43
|
Thursday, February 13, 2020, 08:51 |
Adam Newsome | T-Hall Crane | Standard Operation | Remote mode door limit switch bypass | The non-existent safety limit switch for
the target hall door which prevents remote
motion has been bypassed in the crane PLC |
|
42
|
Tuesday, November 19, 2019, 10:31 |
Adam Newsome | T-Hall Crane | Repair | 900VFD Encoder Board Replacement | An issue arose in which the ARIEL crane hoist
could not be moved. It was determined that
the East and West drums were out of synchronization |
![IMG_20191106_140016.jpg IMG_20191106_140016.jpg](attachment.png) ![IMG_20191106_153311.jpg IMG_20191106_153311.jpg](attachment.png) ![IMG_20191112_114042.jpg IMG_20191112_114042.jpg](attachment.png) ![Hoist_Sync_3.jpg Hoist_Sync_3.jpg](attachment.png) |
41
|
Tuesday, August 13, 2019, 11:43 |
Jason Kapalka | T-Hall Crane | Development | Installed surge protector | Background: On 2019-06-25 a Pri VelFdbk Loss
fault was discovered on the Main Hoist East
Drum South Motor of the ARIEL Target Hall |
|
40
|
Wednesday, March 13, 2019, 16:14 |
Isaac Earle | 100KW Beam Dump | Development | Testing EHD water leak detectors | The following work was completed today
on the EHD water leak sensors:
Mike Vogel installed a |
9x |
39
|
Friday, December 22, 2017, 12:42 |
Jason Kapalka | T-Hall Crane | Standard Operation | Powered down ARIEL Target Hall Crane | Powered down ARIEL Target Hall Crane
today by switching off main power switch
on B1 level in preparation for site-wide |
|
38
|
Monday, July 17, 2017, 15:32 |
Jason Kapalka | T-Hall Crane | Repair | Target Hall Crane modifications and repairs | |
|
37
|
Wednesday, June 28, 2017, 17:37 |
Isaac Earle | BL4N | Development | BL4N 35-deg bender "No. 1" installed on magnet stand | BL4N 35-deg bender magnet "No.
1" has been installed onto the magnet
stand with "stand leg" configuration |
![IMG_0259.JPG IMG_0259.JPG](attachment.png) ![IMG_0260.JPG IMG_0260.JPG](attachment.png) |
36
|
Monday, June 05, 2017, 16:16 |
Isaac Earle | BL4N | Development | BL4N 35-deg bender stand assembly complete | Assembly
of two complete bender stands was completed |
14x |
35
|
Thursday, June 01, 2017, 15:25 |
Isaac Earle | BL4N | Development | BL4N 35-deg bender adjustment blocks modified to fit magnet | Adjustment blocks were installed on the
second dipole bender today (labeled "No.
03" "C15-III-57/15"). The |
![Stress_analysis_on_TBP1808_and_1809_for_modification_to_fit_magnet_-_June_1_2017.pdf Stress_analysis_on_TBP1808_and_1809_for_modification_to_fit_magnet_-_June_1_2017.pdf](attachment.png) ![TBP1809.JPG TBP1809.JPG](attachment.png) |
34
|
Tuesday, May 16, 2017, 17:30 |
Jason Kapalka | T-Hall Crane | Development | ARIEL Target Hall Overhead Crane Measurements | On May 5, 2017 the Beamlines and Remote Handling
groups recorded distances in the ARIEL Target
Hall from the Target Pit floor and B1 Target |
![ARIEL_Target_Hall_Overhead_Crane_Measurements_(20170505).pdf ARIEL_Target_Hall_Overhead_Crane_Measurements_(20170505).pdf](attachment.png) |
33
|
Tuesday, May 02, 2017, 16:52 |
Isaac Earle | BL4N | Development | BL4N 35-deg bender stand hardened parts tested | Hardness testing was performed on
1 sample each of parts TBP1822 and TBP1823
(part of the 35-deg magnet stand assembly |
|
32
|
Tuesday, April 18, 2017, 19:28 |
Jason Kapalka | T-Hall Crane | Development | ATH overhead crane fault investigation | On April 18, 2017, an investigation was initiated
to determine the cause of the ARIEL Target
Hall overhead crane faults that occurred |
8x |
31
|
Wednesday, April 12, 2017, 10:52 |
Jason Kapalka | T-Hall Crane | Repair | ARIEL Target Hall crane oil leaks & inspection plan | On March 29, 2017, a 9 tonne load was transferred
in the ARIEL Target Hall with the overhead
crane (TRIUMF crane #44). On April 3, 2017, |
![IMG_3111.JPG IMG_3111.JPG](attachment.png) ![IMG_3112.JPG IMG_3112.JPG](attachment.png) ![IMG_3113.JPG IMG_3113.JPG](attachment.png) ![IMG_3114.JPG IMG_3114.JPG](attachment.png) |
30
|
Friday, March 31, 2017, 19:39 |
Jason Kapalka | T-Hall Crane | Development | ARIEL Target Hall overhead crane faults (Test Mode) | On March 29, 2017, a 9 tonne steel shield
block was transferred from the ARIEL Target
Pit and placed into a
|
![history_201703311454.csv history_201703311454.csv](attachment.png) ![DataLogging_201703311520_Table.csv DataLogging_201703311520_Table.csv](attachment.png) ![photo_1.JPG photo_1.JPG](attachment.png) |
29
|
Wednesday, February 15, 2017, 11:57 |
chad fisher | T-Hall Crane | Development | Jason's Remote Crane Test Boxes | On Tuesday, February 14th I finished modifying
Jason's boxes for the remote crane tests
by adding shelves to mount cameras... Apart |
|
28
|
Thursday, April 07, 2016, 11:25 |
Isaac Earle | 100KW Beam Dump | Development | Result of VCR Gasket Corrosion Test | In August 2014 gasket corrosion tests
were prepared by placing a 1" Swagelok
VCR gasket in a 500mL beaker with de-ionized |
![IMG_7003.JPG IMG_7003.JPG](attachment.png) ![IMG_7004.JPG IMG_7004.JPG](attachment.png) ![IMG_7005.JPG IMG_7005.JPG](attachment.png) ![IMG_7006.JPG IMG_7006.JPG](attachment.png) |
27
|
Monday, January 25, 2016, 13:20 |
Allon Messenberg | T-Hall Crane | Maintenance | Possible oil leak | Two small (approx. 5 cm across) puddles
of green fluid were discovered on the floor,
directly below the crane trolley. The |
![20160122_161849.jpg 20160122_161849.jpg](attachment.png) ![20160122_161830.jpg 20160122_161830.jpg](attachment.png) |
26
|
Tuesday, November 03, 2015, 13:15 |
Isaac Earle | 100KW Beam Dump | Development | Initial tests of beam dump water system controls | During the maintenance period today the
E-Hall tunnel was accessed to begin controls
tests on the beam dump water system and initial |
|
25
|
Wednesday, June 24, 2015, 15:19 |
Isaac Earle | 100KW Beam Dump | Development | Remainder of BD Shielding Installed | The location of the already installed blocks
including the TSH0392 protruding lift bails
were remeasured, and it was found that modification |
|
24
|
Monday, June 15, 2015, 17:08 |
Isaac Earle | 100KW Beam Dump | Development | E-Dump Shielding Installation | - The hoist rings were removed from the
upper lead shield
- Two standard lock-blocks were installed |
|