  5   Wednesday, December 03, 2014, 10:16 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Lead Block and Beam Dump InsertOn November 28th the lower lead shield
was installed with 3/8" shimming at
the front end, and 11/32" shimming at
  
  4   Wednesday, November 26, 2014, 17:50 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Center Block (TSH0461)Painting and relabeling of the modified
lower center block (TSH0461) was completed
on Monday Nov 24.  
 Beam_Dump_Lower_Center_Block_Alignment_-_Nov_25_2014_(from_Darren_Blom).txtIMG_1110.JPGIMG_1125.JPGIMG_4297.JPGIMG_4303.JPG 
  3   Friday, November 21, 2014, 13:37 Isaac Earle100KW Beam DumpDevelopmentDestructive Testing of 1" MDC Ceramic BreaksTesting was performed on the ceramic water
breaks to be used on the beam dump water
hose assemblies.  The ceramic breaks
 Ceramic_Water_Break_Test_#1.docxCeramic_Water_Break_Test_#2.docxTest_#1_Broken_Sample.JPGTest_#2_Broken_Sample.JPG 
  2   Wednesday, November 19, 2014, 13:49 Isaac Earle100KW Beam DumpDevelopmentDecision on Modifications to Lower Center Block (TSH0225)I received a call today from Jim Adamson
at Kaltech regarding modifications to shielding
block TSH0225.
  
  1   Tuesday, November 04, 2014, 16:58 John Wong100KW Beam DumpMaintenanceTesting ElogTuesday, November 04, 2014, 16:58