Both spare #13 Highfields inspected
and serviced. New oil added Jan 30 2025.
All in working order and ready for operation |
|
|
198
|
Tuesday, February 25, 2025, 12:00 |
Riley Sykes | Elevation Jack | Maintenance | Highfield 5 L/R | Both Highfields from unit 5 have
been removed, serviced and new lubrication
added. 5R Worm Wheel has intermittent pitting |
  |
|
200
|
Wednesday, March 26, 2025, 10:07 |
Riley Sykes | Elevation Jack | Maintenance | Screwjack 5 L/R | Both L and R of screwjack sets #5
have been inspected, serviced and lubricated.
All in working order, no deficiencies present |
|
|
14
|
Wednesday, February 27, 2013, 12:08 |
Travis Cave | Cyclotron | Standard Operation | Installation of 2C | 2C has been installed located on all QDLs
and all the numbers, continuity check done
and passed. Bridge has been removed from |
|
|
15
|
Tuesday, March 05, 2013, 14:11 |
Travis Cave | Cyclotron | Standard Operation | Setup and the Installation of the HE 1 probe. | Setup of the HE 1 probe is difficult has
we have no mockup of it to properly setup
cameras and equipment for it. This is problem |
|
|
16
|
Friday, March 08, 2013, 18:42 |
Grant Minor | Cyclotron | Repair | Tank lid not at upper limit and resulting effects | This morning during routine service bridge
work in the Cyclotron tank, it was observed
by Travis Cave that the cable tray for the |
    |