  Evaporator_2, Page 5 of 25  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Wednesday, August 10, 2022, 09:31, Ivan Bao, Empty, , TARGET BOAT, In progress, TC tests 
1st test polarity 1
10:12 am Begin pumping down to rough vacuum
12:50 pm begin ramping up towards 2000C. Ta tube only, welded thermocouple mount
Entry  Thursday, August 04, 2022, 09:31, Ferran Boix Pamies, Empty, , TARGET BOAT, In progress, TC on Ta boat test. 
 11am: Setting up new target tube thermocouple test
Thursday, August 04, 2022, 09:31 Test finished August 3rd afternoon. Venting now.  
 
Entry  Wednesday, June 29, 2022, 10:12, Darwin Ortiz Rosales, TaC, 44692-10, HP-FEBIAD, Done, TaC coating sintering 
Wednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Entry  Tuesday, June 28, 2022, 09:31, Ferran Boix Pamies, Empty, 41882-2, TARGET BOAT, In progress, TC test on Ta tube 
Tuesday, June 27, 2022, early afternoon: We assembled the setup in evap2 and started the pumps leaving it running over night.
Tuesday, June 28, 2022, 09:31 Turbo pump stopped for unknown reasons a few hours after we left. Restarting the pump.
Tuesday, June 28, 2022, 10:23 Vacuum down to 1e-5T start to ramp up TGHT 1A/10s to 200A.
Entry  Tuesday, June 21, 2022, 09:48, Darwin Ortiz Rosales, SiC, 37978-1, HP-FEBIAD, Done, T-220617 sintering 
Tuesday, June 21, 2022, 09:43
Total number of foils: 377 ( including 6 analysis discs on the right side of the container)
Total weight = 1454 g (includes heatshields, spring and T bar)
Entry  Monday, June 20, 2022, 14:52, Darwin Ortiz Rosales, Empty, , , Done, softstart of new TP 
Monday, June 20, 2022, 14:50 
A new Turbo pump was installed this morning and it was soft started.  It has operated correctly and it is ready for use.  Derek O. 
installed it.
Entry  Tuesday, June 14, 2022, 09:04, Darwin Ortiz Rosales, Ta, 37978-1, HP-FEBIAD, Done, TaC coating sintering 
Tuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Entry  Wednesday, June 08, 2022, 10:00, Flora Wu, , boat, , Done, carbonize PAN 10% discs 
Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun fiber pellets 
Total weight = 208.3 g
    Reply  Thursday, June 09, 2022, 19:20, John Wong, , boat, , Done, carbonize PAN 10% discs evap2-screenshot_01.PNGevap2-screenshot_02.pngevap2-screenshot_3.pngtemp-current-plot.xlsxevap2-screenshot_04.PNG


    
        
            Flora Wu wrote:
        
        
            
            Thursday, June 09, 2022, 11:25
Entry  Thursday, June 09, 2022, 09:09, Darwin Ortiz Rosales, Ta, , HP-FEBIAD, Done, Troubleshooting MicrosoftTeams-image_(3).pngMicrosoftTeams-image_(4).pngMicrosoftTeams-image_(5).png
Thursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022 @ ~3.00 pm a "dummy" target container was installed in EVAP 2 after the heatshield assembly had been
swapped.
Entry  Tuesday, June 07, 2022, 07:31, Darwin Ortiz Rosales, SiC, 42464-2, HP-FEBIAD, Done, T-220524 Sintering SiC 
Tuesday, June 07, 2022, 07:19
Total number of foils: 403 ( including 5 analysis discs on the right side of the container)
Total weight = 1535.3 g (includes heatshields, spring and T bar)
Entry  Thursday, June 02, 2022, 16:53, Aaron Schmidt, Ta, 44691-12, LP-SIS, In progress, Conditioning Ta#64 
 Ta#64 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") Measured.
Entry  Wednesday, May 18, 2022, 09:59, Darwin Ortiz Rosales, SiC, 44692-9, HP-FEBIAD, Done, T-220516 Sintering SiC 
 Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Entry  Tuesday, May 10, 2022, 14:43, Aaron Schmidt, , , , Maintenance, Active TP removed / Swap / Slow start TP 
 Tuesday, May 10, 2022, 14:42: TV551 Varian. SN: 202311 (Slightly active from BL1A
- will not cross contaminate. Field only - Tagged) was removed as it was meant to be a temporary fix. Replacement (Refurbished) pump is to be installed.
(Tomorrow - Use slow start function as per vacuum group) 
Entry  Monday, April 25, 2022, 08:31, Ferran Boix Pamies, Empty, Ta boat used for annealing, TARGET BOAT, Done, PEEK sample test 2 
Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T . Ramping up 1A/10s to 500A. 
Monday, April 25, 2022, 10:05 500A reached, waiting 1h. TC at 50degC
Entry  Thursday, April 21, 2022, 09:45, Darwin Ortiz Rosales, TaC, 42218-2, LP-IG-LIS, Done, TaC coating 
Thursday, April 21, 2022, 09:43
TaC coated Target container was placed in Evaporator 2 yesterday and left pressuring down.
Ta Heatshields: 3
Entry  Sunday, April 17, 2022, 10:37, Ferran Boix Pamies, Empty, Ta boat used for annealing, TARGET BOAT, Done, PEEK samples heat test 
 Thursday, April 14, 2022, 10:36 Setup, PEEK samples installed on heatshield with TC. Pump down over the weekend.
Sunday, April 17, 2022, 10:37 Vacuum 3e-7T, ramp up TGHT 1A/10s to 500A 
Sunday, April 17, 2022, 12:00 500A reached, waiting 1hour. TC at 42degC. 
Entry  Tuesday, April 12, 2022, 13:41, Aaron Schmidt, , , , Maintenance, New Flex - line HS installed 
Old HS sprang a leak in the copper tubing.  
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. 
Entry  Wednesday, March 23, 2022, 10:52, Darwin Ortiz Rosales, TaC, 44692-9, HP-FEBIAD, Done, TaC coating  image_2022-03-24_201954.png
Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3.5 layers) (two pieces
around the fins only and 3 layers around the whole )
Entry  Wednesday, March 09, 2022, 06:27, Darwin Ortiz Rosales, TaC, 42464-2, HP-FEBIAD, Done, TaC coating/sintering 
 Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Entry  Tuesday, February 15, 2022, 12:37, Darwin Ortiz Rosales, Nb, , TARGET BOAT, Done, Nb annealing for Phillip 
Wednesday, February 09, 2022, 06:55 
Target boat with a layer of niobium foil on the bottom used to heat up Nb samples to 1400 C for
4 hrs.