ID Date Authordown Status Test Subject Text Attachments
  47   Tuesday, June 20, 2023, 15:11 Darwin Ortiz RosalesFixed Inspection ISAC 1 B1 L06 GloveboxOn Monday June 19th, the Glove box was
inspected.  Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels
  
  49   Tuesday, August 01, 2023, 12:31 Darwin Ortiz Rosales  Evap1 and Evap2 Inspection and MaintenanceEvap1:  Cleaned and checked seals. 
Oil level could not be clearly determined,
but are consulting with pump group to check.
  
  52   Friday, January 19, 2024, 10:18 Darwin Ortiz RosalesFixed Inspection of Glovebox inside B1 L06 (hotlab)Friday, January 19, 2024, 10:10 
This is a belated entry.  The
inspection was performed on December 19,
  
  53   Friday, January 19, 2024, 10:20 Darwin Ortiz RosalesFixed Glovebox regeneration (B1 L06, Hotlab)Friday, January 19, 2024, 10:19 
This is a belated entry.  The
regeneration was performed successfully on
  
  55   Tuesday, March 12, 2024, 15:21 Darwin Ortiz RosalesFixed Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab)Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1 


Normal
0
  
  58   Thursday, June 20, 2024, 13:33 Darwin Ortiz RosalesFixed Glovebox inspection ISAC1 B1 L06 Thursday, June 20, 2024, 13:28
All lines, pump, blower, were
  
  60   Thursday, August 01, 2024, 15:01 Darwin Ortiz Rosales  EVAP1 and EVAP2 Inspection and MaintenanceThursday, August 01, 2024, 14:56
EVAP1:  Checked seal and no
visible deterioration was observed. 
  
  61   Thursday, August 01, 2024, 15:03 Darwin Ortiz Rosales   Ultrasonicator in Cold Lab:  The ultrasonicator
cooling lines and their operation was checked. 
The functionality of the probe and operation
  
  62   Tuesday, October 15, 2024, 09:21 Darwin Ortiz RosalesFixed Hotlab glovebox catalyst regenerationTuesday, October 15, 2024, 09:22 
The glovebox catalyst was regenerated. 
No issues.  Removed TCE and PVB from
  
  40   Thursday, January 20, 2022, 13:38 Carla Babcock  Testing of spare FUG bias supplyTomislav and John Chow tested the spare
bias supply located in the rack of the electrical
services room. This is a FUG HCN 1400 M-60000,
  
  10   Thursday, September 08, 2011, 15:41 Anders MjosFixed1Evaporator#1 glovebox repairing

    

       
            
  
  11   Thursday, February 23, 2012, 13:38 Anders MjosFixed Water leak in chemistry / cold lab Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21.
 Notes_on_water_leak_ISAC_I.docx 
  13   Friday, March 15, 2013, 13:55 Anders Mjos  Non active water off for a short time (10 - 15 min)ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK
  
  30   Wednesday, April 08, 2020, 11:40 Anders Mjos  Lab check inChecked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and
  
  31   Friday, April 24, 2020, 16:27 Anders Mjos  Lab check in


   
        
            
 20200422_154045506_iOS.jpg 
  15   Thursday, March 16, 2017, 09:32 Aaron SchmidtFixed D.H.W water pipe replacementFri 03/03/2017 17:00  - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.

Wed 15/03/17 11:00
 DHW_pipe_replacement.docx 
  16   Wednesday, April 05, 2017, 08:22 Aaron SchmidtFixed D.H.W.R LeakWhen: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the
  
  23   Thursday, February 07, 2019, 10:42 Aaron Schmidt  Argon Glove box leak / regeneration failure 
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019.
 7x 
  24   Thursday, March 21, 2019, 07:43 Aaron Schmidt  Argon Glove box repair & link to nuclear ventilationThe Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: 
 6x 
  25   Wednesday, April 24, 2019, 10:19 Aaron SchmidtFixed Cold Lab back sink leak 
 Wednesday, April 24, 2019,
10:00:
  