Wednesday, December 03, 2014, 10:16 |
Isaac Earle | 100KW Beam Dump | Development | Installation of Lower Lead Block and Beam Dump Insert | On November 28th the lower lead shield
was installed with 3/8" shimming at
the front end, and 11/32" shimming at |
|
4
|
Wednesday, November 26, 2014, 17:50 |
Isaac Earle | 100KW Beam Dump | Development | Installation of Lower Center Block (TSH0461) | Painting and relabeling of the modified
lower center block (TSH0461) was completed
on Monday Nov 24. |
    |
3
|
Friday, November 21, 2014, 13:37 |
Isaac Earle | 100KW Beam Dump | Development | Destructive Testing of 1" MDC Ceramic Breaks | Testing was performed on the ceramic water
breaks to be used on the beam dump water
hose assemblies. The ceramic breaks |
   |
2
|
Wednesday, November 19, 2014, 13:49 |
Isaac Earle | 100KW Beam Dump | Development | Decision on Modifications to Lower Center Block (TSH0225) | I received a call today from Jim Adamson
at Kaltech regarding modifications to shielding
block TSH0225. |
|
1
|
Tuesday, November 04, 2014, 16:58 |
John Wong | 100KW Beam Dump | Maintenance | Testing Elog | Tuesday, November 04, 2014, 16:58
This is a test.
|
|