Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 9     Entry time: Tuesday, December 16, 2014, 16:36
Author: Isaac Earle 
Category: 100KW Beam Dump 
Type: Development 
Subject: Upper Pb Shield and Water Hoses Installed 

 The upper lead shield was installed this morning.  Also the water hoses for lower lead shield, beam dump, and upper lead shield were all installed.  See attached photos and hose installation information PDF.

Attachment 1: BD_Hose_Install_Notes.pdf  974 kB  | Show | Hide all
Attachment 2: IMG_4407.JPG  2.181 MB  | Show | Hide all
Attachment 3: IMG_4408.JPG  2.304 MB  | Show | Hide all
Attachment 4: IMG_4410.JPG  2.314 MB  | Show | Hide all
ELOG V2.9.2-2455