Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 29 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  569   Wednesday, March 09, 2022, 06:27 Darwin Ortiz RosalesTaC42464-2HP-FEBIADDoneTaC coating/sintering Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated
  
  570   Wednesday, March 23, 2022, 10:52 Darwin Ortiz RosalesTaC44692-9HP-FEBIADDoneTaC coating Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated
 image_2022-03-24_201954.png 
  572   Sunday, April 17, 2022, 10:37 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK samples heat test Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend.
  
  573   Thursday, April 21, 2022, 09:45 Darwin Ortiz RosalesTaC42218-2LP-IG-LISDoneTaC coatingThursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring
  
  574   Monday, April 25, 2022, 08:31 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK sample test 2Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. 
  
  576   Wednesday, May 18, 2022, 09:59 Darwin Ortiz RosalesSiC44692-9HP-FEBIADDoneT-220516 Sintering SiC Wednesday, May 18, 2022, 09:46
Total number of foils:
  
  578   Tuesday, June 07, 2022, 07:31 Darwin Ortiz RosalesSiC42464-2HP-FEBIADDoneT-220524 Sintering SiCTuesday, June 07, 2022, 07:19
Total number of foils:
  
  579   Wednesday, June 08, 2022, 10:00 Flora Wu boat Donecarbonize PAN 10% discsThursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun
  
  580   Thursday, June 09, 2022, 09:09 Darwin Ortiz RosalesTa HP-FEBIADDoneTroubleshootingThursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container
 MicrosoftTeams-image_(3).pngMicrosoftTeams-image_(4).pngMicrosoftTeams-image_(5).png 
  581   Thursday, June 09, 2022, 19:20 John Wong boat Donecarbonize PAN 10% discs


   
        
            
 evap2-screenshot_01.PNGevap2-screenshot_02.pngevap2-screenshot_3.pngtemp-current-plot.xlsxevap2-screenshot_04.PNG 
  582   Tuesday, June 14, 2022, 09:04 Darwin Ortiz RosalesTa37978-1HP-FEBIADDoneTaC coating sinteringTuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated
  
  583   Monday, June 20, 2022, 14:52 Darwin Ortiz RosalesEmpty  Donesoftstart of new TPMonday, June 20, 2022, 14:50 
A new Turbo pump was installed this
morning and it was soft started.  It
  
  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sinteringTuesday, June 21, 2022, 09:43
Total number of foils:
  
  586   Wednesday, June 29, 2022, 10:12 Darwin Ortiz RosalesTaC44692-10HP-FEBIADDoneTaC coating sinteringWednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated
  
  589   Thursday, August 25, 2022, 10:16 Darwin Ortiz RosalesTiC44692-10HP-FEBIADDoneTiC 220818 Sintering (TiC #6)Thursday, August 25, 2022, 10:06
 
Target container is loaded with 379
  
  590   Thursday, September 01, 2022, 12:32 Darwin Ortiz RosalesTaC44691-13LP-SISDoneTaC coating sinteringThursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields.
 MicrosoftTeams-image_(13).png 
  591   Wednesday, September 14, 2022, 11:48 Darwin Ortiz Rosales  TARGET BOATDoneGrahite disc conditioning 220907GWednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields.
  
  592   Thursday, September 22, 2022, 07:15 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sinteringThursday, September 22, 2022, 07:13
Each endcap is separated with
  
  593   Thursday, September 29, 2022, 10:02 Darwin Ortiz Rosales 44139-3TARGET BOATDone220926-Graphite conditioning in target tubeThursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields.
  
  594   Monday, October 17, 2022, 11:32 Darwin Ortiz RosalesTaC45220-2LP-SISDoneTaC coating sinteringMonday, October 17, 2022, 10:03
The coated container was wrapped
in 4 Ta foil heatshields.
  
ELOG V2.9.2-2455