Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 6 of 34  Not logged in ELOG logo
ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  621   Sunday, April 16, 2023, 14:08 Darwin Ortiz RosalesTaC45220-14LP-SISDoneTaC coating sinteringSunday, April 16, 2023, 14:08
The coated container was wrapped
in four Ta foil heatshields.
  
  622   Tuesday, April 18, 2023, 06:48 Darwin Ortiz RosalesTaC45220-11LP-SISDoneTaC coating sinteringTuesday, April 18, 2023, 06:46
The coated container was wrapped
in four Ta foil heatshields.
  
  623   Thursday, April 20, 2023, 07:00 Darwin Ortiz RosalesTaC41790-7LP-FEBIADDoneTaC coating sinteringThursday, April 20, 2023, 06:59
The coated container was wrapped
in 3 Ta foil heatshields.
  
  624   Monday, April 24, 2023, 09:12 Darwin Ortiz RosalesTaC44692-5LP-FEBIADDoneTaC coating sinteringSunday, April 23, 2023, 07:23
The coated container was wrapped
in 3 Ta foil heatshields.
  
  632   Friday, April 28, 2023, 11:31 Darwin Ortiz RosalesTaCBoatTARGET BOATDoneTaC coated endcaps and spring sinteringFriday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs.
  
  637   Thursday, June 08, 2023, 09:29 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering (new TaC)Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure.
  
  639   Tuesday, August 15, 2023, 12:03 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sinteringTuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields.
  
  640   Tuesday, August 22, 2023, 09:35 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sintering (second coating on same tube)Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields.
  
  642   Saturday, August 26, 2023, 09:41 Darwin Ortiz RosalesTaC45220-10LP-SISDoneTaC coating sintering
Saturday, August 26, 2023, 09:39
The coated container was wrapped
in 4 Ta foil heatshields.
  
  643   Tuesday, August 29, 2023, 12:47 Darwin Ortiz RosalesTaC45220-10LP-SISDoneTaC coating sinteringTuesday, August 29, 2023, 12:46
The coated container was wrapped
in 4 Ta foil heatshields.
  
  644   Thursday, August 31, 2023, 07:09 Darwin Ortiz RosalesTaC45447-4HP-FEBIADDoneTaC coating sinteringThursday, August 31, 2023, 07:07
The coated container was wrapped
in 3 Ta foil heatshields.
  
  645   Tuesday, September 12, 2023, 09:54 Darwin Ortiz RosalesTaC41369-2HP-SISDoneTaC coating sinteringTuesday, September 12, 2023, 09:51
The coated container was wrapped
in 3 Ta foil heatshield and left in evap2
  
  648   Friday, October 20, 2023, 07:24 Darwin Ortiz RosalesTaC45447-11LP-SISDoneTaC coating sinteringFriday, October 20, 2023, 07:20
The coated container was wrapped
in 4 Ta foil heatshields.
  
  652   Friday, January 26, 2024, 07:06 Darwin Ortiz RosalesTaC45447-1HP-FEBIADDoneTaC coating sinteringFriday, January 26, 2024, 07:05
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2
  
  653   Monday, January 29, 2024, 16:45 Darwin Ortiz RosalesTaC LP-FEBIADDoneTaC coating sinteringMonday, January 29, 2024, 16:36
LP FEBIAD
wrapped in 4 Ta heatshields.
  
  659   Friday, April 26, 2024, 06:19 Darwin Ortiz RosalesTaC45447-29HP-SISDoneTaC coating sintering


 Monday, April 29, 2024, 19:50
Started coating with coating stand.
  
  660   Wednesday, May 01, 2024, 11:54 Darwin Ortiz RosalesTaC25447-27HP-SISDoneTaC coating sinteringWednesday, May 01, 2024, 11:53
The coated container was wrapped
in 4 Ta foil heatshields.
  
  661   Tuesday, May 07, 2024, 06:20 Darwin Ortiz RosalesTaC TARGET BOATDoneSintering TaC coating on endcapsTuesday, May 07, 2024, 06:16
TP was swapped on previous day (May
6th)
  
  675   Saturday, September 07, 2024, 09:55 Darwin Ortiz RosalesTaC45447-13LP-SISDoneTaC coating sinteringSaturday, September 07, 2024, 09:54
The coated container was wrapped
in 4 Ta foil heatshields.
  
  676   Monday, September 09, 2024, 19:08 Darwin Ortiz RosalesTaC LP-SISDoneTaC coating sintering LP-SIS with gas lineMonday, September 09, 2024, 19:06
The coated container was wrapped
in 4 Ta foil heatshields.
  
ELOG V2.9.2-2455