Entry  Monday, August 21, 2017, 17:32, John Wong, SiC, , TARGET BOAT, Done, Carbonization of sol-gel SiO2+CNT 

Monday, August 21, 2017, 17:09

Two pellets of sol-gel SiO2+CNT were produced.  See lab book pg 44-46 for details. 

Samples were loaded in Ta boat, wrapped with heat shield (1 layer)

Synthesis temperature = 1600C.  TGHT ~ 460A/8.0V

Vacuum at 7.5 e-6 Torr.

TGHt Auto-ramp at 01A/min to reach 350A. 


 Thursday, August 24, 2017, 00:28

TGHT reached to 350A/5.9V, temp @ 1230C (in-line with the last measurement see elog 378).

Increase TGHT to 430, ramp at 0.1A/min.


 Thursday, August 24, 2017, 23:42

TGHT reached to 430A/7.87V, temp at 1410C. Outgassing pressure reached to peak at 430A before TGHT stabilized.  (Evolution of SiO(g)???)

Ramp up to 460A at 0.1A/min.


 Friday, August 25, 2017, 10:30

TGHT reached to 460A/8.6V, temp at 1520C.  More outgassing was observed as temp was increased.

Tapping up TGHT to reach 1600c.


Friday, August 25, 2017, 15:17

Temp reached to 1600C; TGHT at 492 A/9.3 V.  Temperature was held for 3 hours.  Due to a problem with the backing pump, the cooling down process was initiated. 

Sample will be taken out next Monday for evaluation.


 

Entry  Tuesday, September 12, 2017, 13:08, Aaron Schmidt, , , , , Window shutter added 

 Tuesday, September 12, 2017, 12:00:

The coated back window was changed to a shuttered window.

On star-point flange bolt interfered with the shutter, however it was removed, shortened, and re-installed.

The installation is complete. Awaiting roughing pump to leak check.

Entry  Wednesday, September 27, 2017, 18:06, John Wong, np-SiC, , TARGET BOAT, Done, NS-npSiC & B3 pellets heat treatments Capture.JPG

Wednesday, September 27, 2017, 18:05

 3 samples from NS-npSiC pellets, pressured at 10T  (see lab book pg 53)

3 samples from B3 pellets, 600MPa (see lab book pg 50)

Desired temperature = 1550C, est current = 450A


 Thursday, September 28, 2017, 11:17

Vac at 8.8e-7 Torr.  

Ramping TGHT up to 450A at 0.2A/min


 Thursday, September 28, 2017, 17:54

Setup screen capture, see pg 53 for saved directory


 Friday, September 29, 2017, 23:54

TGHT reached to 450A/7.9V, temp at 1510C.

Tapping up TGHT to 465/8.2V to reach 1550C

Pressure coming down from 1.6e-6 Torr.

See attachment 1 for the 20-hour plot


 Sunday, October 01, 2017, 00:30

At around 20:00 on Sep 30, there was an increase of ~0.1 V which caused a rise in temp from 1550 to 1576C (see screen capture).  Pressure increased slightly.

Tapped down TGHT to 445A/8.05V; temp maintained at 1550C.


 Monday, October 02, 2017, 17:55

Cooling TGHT from 445A/8.07V, 1500oC to room temperature at 1A/min


 Tuesday, October 03, 2017, 11:09

Target has been cooled for over 10 hours. 

Venting chamber


 

Entry  Wednesday, October 04, 2017, 16:40, John Wong, np-SiC, , TARGET BOAT, Done, Thermal treatment cast-pellet npSiC/PAN - det. sintering effect 1550C.JPG

Wednesday, October 04, 2017, 16:37

3 samples of npSiC/PAN cast-pellets, see lab book p. 57 for details.

Desired temperature 1550C, expected TGHT ~450A.

Chamber pumped down.

TGHT ramping at 0.2A/min


 Friday, October 06, 2017, 10:45

TGHt at 450A/7.7A, temp at 1510C.  (p.s voltage is lower than before, elog 389).

Tapped up to 466A/8.08v, temp reached to 1550C.  A slight increase in pressure when tapping up TGHT. (see attached screen capture)

Will maintain heating temperature for several days before cooling down


 Tuesday, October 10, 2017, 10:50

Samples was heated for several days at 1550C. 

Cooling down initiated at 2A/min.


 Tuesday, October 10, 2017, 18:07

Chamber is vented.

Process done


 

Entry  Monday, November 06, 2017, 18:25, John Wong, np-SiC, , TARGET BOAT, Done, Thermal treatment npSiC Horn vs Probe samples - P74 Capture1.JPG

Monday, November 06, 2017, 18:21

Samples of Horn and Probe - npSiC. see pg 74.

6 samples in total, to be heated to 1550C, about 450A.  Set ramping rate at 0.2A/min.  

Chamber pumping down


 Tuesday, November 07, 2017, 15:01

TGHT reached to 450A/8.2V, temperature measured at 1460C.  See attachment 1.

Increased ramping to 480A, targeting 1550C.


 Tuesday, November 07, 2017, 22:26

Samples have been heating at 1550C with TGHT at 480A/8.78V for about 8 hours.

Vacuum stabilizes at 8.4e-7 Torr.

Initial cooling at 2A/min.


 Wednesday, November 08, 2017, 10:36

Venting chamber.


 

Entry  Thursday, December 07, 2017, 10:03, Laura Lambert, Endcaps, , TARGET BOAT, In progress, Sintering TaC coating on endcaps and springs 

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

    Reply  Thursday, December 07, 2017, 11:56, Laura Lambert, Endcaps, , TARGET BOAT, Problems, Sintering TaC coating on endcaps and springs trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

    Reply  Friday, December 08, 2017, 15:29, Laura Lambert, Endcaps, , TARGET BOAT, Problems resolved, Sintering TaC coating on endcaps and springs 

Laura Lambert wrote:

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

 Friday, December 08, 2017, 15:29

Interlocks have been updated.

TGHT should now run up to 500mTorr before tripping off.


 

    Reply  Friday, December 08, 2017, 15:42, Laura Lambert, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on endcaps and springs 

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Thursday, December 07, 2017, 09:57

Each endcap is wrapped in a separate piece of graphite foil and placed in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.98

HS water valves opened, no leaks detected.

IGP1 = 5.9e-7 Torr

IGP2 = 4.0e-7 Torr

Tapping up manually.

Final desired temperature = 1800C


 

 Thursday, December 07, 2017, 11:51

TGHT tripped off.

Turns out the vacuum limits have not been fully updated when they should have been and the old ones still apply.

IGP1 reached 8e-5 Torr which tripped off the system.

TGHT = 80A, 1.05V when the system tripped.


 

 Friday, December 08, 2017, 15:29

Interlocks have been updated.

TGHT should now run up to 500mTorr before tripping off.


 

Friday, December 08, 2017, 15:41

IGP1 = 2.8e-7 Torr

IGP2 = 1.9e-7 Torr

Tapped up manually to 50A

Initiated auto-ramp at a rate of 0.2A/min up to 300A.

Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.


 Monday, December 11, 2017, 09:37

IGP1 = 2.4e-7

TGHT = 300A, 4.80V

OMEGA = 1175C

Tapping up manually...


 Monday, December 11, 2017, 14:19

Tapped up manually to 1800C

IGP1 = 2.1e-6 Torr

IGP2 = 2.1e-6 Torr

TGHT = 545A, 9.90V

OMEGA = 1810C

Will remain at max setpoints overnight and cool down in the a.m.


 Tuesday, December 12, 2017, 09:01

TGHT = 545A, 9.96V

OMEGA = 1833C

Remained at max setpoints for ~18hrs

IGP1 = 4.2e-7 Torr

IGP2 = 3.9e-7 Torr

Initiating auto-cool at 2.0A/min


 Wednesday, December 13, 2017, 11:05

Vented in air and removed from evap2 this morning.


 

Entry  Monday, December 11, 2017, 14:22, Laura Lambert, , , , Maintenance, Interlock limits updated to 500mTorr 

 Monday, December 11, 2017, 14:21

Dave updated evap2 interlock limits to 500mTorr for TGHT and TBHT on friday


 

Entry  Wednesday, April 25, 2018, 07:21, Aaron Schmidt, , , , Done, HS swap evap 2 

Wednesday, April 25, 2018, 07:05: TGHT & TBHT off

Wednesday, April 25, 2018, 07:15: BV1 & TP1 off

Wednesday, April 25, 2018, 07:17: PV1 & BP1off

Wednesday, April 25, 2018, 07:19: Begin venting

Wednesday, April 25, 2018, 07:22: Full venting.

Wednesday, April 25, 2018, 07:29: HS waterlines purged.

Wednesday, April 25, 2018, 07:48: Aurelia's test ta target assembly was removed. The blank target heating heat shield for evap 2 was reinstalled. shields in but empty.

Evap 2 Doors closed.

Entry  Wednesday, May 23, 2018, 15:21, Laura Lambert, Empty, , HP-FEBIAD-CTL, Done, Sintering TaC coating container for UCx#23 

Wednesday, May 16, 2018, 09:56

Container coated with TaC using 'flushing technique' and let dry over weekend.

Cleaned ionizer tube with acetone, no coating inside ionizer tube.

Wrapped with 3 x Ta heat shields, not incl center block

OMEGA slope = 0.98

*NOTE: realized after pumping down, filament on IGP2 is burnt out and needs replacing, will order a new one and use IGP1 for this process


Thursday, May 17, 2018, 13:15 

HS water valves remained open since the last time evap2 was used, no leak check done.

Tapped up manually to 50A.

Waited ~1hr

Vacuum stable.

IGP1 = 1e-6 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 350A

Initiating auto ramp for TBHT @ 0.1A/min to a max setpoint of 230A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


Friday, May 18, 2018, 13:00 

Tapped up manually.

TGHT = 495A, 8.84V

TBHT = 230A, 3.26V

MIKRON = 2000C

Filament = 1910C

OMEGA = 1910C

Will remain at max setpoints over weekend.


Tuesday, May 22, 2018, 10:04 

Remained at max setpoints over long wknd.

TGHT = 495A, 8.85V

TBHT = 230A, 3.26V

IGP1 = 2.47e-7 Torr

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


Wednesday, May 23, 2018, 10:08 

Vented in air this morning.

Container looks good!

Transferred into glove box.


 

 

Entry  Friday, June 08, 2018, 08:33, Aaron Schmidt, , , , Problems resolved, Chiller tripped / Alarm 

Alarm noted on passing Hot Lab. RPG notified, no radiological hazards. ISAC ops contacted, drop in DI water last night.

Entered w/ PPE. Chiller alarming. Evap 1 running ok

Friday, June 08, 2018, 08:30: Chiller turned on/off. Reset. No alarm.

Entry  Tuesday, July 10, 2018, 16:43, John Wong, Empty, , LP-SIS, Done, For nano-SiC#1  

Tuesday, July 10, 2018, 16:40

Container was flashed with TaC solution and let dry in air. 

No Ta heat shield is used. 

Desired temperature 1900C, ramp up TGHT accordingly. (Take note at 1500 and 1600 C).  

OMEGA slope setting = 0.98

TBHT set at 250A (as usual)

Chamber is currently being pump down.


 Wednesday, July 11, 2018, 10:54

Pressure at 4.5 e-7 Torr. 

Autoramping TGHT at 0.1A/min to reach 300A and TBHT at 0.1A/min to reach 230A. 

Once TGHT setting is reached, it will be further increased according to the temp measurement. 


 Friday, July 13, 2018, 10:57

TGHT at 300A/4.02V but temp is still too low to be detected. 

Increase TGHT to 400A, ramping at 1A/min.  TBHT is already at 230A/4.0V.

Current pressure at 4.4e-7 Torr.


 Friday, July 13, 2018, 13:09

TGHT reached 400A/5.85V, temp reading 1112C.

Ramping up to 500A


 TGHT reached 500A/7.9V.  temp reading 1250 C.

Ramping up to 600A


 Friday, July 13, 2018, 17:13

TGHT reached 600A/10.74V, temp reading 1742 C.

Ramping up to 650A


 Wednesday, July 18, 2018, 11:54

TGHT has remained at 650A/12.05V since Friday July 13.

Temperature check:

pyrometer: 1650 (250 correction) = 1900 C

OMEGA:  1-color (e= 0.32 for spectral hemispherical) = 1910 C

OMEGA: 2-color (slope @ 0.99) = 1905 C

Measurements are in agreement

Cooling TGHT at 2A/min, TBHT at 1A/min. Current pressure 3.7e-7 Torr.


 Wednesday, July 18, 2018, 13:47

TGHT at 500A, 8.4V, temp at 1600 C (4.2 kW)

TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)

TGHT at 450/7.31V, temp at 1500 C (3.28 kW)

With TBHT set for 230A, usual operation setting, the temperature on the transfer tube is to exceed 2000 C.  Keeping TBHT at that setting may affect the overall temperature.

Note:  To condition the nanoSiC, it is better to keep TBHT at 0A and ramp up TGHT to 475A while monitoring the vacuum.  Then step up TBHT; any increase in vacuum would indicate a local evaporation of nanoSiC close to the ionizer. 

Temp measurement is complete, cooling down TGHT/TBHT to zero.


 Thursday, July 19, 2018, 12:23

TGHT has been at 0A for over 18 hours.  Vacuum pressure at 7e-8 Torr.

Venting chamber.


 

Entry  Tuesday, September 04, 2018, 17:04, John Wong, Empty, , LP-SIS, Problems, TaC coating/sintering for UC target container TGHT-Current_error.JPG

Tuesday, September 04, 2018, 16:58

Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)

Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Chamber is currently being pumped down


 Wednesday, September 05, 2018, 10:53

Pressure at 9.5-7 Torr. 

Auto ramping TGHT at 1A/min to reach 400A, and TBHT at 1A/min to reach 230A.


 Wednesday, September 05, 2018, 17:52

Problem with TGHT readback vs setpoint.  TGHT ramped up to 400A, temp measured at 1830C.  However, the setup remained at 228A (see attachment).  The autoramping program only sees the readback; in this case, the TGHT would continue to keep ramping up until the target breaks.  The autoramping program has stopped just in time. 

TGHT stepped down to 400A (setpoint), readback at 206A/6.59V.  TGHT at 230A/4.16V.  Temperature holding at 1783C. 

Control has been informed.


 Thursday, September 06, 2018, 10:54

Target temp holding at 1773C.  Pressure at 8.5e-7 Torr. 

Ramping down TGHT and TBHT, and inspect the container later. 

Problem with the TGHT readback/setpoint will need to be investigated.


 Friday, September 07, 2018, 16:03

Target container is nicely sintered.

Awaiting for Control group to investigate with the problem on TGHT readback/setpoint. 


 

Entry  Tuesday, September 11, 2018, 10:47, Aaron Schmidt, , , , , Evap 2 step discrepancy  PS_Check.docx

 Tuesday, September 11, 2018, 10:45:

TGHT: 53.4 A   TBHT: 57.75

Actual

TGHT: 60.0A  TBHT: 59.0A

Uploaded the rest to Word doc. Screenshots included.

Entry  Tuesday, April 16, 2019, 13:40, Aaron Schmidt, , , , , Replace bottom insert on HS  

 Tuesday, April 16, 2019, 13:38: Replaced the bottom insert on the heat shield. 

Used small amount of isopropyl alcohol to wipe the inside if the HS out. 

Entry  Tuesday, May 14, 2019, 13:57, Aaron Schmidt, , , LP-FEBIAD, Done, Test FEBIAD 

 Tuesday, May 14, 2019, 13:56: Removed old HS w/ flexible lines & swapped in the FEBIAD. (HS waterlines are still purged.) Roughing.

Tuesday, May 14, 2019, 14:06: Turbo pump on. 

Tuesday, May 14, 2019, 14:22: Waterlines opened. Vacuum ok @ 5.34e-05T & dropping. 


Wednesday, May 15, 2019, 06:21

IGP1 = 5.99e-7 Torr,

manually tapping to 40 A.

Autoramp set to 2A/min to TGHT=580 A and TBHT=290 A


Tuesday, May 21, 2019, 08:13

IGP1= 1.43e-7 Torr

TGHT = 580.875 A, 11.22 V

TBHT =  4.45 V, 309.219 A

Temperature 1004 C measured at Ta foil

Ramp-down was initiated with IGP1 = 1.423e-07 Torr

Ramp rate = 2A/min for TGHT and 1/min for TBHT

EVAP2 was vented with air


 Tuesday, May 21, 2019, 14:20 Test FEBIAD removed - AS.

Entry  Tuesday, May 21, 2019, 14:34, Aaron Schmidt, , , , , HS swap to EVAP 2 flex line. 

 Tuesday, May 21, 2019, 14:33: Install flexible line evap 2 HS.

Entry  Tuesday, June 04, 2019, 08:41, Darwin Ortiz Rosales, Endcaps, , TARGET BOAT, Done, Sintering TaC coating on endcaps and springs 

Tuesday, June 04, 2019, 08:36

Each endcap is separated with a disc of graphite foil and rolled into packs of 5 within a foil envelope in a target boat.

There are also 4 coated springs, 2 on each side of the stack of endcaps.

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumped down overnight.

OMEGA slope = 0.99

IGP1 = 3.5e-7 Torr

Will Tap TGHT up manually to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


Tuesday, June 04, 2019, 11:54

IGP1= 6.1e-06 Torr

TGHT= 40 A

Begin autoramp to 400A at 1A/min


Out-gassing cycles observed.  Reduced autoramp to 0.5A/min

Currently TGHT=65A, 0.60 V


Wednesday, June 05, 2019, 08:27

TGHT = 321A, 4.9V @1149C

IGP1= 8.49 e-6 Torr

Set autoramp to 1A/min to530 A

 


Wednesday, June 05, 2019, 13:26

TGHT 530A, 9.2V

IGP1= 3.01e-05 Torr

OMEGA Temperature = 1689 Celsius

Set autoramp to 570A at 1A/min


 Wednesday, June 05, 2019, 15:51

Tapped manually to 1800 Celsius

TGHT 579A, 10.1V

IGP1= 2.06e-05 Torr

TGHT tapped down to 575A when OMEGA T ~1810 C


Thursday, June 06, 2019, 08:13

TGHT = 575A, 9.95V

OMEGA = 1809 C

IGP1 = 4.1e-7 Torr

Initiating auto-cool at -2.0A/min


Thursday, June 06, 2019, 16:00

After 1 hour  of TGHT at 0A and 0V, unloaded the Target boat.

 