185
|
Wednesday, July 17, 2024, 15:02 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround for July 2024 was completed
for the B1 and B2 levels by A. Newsome, and
for the main shop and back shop by R. Sykes. |
|
190
|
Thursday, October 10, 2024, 12:30 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Shop, Back Shop, B1, and B2 levels | A safety walkaround was completed for the
RH Shop, Back Shop, B1, and B2 levels.
The resulting spreadsheet can be |
|
192
|
Friday, January 03, 2025, 10:20 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building B1 and B2 Level | A safety walkaround was completed for the
RH building B1 and B2 levels.
The resulting spreadsheet can be |
|
193
|
Monday, January 06, 2025, 13:57 |
Adam Newsome | Infrastructure | Standard Operation | Safety Walkaround Complete - RH Building Shop and Back Shop | A safety walkaround was completed for the
RH building shop and back shop.
The resulting spreadsheet can be |
|
1
|
Monday, June 27, 2011, 10:38 |
John Wong | General | Routine | Testing RH elog | |
|
5
|
Tuesday, September 25, 2012, 08:57 |
maicodallavalle | Elevation Jack | Maintenance | 2012 Service Maintance of #4 Station Jacking System | Shut down work for 2012.Replaced serviced
Jacking Station #6. Tapered alignment pins
were damaged. They were skimmed and checked |
|
7
|
Tuesday, January 29, 2013, 18:49 |
Grant Minor | Elevation Jack | Standard Operation | Lid-up complete - summary notes | Lid-up was first attempted yesterday (Jan
28th) by Dan Louie, Arthur Leung, and Maico
Dalla Valle. They experienced problems |
|
8
|
Wednesday, January 30, 2013, 14:44 |
Grant Minor | Elevation Jack | Standard Operation | Further lid-up notes from Dan Louie | Dan Louie's e-mail comments from 30 Jan
2013 are attached.
- Grant |
|
10
|
Wednesday, February 06, 2013, 17:42 |
Grant Minor | Elevation Jack | Maintenance | In-situ jack power screw lubrication inspection - Stations 9, 10, 11, and 6 | Due to concerns raised regarding the state
of the lubrication of the power screws at
Station 9, the lubrication was visually inspected |
16x |
11
|
Wednesday, February 06, 2013, 17:50 |
Grant Minor | Elevation Jack | Maintenance | Service records compiled by G. Minor | Attached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor |
|
12
|
Wednesday, February 06, 2013, 18:07 |
Grant Minor | Elevation Jack | Maintenance | Lid-down yoke gap measurements from 1994 | Attached is a scan of a handwritten record
from 1994 showing yoke-to-upper-structure
gap measurements from 1994, both L and R |
|
22
|
Tuesday, March 19, 2013, 19:17 |
Grant Minor | Elevation Jack | Standard Operation | Re-indexing of all jack station "zero" yoke elevations | The dimension between the yokes and the
Cyclotron upper structure primary beams was
set to .25" nominal at all jack stations |
|
23
|
Thursday, April 11, 2013, 19:00 |
Grant Minor | Elevation Jack | Maintenance | Upper Bearing at Jack Station 9 + Fall Protection Upgrades | There was a brief access period to the
Cyclotron vault during April 9 to 12, 2013
due to other Cyclotron issues. |
|
27
|
Monday, January 20, 2014, 12:00 |
Grant Minor | Elevation Jack | Standard Operation | Indexing Check of Cyclotron Jack Stations | Maico Dalla Valle and Grant Minor, supported
by Dan Louie and Arthur Leung, entered the
Cyclotron Vault on January 15th, 2014 to |
|
28
|
Thursday, January 23, 2014, 18:47 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report - 22 Jan 2014 | Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron |
6x |
41
|
Monday, March 03, 2014, 15:07 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Down Report Monday 3-March-2014 | The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on |
|
44
|
Wednesday, July 02, 2014, 16:46 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report for 27 June 2014 | The cyclotron lid was raised on June 27th,
2014. Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected |
|
45
|
Friday, July 04, 2014, 07:21 |
Dan McDonald | Elevation Jack | Standard Operation | Cyclotron lid down July-2- 2014 | Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to |
|
46
|
Tuesday, January 13, 2015, 16:46 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 5 | 5 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3, |
9x |
47
|
Friday, January 23, 2015, 10:27 |
maicodallavalle | Elevation Jack | Maintenance | 2015 Jack Maintenance - Stations #4 and Station #9 | The Cyclotron Elevating System Shut Down
work done this year was done on Station #4
and Station #9. |
|