Message ID: 6     Entry time: Wednesday, December 03, 2014, 10:36
Author: Isaac Earle 
Category: 100KW Beam Dump 
Type: Development 
Subject: Upper half of BD water blocks installed; Bypass loops installed 

On December 2 the upper half of the RH water blocks were installed (4 total) using a 0.030" thick 6061-T6 Al shim torqued to 60ft*lbs as was tested in Document-114260.

Bypass loops for testing the cooling system piping were installed as shown in the attached photo.

 

IMG_4381.JPG