669
|
Thursday, August 08, 2024, 11:17 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Done | Graphite foils conditioning |
|
|
445
|
Tuesday, May 21, 2019, 18:01 |
Marla Cervantes | | 43943-1 | | Done | Graphite foil test | Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite |
|
525
|
Tuesday, November 24, 2020, 12:56 |
Marla Cervantes | | 44139-8-SK | TARGET BOAT | Done | Graphite casting conditioning | Tuesday, November 24, 2020, 09:23
A batch of 60 discs of 18 mm diameter
were loaded in a tantalum tube. The tantalum |
   |
606
|
Friday, December 02, 2022, 09:50 |
Darwin Ortiz Rosales | | 45220-12 | TARGET BOAT | Done | Grahite disc conditioning 221130-Graphite | Friday, December 02, 2022, 09:46
297 graphite discs packed into a
Ta tube wrapped in four heatshields. |
|
591
|
Wednesday, September 14, 2022, 11:48 |
Darwin Ortiz Rosales | | | TARGET BOAT | Done | Grahite disc conditioning 220907G | Wednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields. |
|
414
|
Tuesday, July 10, 2018, 16:43 |
John Wong | Empty | | LP-SIS | Done | For nano-SiC#1 | Tuesday, July 10, 2018, 16:40
Container was flashed with TaC solution
and let dry in air. |
|
470
|
Monday, November 25, 2019, 11:35 |
Aaron Schmidt | | | | In progress | Flex - line HS installed | Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line |
|
524
|
Tuesday, November 24, 2020, 08:13 |
Aaron Schmidt | | | | | Flex - line HS installed | Monday, November 23, 2020, 17:01: Flex-line
HS installed.
Tuesday, November 24, 2020, |
|
532
|
Monday, March 01, 2021, 13:58 |
Aaron Schmidt | | | | | Flex - line HS installed | Flex-Line HS had been fully scrubbed out
earlier. All gaskets replaced.
Empty. Quick check for leaks. |
|
506
|
Thursday, September 10, 2020, 07:53 |
Aaron Schmidt | Empty | 41790-8 | LP-FEBIAD | Done | Fernando FEBIAD / Anode testing. | FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check |
|
3
|
Monday, February 13, 2012, 16:24 |
John Wong | | | | Done | Evaporator #2 Commissioned | Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
See attachment#1 for the commissioning |
|
7
|
Tuesday, March 20, 2012, 14:35 |
John Wong | | | | Done | Evap#2 Backing up muffler not connected to the exhaust system. | Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1)
muffler has not connected to the exhaust |
 |
419
|
Tuesday, September 11, 2018, 10:47 |
Aaron Schmidt | | | | | Evap 2 step discrepancy | Tuesday, September 11, 2018, 10:45:
TGHT: 53.4 A TBHT: 57.75
Actual |
|
30
|
Monday, June 11, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Problems | End caps vaporized |
|
|
670
|
Wednesday, August 14, 2024, 07:23 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems | EVAP2 Calibration - Vanadium | Tuesday, August 13, 2024, 17:20 Pressure
kept increasing when turning the turbo pump
on |
|
671
|
Wednesday, August 14, 2024, 16:22 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | Problems resolved | EVAP2 Calibration - Vanadium |
|
|
672
|
Wednesday, August 14, 2024, 16:24 |
Marla Cervantes | C | 44139-5 SK | LP TUBE | In progress | EVAP2 Calibration - Vanadium |
|
|
289
|
Thursday, April 07, 2016, 15:23 |
John Wong | SiC | | TARGET BOAT | Done | E-spun SiC/PAN thermal treatment | Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC. |
 |
553
|
Thursday, August 05, 2021, 11:18 |
Darwin Ortiz Rosales | SiC | 44691-2 | LP-SIS | Done | Dr blade and non-Dr blade Material Experiment (sintering) | Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm |
|
92
|
Tuesday, October 29, 2013, 15:50 |
Anders Mjos | | | | In progress | Copper bars on TGHT and TBHT | Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32: |
|