  Evaporator_2, Page 28 of 35  Not logged in ELOG logo
Entry  Wednesday, August 28, 2019, 05:59, Marla Cervantes, , 44062-2-SK, , Done, Graphite insert test 
    Reply  Thursday, August 08, 2024, 11:17, Marla Cervantes, C, 44139-5 SK, LP TUBE, Done, Graphite foils conditioning GraphiteFoil-Conditioning-EVAP2.JPG
Entry  Tuesday, May 21, 2019, 18:01, Marla Cervantes, , 43943-1, , Done, Graphite foil test 
Entry  Tuesday, November 24, 2020, 12:56, Marla Cervantes, , 44139-8-SK , TARGET BOAT, Done, Graphite casting conditioning 2020-11-24-IGP1.JPG2020-11-24IGP1-zoom_out.png2020-11-24-IGP1-stable.JPG2020-11-24-ConditioningProcess.JPG
Entry  Friday, December 02, 2022, 09:50, Darwin Ortiz Rosales, , 45220-12, TARGET BOAT, Done, Grahite disc conditioning 221130-Graphite 
Entry  Wednesday, September 14, 2022, 11:48, Darwin Ortiz Rosales, , , TARGET BOAT, Done, Grahite disc conditioning 220907G 
Entry  Tuesday, July 10, 2018, 16:43, John Wong, Empty, , LP-SIS, Done, For nano-SiC#1  
Entry  Monday, November 25, 2019, 11:35, Aaron Schmidt, , , , In progress, Flex - line HS installed 
Entry  Tuesday, November 24, 2020, 08:13, Aaron Schmidt, , , , , Flex - line HS installed 
Entry  Monday, March 01, 2021, 13:58, Aaron Schmidt, , , , , Flex - line HS installed 
Entry  Thursday, September 10, 2020, 07:53, Aaron Schmidt, Empty, 41790-8, LP-FEBIAD, Done, Fernando FEBIAD / Anode testing. 
Entry  Monday, February 13, 2012, 16:24, John Wong, , , , Done, Evaporator #2 Commissioned  Evap2_Commissioning_Report.PDF
Entry  Tuesday, March 20, 2012, 14:35, John Wong, , , , Done, Evap#2 Backing up muffler not connected to the exhaust system. Evap2_backingpump.jpgscroll_pump_exhaust.jpg
Entry  Tuesday, September 11, 2018, 10:47, Aaron Schmidt, , , , , Evap 2 step discrepancy  PS_Check.docx
    Reply  Monday, June 11, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Problems, End caps vaporized Photo_2012-06-11_12_06_19_PM.jpg
Entry  Wednesday, August 14, 2024, 07:23, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems, EVAP2 Calibration - Vanadium  TP-not_speeding_up.JPG
    Reply  Wednesday, August 14, 2024, 16:22, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems resolved, EVAP2 Calibration - Vanadium  
    Reply  Wednesday, August 14, 2024, 16:24, Marla Cervantes, C, 44139-5 SK, LP TUBE, In progress, EVAP2 Calibration - Vanadium  
Entry  Thursday, April 07, 2016, 15:23, John Wong, SiC, , TARGET BOAT, Done, E-spun SiC/PAN thermal treatment  SiC_PAN_1400c.PNGarchiver.PNG
Entry  Thursday, August 05, 2021, 11:18, Darwin Ortiz Rosales, SiC, 44691-2, LP-SIS, Done, Dr blade and non-Dr blade Material Experiment (sintering) image_2021-08-09_221014.png