Entry  Tuesday, November 14, 2023, 12:13, Nadia Jorgenson, Service Bridge, Repair, First Festooning Car "H" channel replacement  Festooning_car_H_channel_deformation.pngFestooning_car_H_channel_bottom_face.png
 Damaged "H" channel removed from the first festooning car, and spare channel was put in place.
Note: it seems like the aluminum channel is not strong enough for the forces its being put under, and is resulting in deformations (See picture
"Festooning car H channel deformation"). We suspect this has happened in the past, notches were cut out where the deformation likely occurred
Entry  Wednesday, October 18, 2023, 12:35, Jason Zhang, Service Bridge, Development, O503 Bridge and Outrigger integration testing 
 Service bridge, Outrigger #1, and Outrigger #2 have had the controls system migrated to PLC controls. The 5069-AENTR control unit is located at
the centrepost and will be mounted there after wiring is cleaned up. Preliminary testing consisted of operators simulating a shutdown task was performed
today and was a success. Minor adjustments to the encoder logic will be made before the commissioning test. The follow tests were done: 
Entry  Friday, September 15, 2023, 10:15, Adam Newsome, Trolley, Maintenance, Lift Trolley: mirror actuation mechanism repair/upgrade PXL_20230915_164811247.jpg
The mirror actuation mechanism was observed to be "sticky" during 2023 winter shutdown - it occasionally did not function properly and needed
some manual assistance. 
The following items were addressed to resolve the issue: 
Entry  Thursday, September 14, 2023, 13:51, Adam Newsome, Trolley, Maintenance, Lift Trolley: upgrades to camera tilt mechanism PXL_20230914_193143524.jpg
The two camera tilt mechanisms on the lift trolley have been upgraded. Upgrades include:
For the individual camera:

    Replaced cylinder
    Replaced fittings for cylinder
    Replaced air tubing from flow control to cylinder
Entry  Thursday, September 07, 2023, 13:21, Jason Zhang, Service Bridge, Development, Outrigger #1 and #2 individual testing complete 
Outrigger #1 and #2 have had their controls system overhauled as part of the O503 project. The previous controls enclosure and the elements have been
replaced with a new aluminum enclosure which contains DIN rail relays, a 5V power supply, and a +-12V Power supply. The new centrepost slave PLC unit handles
the control logic of OR1, OR2, the Bridge and is connected to the main PLC in the control room through Ethernet. Both outriggers were tested individually.
Entry  Thursday, August 03, 2023, 10:43, Adam Newsome, Trolley, Development, Previous generation video trolley decommissioned 
The "old" video trolley featuring scissor mechanism and DSLR camera has officially been decommissioned. Going forward, Video Trolley Mk 2 (TRH1089D)
will be used. 
Entry  Friday, July 28, 2023, 12:05, Adam Newsome, Cyclotron, Development, Maintenance ladders: end caps added PXL_20230728_184520962.jpg
The original end feet and end caps were removed from the maintenance ladders and replaced by new end caps (TRH1637).
Entry  Wednesday, April 26, 2023, 11:19, Adam Newsome, Cyclotron, Standard Operation, Vault Shield Door Closed 
The vault shield door has been closed and seal inflated. The operation was performed with no issue.
Entry  Friday, March 31, 2023, 13:22, Adam Newsome, Cyclotron, Standard Operation, Lid down operation - 2023 Elevation_System_Checklist_-_March_31_2023.pdf
The lid down operation took place on Mar. 31, 2023. 

The  system was energized a few minutes ahead of time.
Entry  Tuesday, March 28, 2023, 12:02, Nadia Jorgenson, Service Bridge, Repair, Outrigger 1 Failure and Repair Outrigger_1_Repair_2023.png
 
During the 2023 shutdown outrigger 1 failed. While performing the HE Probe removal we found
that the outrigger could only travel vertically about one inch in each direction.
Entry  Friday, February 03, 2023, 08:27, Eric Lahe, Elevation Jack, Maintenance, Elevating System Jack Inspection  Elevation_System_Checklist_-_Jan312023.xlsx
 Annual Jack Inspection: The annual elevation system inspection has been completed (Jan 31,2023).
 
At station 1, Highfield gear Jack 13R needs a coupler seal replacement. It is ok for this shutdown, but should be replaced before next shutdown.
Entry  Thursday, February 02, 2023, 07:05, maicodallavalle, Service Bridge, Repair, Hinged Festoon Rail at Cyclotron  
The Hinged section of the festoon rail at Cyclotron has a piston to keep rail in the up position for shutdown work (Bridge and Trolley in tank work).
A plastic liner for the piston has fallen apart and needs to be replace.
A spare one has been temporarily put into  place until another one has been machined and reinstalled. 
Entry  Monday, January 30, 2023, 12:20, Adam Newsome, Cyclotron, Standard Operation, Lid up operation - 2023  2023_Synchro_Counts.xlsx2023_Jacks_Infrared_Data.xlsx
The lid up operation took place on Jan. 30, 2023. 

 
Entry  Friday, January 27, 2023, 12:12, Adam Newsome, Infrastructure, Development, Vault crane - inspection, remote pendant installation 
The vault crane annual inspection was completed by Tom Kauss. 
 
The wired pendant was replaced with a remote pendant by Tom Kauss. 
Entry  Thursday, October 06, 2022, 17:15, Adam Newsome, Elevation Jack, Maintenance, Preventative Maintenance: MCC-E elevating system motor contactors Elevating_System_Motor_Contactors_2022-10-06.png
Under work permit C2022-10-04-1, the motor contactors for jack motors
1 through 12 were replaced. The contactors showed signs of corrosion.
Entry  Wednesday, June 29, 2022, 12:12, Adam Newsome, Probe, Development, LE1/LE2 Probe Frame - Updates PXL_20220629_175832571.jpg
The LE1/LE2 Probe Frame was mounted on the Upper Resonator Trolley in the mockup with the intention of confirming functionality and making some updates
to the probe installation/removal procedure document.
 
Entry  Tuesday, May 10, 2022, 11:31, Nadia Jorgenson, Cyclotron, Standard Operation, Vault Shield Door Closed 
 The vault shield door has been closed and seal inflated. The operation was performed with
no issue.
Entry  Tuesday, May 10, 2022, 11:30, Nadia Jorgenson, Cyclotron, Repair, Cracked Festooning Rail Bushing Removed Festooning_Bushing_Cracked.jpg
 We removed the left bushing that is around the air cylinder on the festooning rail, right outside the cyclotron. It was cracked. Will need to replace
next year when the vault door opens again.
Entry  Tuesday, May 10, 2022, 11:26, Nadia Jorgenson, Cyclotron, Repair, Festooning rail rope and pulley system re-routed 
The rope and pulley system that is used to raise the festooning rail across the vault shield door has been re-routed. It now makes use of all three pulleys
and is easier to raise and lower without interference. 
Entry  Wednesday, May 04, 2022, 12:07, Adam Newsome, Trolley, Development, Tool Trolley: Brass air fittings replacement complete 
All of the old brass air fittings on the Tool Trolley have now been swapped over to push-connect style fittings. As these are plastic fittings, it is
recommended to inspect them after ~5 years for degradation. 