113
|
Wednesday, September 04, 2019, 15:29 |
Adam Newsome | Trolley | Maintenance | Connector faceplate and tubing upgrade | Tool Trolley:
The connector faceplate was replaced
with a new version to allow for more space |
|
|
112
|
Tuesday, January 22, 2019, 07:18 |
Dan McDonald | Elevation Jack | Maintenance | Station 11-12 jack swap and hoist plate instal | Prior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions |
|
|
111
|
Tuesday, April 03, 2018, 11:57 |
Travis Cave | Cyclotron | Standard Operation | Blue Shield Door Shut. | The Blue Shield Door on the B2 level
of the RH building has been closed. |
|
|
110
|
Friday, February 23, 2018, 15:44 |
Jason Kapalka | Elevation Jack | Repair | Replacement of Elevating System wiring | On January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
|
|
|
109
|
Monday, February 19, 2018, 12:58 |
maicodallavalle | Trolley | Repair | Lift Trolley Repair | We had just finished pulling out the ladders
from the cyclotron with the lift trolley.
We started to run the lift trolley into the |
|
|
108
|
Friday, February 02, 2018, 14:14 |
Don Jackson | Trolley | Repair | Overcurrent on radial drive motor |
|
|
|
107
|
Wednesday, January 31, 2018, 11:20 |
Isaac Earle | Cyclotron | Standard Operation | HE1 probe reinstalled | HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165. Hardware for the |
|
|
106
|
Thursday, January 25, 2018, 17:16 |
Isaac Earle | Cyclotron | Standard Operation | HE1 probe removed | The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165. The reason for removal is so |
|
|
105
|
Tuesday, January 16, 2018, 13:43 |
Travis Cave | Cyclotron | Standard Operation | Cyclotron in tank work | All cyclotron in tank work has been
completed. |
|
|
104
|
Tuesday, January 09, 2018, 15:54 |
Jason Kapalka | Cyclotron | Standard Operation | Lid-up sequence (in-tank work) | 2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered |
|
|
103
|
Monday, January 08, 2018, 09:04 |
Maico Dalla Valle / Jason Kapalka | Cyclotron | Standard Operation | Cyclotron Lid Up | Remote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
|
|
|
102
|
Tuesday, March 14, 2017, 17:57 |
Jason Kapalka | Cyclotron | Standard Operation | Lid raising and lowering operations | Lid up (Attempt #1)
Pre-indexed
|
|
|
101
|
Tuesday, March 14, 2017, 17:28 |
Jason Kapalka | Cyclotron | Maintenance | Lower resonator removal simulation exercice | A simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the
|
|
|
100
|
Tuesday, March 14, 2017, 17:07 |
Jason Kapalka | Probe | Maintenance | LE probe removal simulation exercise | A simulated removal of the LE2 Probe from
the Cyclotron tank was performed by the RH
and Probes group using the
|
|
|
99
|
Tuesday, March 14, 2017, 12:02 |
Jason Kapalka | Cyclotron | Standard Operation | Radiation survey | The unshielded radiation survey was performed
in the Cyclotron tank by the RH group using
the service bridge,
|
|
|
98
|
Tuesday, March 14, 2017, 11:23 |
Jason Kapalka | Cyclotron | Standard Operation | Start/end of shutdown photo and video survey | The start of shutdown photo and video survey
was performed in the Cyclotron tank by the
RH group using the
|
|
|
97
|
Tuesday, March 07, 2017, 09:31 |
Jason Kapalka | Shielding | Standard Operation | Blockers/Shields/Covers/Ladders | The seven copper blockers were removed from
the Cyclotron tank by the RH group using
the service bridge, lift
|
|
|
96
|
Friday, March 03, 2017, 13:30 |
Jason Kapalka | Cyclotron | Standard Operation | CP continuity test | Performed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge,
|
|
|
95
|
Tuesday, February 28, 2017, 15:45 |
Jason Kapalka | Cyclotron | Standard Operation | 2C extraction probe removal and reinstallation | 2C extraction probe was removed from cyclotron
tank on 2017-02-07 by RH and Probes group
members with service
|
|
|
94
|
Tuesday, February 21, 2017, 13:40 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Returned to Cyclotron | The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165. An orbital |
|