Entry  Tuesday, March 20, 2012, 14:35, John Wong, , , , Done, Evap#2 Backing up muffler not connected to the exhaust system. Evap2_backingpump.jpgscroll_pump_exhaust.jpg
Entry  Tuesday, September 11, 2018, 10:47, Aaron Schmidt, , , , , Evap 2 step discrepancy  PS_Check.docx
    Reply  Monday, June 11, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Problems, End caps vaporized Photo_2012-06-11_12_06_19_PM.jpg
Entry  Wednesday, August 14, 2024, 07:23, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems, EVAP2 Calibration - Vanadium  TP-not_speeding_up.JPG
    Reply  Wednesday, August 14, 2024, 16:22, Marla Cervantes, C, 44139-5 SK, LP TUBE, Problems resolved, EVAP2 Calibration - Vanadium  
    Reply  Wednesday, August 14, 2024, 16:24, Marla Cervantes, C, 44139-5 SK, LP TUBE, In progress, EVAP2 Calibration - Vanadium  
Entry  Thursday, April 07, 2016, 15:23, John Wong, SiC, , TARGET BOAT, Done, E-spun SiC/PAN thermal treatment  SiC_PAN_1400c.PNGarchiver.PNG
Entry  Thursday, August 05, 2021, 11:18, Darwin Ortiz Rosales, SiC, 44691-2, LP-SIS, Done, Dr blade and non-Dr blade Material Experiment (sintering) image_2021-08-09_221014.png
Entry  Tuesday, October 29, 2013, 15:50, Anders Mjos, , , , In progress, Copper bars on TGHT and TBHT Current_and_Voltage.pdf
Entry  Tuesday, August 11, 2020, 10:17, Ferran Boix Pamies, Empty, 41882-1, TARGET BOAT, In progress, Contamination foils temperature test 
Entry  Thursday, July 30, 2015, 17:07, John Wong, , , , Maintenance, Connect NALCW to EVAP1  
Entry  Tuesday, November 26, 2019, 15:21, Darwin Ortiz Rosales, SiC, 42464-3, HP-FEBIAD, Done, Conditioning of SiC discs (sintering) (RUSH) HPFIBIAD20191124-SinteringTaC.PNG
    Reply  Wednesday, November 27, 2019, 17:45, John Wong, SiC, 42464-3, HP-FEBIAD, Done, Conditioning of SiC discs (sintering) (RUSH) SiC_42464-3_RUSH_400A.JPG
Entry  Monday, June 24, 2019, 08:42, Darwin Ortiz Rosales, SiC, 42464-4, HP-FEBIAD, Done, Conditioning of BSiC discs 
Entry  Monday, September 21, 2020, 17:01, Marla Cervantes, , 44139-8-SK, TARGET BOAT, Done, Conditioning graphite target #3 Voltage-Increment.JPGConditioning-C-3.JPG
Entry  Wednesday, May 27, 2020, 13:04, Marla Cervantes, , 44139-7-SK, , Done, Conditioning graphite target #2 e-log-484.JPGelog-484-fig2.PNG
Entry  Monday, March 23, 2020, 07:50, Marla Cervantes, , 41882-1, TARGET BOAT, Done, Conditioning graphite target #1 (T2) 
    Reply  Wednesday, May 20, 2020, 12:54, Marla Cervantes, , 41882-1, TARGET BOAT, Done, Conditioning graphite target #1 (T2) e-log482-fig-1.JPG
Entry  Monday, March 16, 2020, 13:47, Marla Cervantes, , 40282-5, TARGET BOAT, Done, Conditioning graphite target #1 CarbonTarget-100A.JPGCurrent_discrepancy.JPGManual_current_incresing.JPGCarbonTarget-Max_current.JPG
Entry  Wednesday, February 11, 2015, 16:12, Laura Lambert, Empty, 41077-2, LP-SIS, Done, Conditioning graphite insert inside container - with heat shield grp_with_HS_before_cooling.JPGgrp_insert_with_HS_table.JPGresistance.JPGtemp_vs_current.JPGtemp_vs_power.JPG