7
|
Tuesday, March 20, 2012, 14:35 |
John Wong | | | | Done | Evap#2 Backing up muffler not connected to the exhaust system. | Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1)
muffler has not connected to the exhaust |
|
419
|
Tuesday, September 11, 2018, 10:47 |
Aaron Schmidt | | | | | Evap 2 step discrepancy | Tuesday, September 11, 2018, 10:45:
TGHT: 53.4 A TBHT: 57.75
Actual |
|
30
|
Monday, June 11, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Problems | End caps vaporized |
|
|
670
|
Wednesday, August 14, 2024, 07:23 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems | EVAP2 Calibration - Vanadium | Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on |
|
671
|
Wednesday, August 14, 2024, 16:22 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems resolved | EVAP2 Calibration - Vanadium |
|
|
672
|
Wednesday, August 14, 2024, 16:24 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | In progress | EVAP2 Calibration - Vanadium |
|
|
289
|
Thursday, April 07, 2016, 15:23 |
John Wong | SiC | | TARGET BOAT | Done | E-spun SiC/PAN thermal treatment | Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC. |
|
553
|
Thursday, August 05, 2021, 11:18 |
Darwin Ortiz Rosales | SiC | 44691-2 | LP-SIS | Done | Dr blade and non-Dr blade Material Experiment (sintering) | Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm |
|
92
|
Tuesday, October 29, 2013, 15:50 |
Anders Mjos | | | | In progress | Copper bars on TGHT and TBHT | Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32: |
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|
231
|
Thursday, July 30, 2015, 17:07 |
John Wong | | | | Maintenance | Connect NALCW to EVAP1 | Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW. The city water has been removed |
|
471
|
Tuesday, November 26, 2019, 15:21 |
Darwin Ortiz Rosales | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) | Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm |
|
473
|
Wednesday, November 27, 2019, 17:45 |
John Wong | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) |
|
|
450
|
Monday, June 24, 2019, 08:42 |
Darwin Ortiz Rosales | SiC | 42464-4 | HP-FEBIAD | Done | Conditioning of BSiC discs |
Monday, June 24, 2019, 08:24
Total number of foils: 484
Total mass in including container |
|
508
|
Monday, September 21, 2020, 17:01 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Conditioning graphite target #3 | Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite
slurry were loaded in a tantalum tube, the |
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr |
|
480
|
Monday, March 23, 2020, 07:50 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) | Friday, March 20, 2020, 19:39
The target material is loaded |
|
482
|
Wednesday, May 20, 2020, 12:54 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) |
|
|
478
|
Monday, March 16, 2020, 13:47 |
Marla Cervantes | | 40282-5 | TARGET BOAT | Done | Conditioning graphite target #1 | Monday, March 16, 2020, 13:47
Target material characteristics:
Graphite cast of 0.965g/cm3, 287 D-shaped |
|
181
|
Wednesday, February 11, 2015, 16:12 |
Laura Lambert | Empty | 41077-2 | LP-SIS | Done | Conditioning graphite insert inside container - with heat shield | Wednesday, February 11, 2015, 16:10
Container loaded into EVAP2.
3xTa heat shields. |
|