ID Date Author Category Type Subjectdown Text Attachments
  56   Tuesday, February 17, 2015, 07:10 Dan McDonaldTrolleys servicedMaintenancePre shut down trolley serviceRoutine maintenance as per Mike Gallop's
written procedure took place in December
with the only non routine service being the
  
  19   Friday, March 15, 2013, 08:39 Don JacksonCyclotronStandard OperationPre Lid Down In Tank Video SurveyIn tank survey completed.  A few items
of interest were found.  Ladders need
to moved manually outboard to #5 resonators
 Pre_Lid_Down_Survey_2013.pdf 
  25   Thursday, January 16, 2014, 08:46 maicodallavalleTrolleys servicedMaintenancePre Cyclotron work servicing and checkingThis is a list of all the trolleys and
other equipment witch were checked and serviced
prior to work in the Cyclotron.
  
  116   Monday, February 03, 2020, 11:06 Adam NewsomeCyclotronDevelopmentPorthole Cover Handling Tool - Initial Test ReportThe suction-cup based porthole cover handling
tool (TRH1366) was tested for the first time
inside the cyclotron as part of the regular
 IMG_20200128_114901.jpg 
  108   Friday, February 02, 2018, 14:14 Don JacksonTrolleyRepairOvercurrent on radial drive motor 
 
  
  182   Wednesday, June 12, 2024, 10:35 Riley SykesTrolleys servicedMaintenanceOutriggers 1 and 2 Service 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000
  
  178   Friday, May 31, 2024, 11:28 Riley SykesService BridgeMaintenanceOutrigger mechanical inspection Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit
  
  114   Thursday, October 31, 2019, 14:31 Adam NewsomeService BridgeRepairOutrigger 2 Vertical Drive RepairOutrigger 2 vertical drive repair is complete
- ball screws were replaced to resolve a
jamming issue (this work was done in the
  
  151   Tuesday, March 28, 2023, 12:02 Nadia JorgensonService BridgeRepairOutrigger 1 Failure and Repair 
During
the 2023 shutdown outrigger 1 failed. While
 Outrigger_1_Repair_2023.png 
  156   Thursday, September 07, 2023, 13:21 Jason ZhangService BridgeDevelopmentOutrigger #1 and #2 individual testing completeOutrigger #1 and #2 have had their controls
system overhauled as part of the O503 project.
The previous controls enclosure and the elements
  
  6   Thursday, October 25, 2012, 13:58 maicodallavalleService BridgeMaintenanceOrbit DriveIt was observed during the last time the
Cyclotron service bridge was used the orbit
drive chain had a lot of slack. The drive
  
  74   Tuesday, January 05, 2016, 09:58 Travis CaveCyclotronStandard OperationOpened the shield doorThe shield door on the B2 level has been
opened.
  
  36   Friday, February 21, 2014, 11:05 Bevan MossCyclotronStandard OperationOld Monitor Box Removed, New installed One of the beam spill monitor boxes
was removed and placed into a lead coffin.
The fields around the coffin prior to the
 7x 
  37   Friday, February 21, 2014, 15:58 Bevan MossCyclotronStandard OperationOld Monitor Box Removed, New installedDuring the electrical test the was no contact.
 To help investigate further the Montitor
box was removed from the Cyclotron. It was
  
  159   Wednesday, October 18, 2023, 12:35 Jason ZhangService BridgeDevelopmentO503 Bridge and Outrigger integration testing Service bridge, Outrigger #1, and
Outrigger #2 have had the controls system
migrated to PLC controls. The 5069-AENTR
  
  125   Monday, November 09, 2020, 09:17 Adam NewsomeInfrastructureDevelopmentNew crane pendant: B2 level craneA new remote crane pendant was installed
to replace the existing  wired pendant on
the B2 level of Remote Handling building
  
  124   Thursday, November 05, 2020, 15:38 Adam NewsomeInfrastructureDevelopmentNew crane pendant: B1 level craneA new remote crane pendant was installed
to replace the existing wired pendant on
the B1 level of Remote Handling building
  
  154   Friday, July 28, 2023, 12:05 Adam NewsomeCyclotronDevelopmentMaintenance ladders: end caps addedThe original end feet and end caps were
removed from the maintenance ladders and
replaced by new end caps (TRH1637).
 PXL_20230728_184520962.jpg 
  101   Tuesday, March 14, 2017, 17:28 Jason KapalkaCyclotronMaintenanceLower resonator removal simulation exerciceA simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the 
  
  130   Friday, February 26, 2021, 13:00 Adam NewsomeTrolleys servicedMaintenanceLower Resonator Trolley - Radial Drive Failure IssueOn Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley
  