Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 11     Entry time: Monday, December 22, 2014, 14:21
Author: Isaac Earle 
Category: 100KW Beam Dump 
Type: Development 
Subject: Water System Leak Checked 

This morning Bill Richert pressurized the beam dump water cooling system with 30psi air and held for 2 hours.  He reported no change in pressure which indicates the flexible hose connections installed last week are leak tight.

ELOG V2.9.2-2455