569
|
Wednesday, March 09, 2022, 06:27 |
Darwin Ortiz Rosales | TaC | 42464-2 | HP-FEBIAD | Done | TaC coating/sintering | Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @1A/min to 60 A
Wednesday, March 09, 2022, 09:29
TGHT= 60 A 0.67 V
TBHT = 60A 0.59V
IGP1= 1.77e-6 Torr
autoramp @ 2A/min to 120 A and monitor (both TGHT and TBHT)
Wednesday, March 09, 2022, 10:19
IGP1 was increasing to fast. Manually lowered current to 105A on both TGHT and TBHT.
Will allow pressure to stabilize
Plant group requested maintenance work for EF12/13
Therefore, keeping system as is until further instructions from plant group.
Thursday, March 10, 2022, 15:18
Will resume ramp up to 120 A for both TGHT and TBHT @ 1A/min
IGP1= 6.4 e-07 Torr
Thursday, March 10, 2022, 15:30
Increase ramp rate to 2A/min
Thursday, March 10, 2022, 17:41
@ 245 A TGHT and 230A TBHT ramp back down to 100 A for both as OMEGA not displaying Temperature. Will need to go in tomorrow to fix OMEGA
Friday, March 11, 2022, 14:25
Ramping at 2A/min to 230A for both TGHT and TBHT
Friday, March 11, 2022, 15:17
IGP1= 1.23e-6 Torr
Continue Ramping TGHT @ 3A/min to 400 A keep TBHT at 230A
Friday, March 11, 2022, 22:22
@ TGHT 725 A 1800 C was reached on OMEGA
Kept there since 7:20 pm. Start rampdown at 11:20 pm.
Friday, March 11, 2022, 23:19
IGP1= 6.9e-6 Torr
OMEGA= 1805C
TGHT= 725 A, 10.9V
TBHT= 232A, 3.1V
Start rampdown at -2A/min on TGHT and -1A/min for TBHT
|
|
570
|
Wednesday, March 23, 2022, 10:52 |
Darwin Ortiz Rosales | TaC | 44692-9 | HP-FEBIAD | Done | TaC coating | Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3.5 layers) (two pieces around the fins only and 3 layers around the whole )
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max). TGHT expected to reach desired Temperature @~700A
Evap 2 was pumped down over previous night
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @0.5 A/min to 60 A
Wednesday, March 23, 2022, 11:37
Increase autoramp to 1A/min to 60A for both TGHT and TBHT
Wednesday, March 23, 2022, 12:24
Pressure increasing at 60A so will leave at this current until pressure drops
Wednesday, March 23, 2022, 13:32
IGP1 = 2.9e-06 Torr
Will autoramp at 0.5A/min to 90A both TGHT and TBHT
Thursday, March 24, 2022, 16:35
1800C reached at 724A TGHT . TBHT @ 230A. Will keep at this temperature for 4 hours.
Thursday, March 24, 2022, 20:20
IGP1 = 6.9 e-06 Torr
OMEGA= 1828 C
TGHT = 724 A, 11.6 V
TBHT = 232.8 A, 3.1 V
Will start ramp-down at 2035 @ -2A/min TGHT and -1A/min TBHT
|
Attachment 1: image_2022-03-24_201954.png
|
|
|
572
|
Sunday, April 17, 2022, 10:37 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK samples heat test | Thursday, April 14, 2022, 10:36 Setup, PEEK samples installed on heatshield with TC. Pump down over the weekend.
Sunday, April 17, 2022, 10:37 Vacuum 3e-7T, ramp up TGHT 1A/10s to 500A
Sunday, April 17, 2022, 12:00 500A reached, waiting 1hour. TC at 42degC.
Sunday, April 17, 2022, 12:57 after 1h, TC at 45degC. Ramping down 1A/10s. Vacuum 2.7e-6Torr.
Sunday, April 17, 2022, 14:33 ramped down to 0A. Turning off turbo and venting. |
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed in Evaporator 2 yesterday and left pressuring down.
Ta Heatshields: 3
Target temperature on OMEGA = 1800-1850 C
OMEGA slope: 0.990
Target time at temperature = 4 hours
Target final TBHT current: 230A
Approximate final TGHT current: 420A (will adjust manually)
Heating autoramp started @ ~2A/min on both TGHT and TBHT
initial IGP1 = 9.3e-7 Torr
Thursday, April 21, 2022, 10:38
Pressure trending down after peak. Start autoramp at 1A/min to 50A on both TGHT and TBHT.
Thursday, April 21, 2022, 10:56
Pressure continues to decrease. Will ramp up faster @4A/min to 90A for both TGHT and TBHT.
Thursday, April 21, 2022, 11:07
Second peak has begun to form . Will keep at 90A awaiting stabilization
Thursday, April 21, 2022, 11:35
pressure stable. Continue to autoramp at 1A/min and if pressure stable increase ramp to 4A/min
Thursday, April 21, 2022, 11:49
small peak observed and stabilizing. Autoramp @ 6A/min to 400A on TGHT and to 230A on TBHT
Thursday, April 21, 2022, 12:35
Regression plot . 1800C should be reached ~1800C.
Thursday, April 21, 2022, 12:44
Target current reached.
OMEGA = 1762 C
Will manually bump current to 415 A
OMEGA = 1802 @ 415 A @ 12:51 pm
Thursday, April 21, 2022, 16:50
OMEGA=1823 C
IGP1= 2.9e-06 Torr
TGHT= 417 A, 7.2 V
TBHT= 232A, 3.0V
Rampdown will start at -2A/min for both TGHT and -1A/min TBHT
|
|
574
|
Monday, April 25, 2022, 08:31 |
Ferran Boix Pamies | Empty | Ta boat used for annealing | TARGET BOAT | Done | PEEK sample test 2 | Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T . Ramping up 1A/10s to 500A.
Monday, April 25, 2022, 10:05 500A reached, waiting 1h. TC at 50degC
Monday, April 25, 2022, 10:59 TC at 58degC. Ramping down 1A/10s to 0 A.
Monday, April 25, 2022, 13:37 TGHT at 0A , venting system. |
|
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Total length packed 17 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 30A at 3 A/min
then continue to and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.1 e-07 Torr at start of initial ramp. Note, first real operation with new noisy Turbo Pump.
Wednesday, May 18, 2022, 10:18
Pressure increase observed starting around 60A. Ramped to 70 A and will leave until pressure stabilizes
After about 30 minutes pressure dropped so ramped up to 90 A @1A/min on both TGHT and TBHT
Wednesday, May 18, 2022, 11:37
pressure spike around 90A. will leave until pressure stabilizes
Wednesday, May 18, 2022, 12:54
start autoramp to 100A at 1A/min. IGP1= 1.4e-4 Torr
Wednesday, May 18, 2022, 13:15
autoramp to 150A @1A/min
Wednesday, May 18, 2022, 13:41
At 110A another spike in pressure. System waiting for good vacuum
Wednesday, May 18, 2022, 15:24
ramped to 150A on both TGHT and TBHT. Ramping to 200 A at @A/min for both TGHT and TBHT
currently IGP1= 2.0e-4 Torr
Wednesday, May 18, 2022, 15:33
Pressure still trending down; therefore will start ramp at 4A/min to 400 amp on TGHT and 230A to TBHT
Wednesday, May 18, 2022, 16:22
Increasing ramp to 4A/min on TGHT
Wednesday, May 18, 2022, 17:26
switched to 6A/min in 1A/10s increments on TGHT
Wednesday, May 18, 2022, 17:43
Set final current to 730 A as per regression attached.
Wednesday, May 18, 2022, 17:54
Final current on TGHT = 740A, 11.9 V
OMEGA = 1775 C
TBHT = 230A,
Will leave for 4 hours
Wednesday, May 18, 2022, 19:56
Temperature dropped so increased current to 755A for the remaining of the time.
Friday, May 20, 2022, 08:58
Final notes: The difference between initial and final mass was 6 g as expected. Slight coating on window of evaporator may explain apparent temperature drop. Next time will keep current at projected setting. The material looks good with slight overheating on the outer discs of left side.
|
|
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: 403 ( including 5 analysis discs on the right side of the container)
Total weight = 1535.3 g (includes heatshields, spring and T bar)
Total length packed 16.4 cm (excluding 5 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 50A at 3 A/min
then continue to 80A and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.6 e-07 Torr at start of initial ramp.
Tuesday, June 07, 2022, 11:14
Ramping to 150A on TGHT and TBHT at 1A/min
Ramped TGHT and TBHT to 230A at 2A/min
Tuesday, June 07, 2022, 13:12
Ramping TGHT to 600A at 4A/min
TBHT at 230A, 3.0V
Tuesday, June 07, 2022, 16:41
TGHT= 740 A, 12.1V
TBHT= 232A, 3.0 V
OMEGA reading 1616C but questionable. Will leave for 4 hours at 740A top TGHT.
Wednesday, June 08, 2022, 22:15
Early Wednesday morning the left TGHT bolt was found damaged. The target leg was coated with bolt material rendering the Target inoperable.
The Heatshield assembly was swapped and surfaces cleaned. A "dummy" FEBIAD was installed to test if the system can withstand high current.
The system was pumped down and ramped to 740A on TGHT at 4A/min. It was then left at that current for 4 to 5 hours.
Currently starting rampdown at -2A/min to 0A.
Photos of the incident attached in *eLog 580*. IGP1= 5.7e-06 Torr
TGHT= 742A, 11.4V |
|
579
|
Wednesday, June 08, 2022, 10:00 |
Flora Wu | | boat | | Done | carbonize PAN 10% discs | Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun fiber pellets
Total weight = 208.3 g
container has 3 Ta heat shields.
Desired temperature at 1800 C
Omega slope set at 0.990
Good vac = 3.0e-5 Torr,
Bad vac = 5.0e-5 Torr.
Pumping down in progress
Thursday, June 09, 2022, 11:25
chamber pumped down below 5e-5
initiate auto ramping, 1A/min ----> 100 A
(see eLog 581)
|
|
580
|
Thursday, June 09, 2022, 09:09 |
Darwin Ortiz Rosales | Ta | | HP-FEBIAD | Done | Troubleshooting | Thursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022 @ ~3.00 pm a "dummy" target container was installed in EVAP 2 after the heatshield assembly had been swapped.
The purpose is to test correct functioning of the system. Melting and evaporation on one of the bolts of the previous target container (eLog578) prompted the change in heatshield assembly and current testing.
TGHT was ramped up to 740A @ 4A/min, left to run at the final current for ~4.5 hours and then ramped down @-2A/min to 0A.
Will dismount dummy container this morning.
IGP1=2.5e-07 Torr
Thursday, June 09, 2022, 11:16
The target appears in good shape. No abnormal behaviour.
Picture attached are of the previous failed target eLog 578
|
Attachment 1: MicrosoftTeams-image_(3).png
|
|
Attachment 2: MicrosoftTeams-image_(4).png
|
|
Attachment 3: MicrosoftTeams-image_(5).png
|
|
|
581
|
Thursday, June 09, 2022, 19:20 |
John Wong | | boat | | Done | carbonize PAN 10% discs |
Flora Wu wrote: |
Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun fiber pellets
Total weight = 208.3 g
container has 3 Ta heat shields.
Desired temperature at 1800 C
Omega slope set at 0.990
Good vac = 3.0e-5 Torr,
Bad vac = 5.0e-5 Torr.
Pumping down in progress
Thursday, June 09, 2022, 11:25
chamber pumped down below 5e-5
initiate auto ramping, 1A/min ----> 100 A
|
Thursday, June 09, 2022, 19:16
Pressure came down below 10e-5 Torr as TGHT ramped up to 100A.
Continue auto ramping to reach 250A at 1A/min.
Thursday, June 09, 2022, 22:52
TGHT is hovering around 127A/1.68 V due to erractic pressure, see attachment #1.. Notice the backing line is at atm pressure - I don't recall this happened in the past.
Temp is still low to be detected on Omega. Will leave this overnight.
Friday, June 10, 2022, 09:07
TGHT has been holding at 250A/3.76V since 2:45am. Pressure comes down as THGT above 200 A. Backing line is back down normal.
Temp reading at 1040 C.
see attachment #2.
Continue to ramp up to 300A, monitoring temp/pressure.
Friday, June 10, 2022, 10:31
TGHT reached to 300A/4.63V, temp at 1145C. Pressure at 1.8e-6 and coming down.
Continue to ramp up to 350A.
Friday, June 10, 2022, 11:59
TGHT at 350A/5.66V, temp at 1300 C, Pressure at 8.1e-7 Torr, and coming down.
Continue to ramp up to 400A.
Friday, June 10, 2022, 13:19
TGHT reached to 400A/6.73V. Pressure coming down from 1.04e-6 Torr.
Temp at 1690. Will set up manually to reach 1800 C.
Friday, June 10, 2022, 13:50
TGHT stepped up to 432A/7.42V. Pressure coming down from 1.3 e-6 Torr.
Temp at 1800 C. See attachment#3 and #4 for the screenshot and temp-current plot.
Dumped striptool data to /usr1/evpr/carbonize_pan10_elog581_a and b.
Will keep at this setting over the weekend, and cooling down will take place on Sunday evening.
Sunday, June 12, 2022, 22:30
TGHT has been holding at 432A/7.40V since Friday. Temperature has gone up slightly to 1825.
See attachment#5 for the overall process.
Initiated cooling down at -2A/min.
Chamber will be vented on Monday morning.
|
Attachment 1: evap2-screenshot_01.PNG
|
|
Attachment 2: evap2-screenshot_02.png
|
|
Attachment 3: evap2-screenshot_3.png
|
|
Attachment 4: temp-current-plot.xlsx
|
Attachment 5: evap2-screenshot_04.PNG
|
|
|
582
|
Tuesday, June 14, 2022, 09:04 |
Darwin Ortiz Rosales | Ta | 37978-1 | HP-FEBIAD | Done | TaC coating sintering | Tuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
OMEGA slope= 0.990
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @2A/min to 80 A then autoramp heat @1A/min to 150 A. Then autoramp TGHT to 675A and TBHT to 230A.
Tuesday, June 14, 2022, 08:49
IGP1= 0.13 Torr
*had timed out and it was off. I RST and turned back on.*
Will wait for the pressure to drop to start heating
Tuesday, June 14, 2022, 09:36
IGP1= 9.4e-06 Torr
Start autoramp @2A/min to 80A
Tuesday, June 14, 2022, 11:27
IGP1= 8.7 e-06 Torr Trending down.
TGHT= 146A, 1.6V
TBHT= 146A, 1.7V
Has been ramping at 1A/min
Change ramp rate to 2A/min to 700A on TGHT and 230A on TBHT
Tuesday, June 14, 2022, 14:48
Change final current on TGHT to 675A, according to plot. May change again.
Currently TGHT= 537A, 7.7V
IGP1= 4.4e-06 Torr
Tuesday, June 14, 2022, 18:46
Top temperature was 1825 Celsius at TGHT = 675A
Will start rampdown at 8:00 pm
Tuesday, June 14, 2022, 20:01
TGHT= 675A, 10.3 V
TBHT= 230A, 3V
OMEGA= 1815C
IGP1= 3.9e-06 Torr
ramping down @-2A/min TGHT and -1A/min TBHT |
|
583
|
Monday, June 20, 2022, 14:52 |
Darwin Ortiz Rosales | Empty | | | Done | softstart of new TP | Monday, June 20, 2022, 14:50
A new Turbo pump was installed this morning and it was soft started. It has operated correctly and it is ready for use. Derek O. installed it.
Previous pump had issues at start-up and was diagnosed as finished by Edi/
|
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: 377 ( including 6 analysis discs on the right side of the container)
Total weight = 1454 g (includes heatshields, spring and T bar)
Total length packed 15.5 cm (excluding 6 analysis discs that will be removed)
container has 3 Ta heat shields and is coated
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 80A at 2 A/min
then to 120A and slow down ramp when pressure begins to increase
max approx 675A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1=3.6 e-07 Torr at start of initial ramp.
Tuesday, June 21, 2022, 13:54
IGP1= 7.1 e-05 and dropping. Start ramp to 150A for both TGHT and TBHT @1A/min
Tuesday, June 21, 2022, 21:27
Increased ramp rate to 3A/min for TGHT to 675A
Tuesday, June 21, 2022, 22:38
Ramp up to 685 A on TGHT and leave for 4 hours.
OMEGA = 1645 C but suspect reading not on Ta surface.
Wednesday, June 22, 2022, 02:28
IGP1=7.7e-6 Torr
OMEGA =1610C
TGHT = 685A, 10.5V
TBHT = 230A, 3V
initiate rampdown at -2A/min and -1Amin TGHT and TBHT |
|
586
|
Wednesday, June 29, 2022, 10:12 |
Darwin Ortiz Rosales | TaC | 44692-10 | HP-FEBIAD | Done | TaC coating sintering | Wednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature = 1800 C , TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over previous night
OMEGA slope= 0.990
Good vacuum = 3.00 e-4 Torr
Bad vacuum = 5.00 e-2 Torr
IGP1= 1.2 e-06 Torr
Start autoramp @2A/min to 80 A then autoramp heat @1A/min to 150 A. Then autoramp TGHT to 675A and TBHT to 230A.1
Wednesday, June 29, 2022, 10:13
Chamber isolation performed and no change of pressure observed.
Water leak test performed and no pressure change detected.
Starting ramp up
Wednesday, June 29, 2022, 13:23
Ramping to 675A on TGHT and 230A on TBHT @ 2A/min
Ramped TGHT to 680A, 10.6V and held for 4 hours
Wednesday, June 29, 2022, 21:52
Started rampdown @-2A/min TGHT and -1A/min TBHT |
|
589
|
Thursday, August 25, 2022, 10:16 |
Darwin Ortiz Rosales | TiC | 44692-10 | HP-FEBIAD | Done | TiC 220818 Sintering (TiC #6) | Thursday, August 25, 2022, 10:06
Target container is loaded with 379 Discs of TiC for Target and 5 extra discs for analysis on left end
Target length = 12.5
3 Ta foil heatshields and on TaC coated Ta spring on right side
Total weight including heatshields and spring = 1551.4 g Final total weight = 1545.5 g
Final power should be ~10988 Watt
TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min.
IGP1= 7.7e-7 Torr
Good vacuum =3.0e-05 Torr
Bad vacuum = 5e-04 Torr
Initial TGHT and TBHT autoramped @1A/min to 50A
TBHT mas 230A
TGHT max depends on final power
Thursday, August 25, 2022, 11:17
Start autoramp at 1A/min to 80A on both TGHT and TBHT
Thursday, August 25, 2022, 11:54
leaving at 80A until pressure stops rising
Thursday, August 25, 2022, 22:29
left to autoramp to 230A TBHT and 750 A TGHT since approximately 2:00 pm
Will leave ramping @1A/min to 750 A on TGHT
TBHT currently at 230A
Friday, August 26, 2022, 07:27
TGHT = 850A, 9.3V
Started autoramp to 850A at 1A/min for TGHT
TBHT held at 230A
OMEGA = 1584C
Friday, August 26, 2022, 09:34
Target running at ~820A, 13.1 V since 9
Cooling to start between 1:15 to 1:30 pm
OMEGA reads 1668 C at top current
current reading oscillates between 812A and 828A and 13.1V to 13.2V.
Monday, August 29, 2022, 12:21
Cooling at -2A/min for TGHT and -1A/min TBHT started on time on Friday August 26th.
Target remained under vacuum after cooling, over the weekend.
Target removed this morning and looks good. 5 discs removed for analysis
|
|
590
|
Thursday, September 01, 2022, 12:32 |
Darwin Ortiz Rosales | TaC | 44691-13 | LP-SIS | Done | TaC coating sintering | Thursday, September 01, 2022, 10:34
The coated container was wrapped in three Ta foil heatshields.
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~420A (adjustable)
Heating autoramp starged at 2A/min on both TGHT and TBHT to 40A
Then at 1A/min on both heaters to 120A.
Good vacuum = 5.0 e-05 Torr
Bad vacuum = 5.0E-04 Torr
Thursday, September 01, 2022, 12:39
Has been stabilizing at 40A on both heaters.
Starting 1A/min autoramp to 80A
A discrepancy between setpoint and readback currents was observed for both TGHT and TBHT. The difference is substancial and warrants investigation. This process will be paused until further notice
Tuesday, September 06, 2022, 14:45
Controls has been troubleshooting EVAP2. In the process TBHT has been damaged. Arthur will take a look at it ASAP and his group will try and fix it tomorrow.
Regarding our initial problem, it appears that when an electrical safety box was installed, the copper water lines connected to output terminals of the power supply, were moved so that they were in contact with the evaporator cage. See the figure below.
Thursday, September 08, 2022, 12:47
Target has been removed and a new test target (HP-FEBIAD) has been placed inside. System left to generate enough vacuum and then testing will be performed.
Friday, September 09, 2022, 15:58
System was tested and all seems good. This coat/sintering will continue after conditioning of graphite material
Saturday, September 24, 2022, 09:13
Continuation of process.
IGP1= 4.3e-07 Torr
ramping @ 1A/min to 230 A on both TGHt and TBHT
Saturday, September 24, 2022, 16:28
ramped to 430A, 7.2V on TGHT and 233A, 4.2V on TBHT. Will leave until 7 pm.
Saturday, September 24, 2022, 19:44
Starting rampdown @-2A/min TGHT -1A/min TBHT
camera offline
IGP1= 1.2e-6 Torr
Monday, September 26, 2022, 09:41
IGP1=2.2e-07 Torr. Shutting off TBHT and TGHT.
Thursday, September 29, 2022, 09:53
Final notes: coating looks good . Probably 3 hours at final temperature is better to prevent material degradation. |
Attachment 1: MicrosoftTeams-image_(13).png
|
|
|
591
|
Wednesday, September 14, 2022, 11:48 |
Darwin Ortiz Rosales | | | TARGET BOAT | Done | Grahite disc conditioning 220907G | Wednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with 3 Ta heatshields.
322 graphite discs were loaded.
one Tantalum cup (modified to fit losely) was inserted on the front end along with a Ta spring.
A Ta spring was also installed on the back end to maintain the discs inside the tube.
The system was left to establish vacuum over night.
Good vacuum set to5e-03Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including springs = 249.63 g
Two Ta foils were installed on the copper heatshield facing the ends of the container.
The initial weight of the front Ta foil = 22.5 g
The initial weight of the back Ta foil will be determined by difference after cleaning =
OMEGA slope = 0.99
The target will be heated to 2100 C, held there for 10 hours. The target will be removed, the end Ta foils will be removed to analyses, new Ta end foils will be installed and the Target will be heated to 2100 plus 10 A higher than previous and left at that temperature for 2 hours.
Wednesday, September 14, 2022, 9:47
IGP1= 4.57e--7 Torr
initial Utoramp at 1A/10s to 80A and held at 80 amps until pressure good.
Wednesday, September 14, 2022, 11:54
Start autoramp at 1A/20s to 120A
Wednesday, September 14, 2022, 12:22
Autoramp at 1A/20s to 200A
Wednesday, September 14, 2022, 12:34
Autoramp increased to 2A/20s when TGHT = 154A
Wednesday, September 14, 2022, 13:46
Autoramping to 512A as projected current for 2100 C
Wednesday, September 14, 2022, 14:24
OMEGA = 1945 C @ 512A
Tapped to 540A, 10.5V and OMEGA = 2075. Will leave at this current and see Temperature behaeviour.
After 10 min OMEGA reads 2080C. Will start cooling at 12:20 am
Wednesday, September 14, 2022, 14:29
OMEGA = 2104C will ramp down slightly to keep 2100C
Wednesday, September 14, 2022, 14:31
OMEGA = 2098 @ 530A, 10.4V
Wednesday, September 14, 2022, 14:33
OMEGA = 2100 @ 410A,9.8V
Wednesday, September 14, 2022, 14:45
OMEGA = 2093 at 500A, 9.75V
Wednesday, September 14, 2022, 15:07
497A, 9.6V, OMEGA 2100
Wednesday, September 14, 2022, 22:09
@ approximately 515 pm noticed that OMEGA was reading 1600 C while TGHT was at 497A and 10.0V
Suspect damage to the container and possible damage
Left at the same current.
Just now the OMEGA is reading 2200C at 497A and 9.7V. Out of precaution, lowered the current to 475A and the volatage is 9.2V
OMEGA now reads 2152 C. Will leave at this current until 12:30 am when the 10 hour heating will end and will start rampdown at -2A/min
Thursday, September 15, 2022, 00:05
TGHT= 475A, 9.2V
OMEGA= 2126 C
IGP1= 1.33e-6 Torr
lowered current to 470A, 9.1 V, IGP1= 1.3e-6 Torr, OMEGA stabilized at 2120C
Thursday, September 15, 2022, 00:09
IGP1= 1.3e-6 Torr
will increase 10A to see pressure response. OMEGA= 2130C
Increase in IGP1 to 1.4e-6 Torr observed but immediately started to trend down
Thursday, September 15, 2022, 00:16
IGP1= 1.36e-6 Torr
OMEGA = 2131A
TGHT = 480 A
Thursday, September 15, 2022, 00:18
Start ramp down at -2A/min
Thursday, September 15, 2022, 09:45
IGP1=4.35e-07 Torr
TGHT turned off
Starting dismounting of target tube
Thursday, September 22, 2022, 07:04
Container tube was crystalized and was easily cut with a small pair of nail scissors. All but 18 discs were transferred to a new container. WO# 44691-3 |
|
592
|
Thursday, September 22, 2022, 07:15 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday, September 22, 2022, 07:13
Each endcap is separated with a disc of graphite foil and rolled into 3 packs of 4 within a foil envelope in a target boat.
There are also 2 coated springs
The boat is wrapped with 3-layers of Ta heatshields.
Chamber pumped down over previous night
Good vacuum = 5.0e-04 Torr
bad vacuum = 5.e-02 Torr
OMEGA slope = 0.99
Will ramp TGHT up to 40 A then autoramp to 400A at 1A/min.
Final desired temperature on OMEGA (tap)= 1800C
IGP1= 3.8e-7 Torr
Thursday, September 22, 2022, 10:08
TGHT= 168A,
IGP1= 4.7E-07=6Torr
Increased ramp to 2A/min
Thursday, September 22, 2022, 12:08
TGHT= 400A, 6.7V
OMEGA= 1604C
Continuing autoramp to 450A @2A/min
Thursday, September 22, 2022, 12:36
TGHT=450A, 7.7V
OMEGA=1700C
Tapping to 1800C manually
Thursday, September 22, 2022, 12:54
OMEGA = 1750C at 505A, 8.8 V
Tapped to 540A, 9.5V
Will leave there for two more hours
OMEGA= 1800+/- 10 C
Thursday, September 22, 2022, 15:00
TGHT = 540A, 9.3V
OMEGA= 1713
start rampdown at-2A/min
Friday, September 23, 2022, 09:49
IGP1= 4.0e-7 Torr
Will dismount container
Saturday, September 24, 2022, 09:10
Endcaps looked good. The front spring sintered onto container and not usable. signs of overheating.
|
|
593
|
Thursday, September 29, 2022, 10:02 |
Darwin Ortiz Rosales | | 44139-3 | TARGET BOAT | Done | 220926-Graphite conditioning in target tube | Thursday, September 29, 2022, 09:57
A Ta container tube was wrapped with 3 Ta heatshields.
338 graphite discs were loaded.
one Tantalum cup (modified to fit losely) was inserted on the front end along with a Ta spring.
on the backside there is no spring but four discs glued together with PVA
The system was left to establish vacuum over night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including springs = 249.07 g
OMEGA slope = 0.99
The target will be heated to 2100 C, held there for 10 hours. The target Temperature vs Power will be tabulated and the current required to reach 2100 will be extrapolated to avoid using OMEGA at higher temperatures.
a) The target will be removed, weighed and inspected
b) If the target boat is still good, run again at 10A higher than previous for 2 hours.
c) The target will be removed, weighed and inspected
d) i) If the weight is the same or negligible, experiment ends
ii) if the weight has decreased and target still intact, repeat from step b and document all measurements and settings
Thursday, September 29, 2022, 10:04
IGP1= 1.4e-04 Torr
TGHT= 80.0 A, 1.0V
Will allow pressure to drop and then continue heating
Thursday, September 29, 2022, 10:20
IGP1= 7.9e-05 Torr pressure on downward trend
Start heating at 2A/min to 200A
The target started dropping in temperature as current increased. Suspected OMEGA issue.
Started cooling at -2A/min
Will continue next week.
Monday, October 03, 2022, 11:05
Upon inspection, the window though which the OMEGA laser travels was coated with dark precipitate (mostly a spot in the direct path of the laser).
Cleaned the window and started pumpdown.
Monday, October 03, 2022, 12:57
start heating @2A/20s = 6A/min because the target had previously been heated past additive evaporation point.
IGP1= 3.8e-06 Torr
Monday, October 03, 2022, 18:41
Will heat to 500A and leave for 10 hours. The regression shows too high current to reach 2100. Not reasonable. So will work with 500A as a baseline.
Tuesday, October 04, 2022, 06:52
Temperature @500 A read 1742C
maintained for 10 hours
start rampdown at -2A/min
OMEGA currently 1099C
Current = 500 A
Voltage =9.9 V
IGP1= 5.9e-7 Torr
Tuesday, October 04, 2022, 21:32
Quartz window was completely covered with graphite like dust. final weight after heating = 244.57 g (a couple of discs came loose and they were weighed separately and not included in the next heating).
weighted target and added one extra heatshield because it looked like a lot of heat was escaping. Will treat at 500A again for 2 hours. The extra heat-shield should provide hotter environment.
new initial weight = 254.24 g (don't have a balance with greater precision .
Wednesday, October 05, 2022, 07:42
IGP1= 3.8e-07 Torr
ramping to 280A @ 3A/min
Wednesday, October 05, 2022, 11:40
ramping to 350 @ 3A/min
Then ramp to 500A
500A at 12:50
Wednesday, October 05, 2022, 15:52
ramping down at -2A/min
Thursday, October 06, 2022, 09:27
IGP1= 1.8e-07 Torr
Will dismount and weigh, then decide how to proceed
according to second regression, second heating was ~2000 C. OMEGA not reliable after 1700 C in this case.
Thursday, October 06, 2022, 12:34
The final weight after the second heating was = 254.19 g
reinstalled target and cleaned quartz window.
will heat up to 510 A
Friday, October 07, 2022, 07:46
IGP1= 3.0 e-07 Torr
ramp at 2A/min to 500A. will pause to take data points for regression.
Friday, October 07, 2022, 13:05
Start rampdown after two hours at 500A, 10.3V
-2A/min
|
|
594
|
Monday, October 17, 2022, 11:32 |
Darwin Ortiz Rosales | TaC | 45220-2 | LP-SIS | Done | TaC coating sintering | Monday, October 17, 2022, 10:03
The coated container was wrapped in 4 Ta foil heatshields. (The 4 shields appear to work well)
Target temperature on OMEGA= 1850-1900 C
OMEGA slope:= 0.990
Target time at max temperature = 4 hours
Final Current TBHT= 230A
Final TGHT current= ~420A (adjustable)
Heating autoramp started at 2A/min on both TGHT and TBHT to40A
Then at 1A/min on both heaters to 120A.
Good vacuum = 5.0 e-04 Torr
Bad vacuum = 5.0E-02 Torr
Monday, October 17, 2022, 12:45
Autoramping @4A/min on both TGHT and TBHT to 400 and 30A respectively
Monday, October 17, 2022, 12:56
slowed ramp to 2A/min on both heaters as pressure was increasing too fast. (1A/30s).
Monday, October 17, 2022, 13:30
increased ramp rate to 4A/min on TGHT as TBHT is already at 230A
Monday, October 17, 2022, 14:16
leaving at TGHT : 393A, 6.5V ; TBHT 233A, 4.2V
OMEGA reads 1864C. Will start rampdown at 6:17 pm
Monday, October 17, 2022, 18:16
OMEGA read 1875C at max and now reads 1856C
starting ramp down at -2A/min TGHT and -1A/min TBHT
Final IGP1= 1.4e-06 Torr
Tuesday, October 18, 2022, 09:37
IGP1= 2.72e-7 Torr
Turning heaters off on epics and turning vacuums off. |
|