  133   Monday, June 09, 2014, 13:56 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backing

Manually changed current from 500 to 615 A, monitoring the temperature. Temperature went from 1657 C up to 1838 C. Pressure increased up to 7.2e-7 T. Samples should be left for about 4 hours (615 A started just before 13:00), then the goal is to ramp current back to zero.

  134   Monday, June 09, 2014, 17:15 Cameron Hodgins  TARGET BOATIn progressSintering several carbides on tantalum foil backing

 Target boat is now being cooled at 1 A/min from the starting point (616 A) down to 0 A. 

  150   Tuesday, August 05, 2014, 13:13 Laura LambertEmpty TARGET BOATIn progressSintering TaC coated end caps

 Tuesday, August 05, 2014, 12:02

The target container end caps were coated with TaC spray and let dry.

The caps are inserted in the target boat vertically, wrapped in graphite foil with 3 x Ta-heat shield. [see attached photo]

The chamber is currently being pumped down.


 

Attachment 1: aug5-2014.jpg
aug5-2014.jpg
  151   Tuesday, August 05, 2014, 17:20 John Wong  TARGET BOATIn progressSintering TaC coated end caps

Laura Lambert wrote:

 Tuesday, August 05, 2014, 12:02

The target container end caps were coated with TaC spray and let dry.

The caps are inserted in the target boat vertically, wrapped in graphite foil with 3 x Ta-heat shield. [see attached photo]

The chamber is currently being pumped down.


 

 Tuesday, August 05, 2014, 17:19

HS water valve opened; no leaks detected. 

Pressure @ 2.5e-6 Torr.

Ramping up TGHT to 580A @ 1A/min.


 

  153   Thursday, August 07, 2014, 10:13 Laura Lambert  TARGET BOATFailedSintering TaC coated end caps

John Wong wrote:

Laura Lambert wrote:

 Tuesday, August 05, 2014, 12:02

The target container end caps were coated with TaC spray and let dry.

The caps are inserted in the target boat vertically, wrapped in graphite foil with 3 x Ta-heat shield. [see attached photo]

The chamber is currently being pumped down.


 

 Tuesday, August 05, 2014, 17:19

HS water valve opened; no leaks detected. 

Pressure @ 2.5e-6 Torr.

Ramping up TGHT to 580A @ 1A/min.


 

 Thursday, August 07, 2014, 08:11

Yesterday the target boat was taken out.

The boat broke as it turns out it was used for a Niobium target and therefore wasn't coated with TaC.

The end caps were fully sintered.


 

  159   Thursday, October 02, 2014, 11:26 John WongEmpty  MaintenanceBroken insulators

 Thursday, October 02, 2014, 11:22

It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block insulator that supports the terminals.  

Informed Anders/Rick.


 

  161   Friday, October 03, 2014, 13:02 Anders MjosEmpty  MaintenanceBroken insulators

John Wong wrote:

 Thursday, October 02, 2014, 11:22

It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block insulator that supports the terminals.  

Informed Anders/Rick.


 

 Friday, October 03, 2014

  • Insulators replaced. Torque 55 in lbs on all fasteners.
  • Cleaned TGHT terminals with scotch-brite and methanol.
  •  New (clean) heat shield prepared WO-39230-2.
  • Re-installed right side heat shield alignment pin (previously removed to allow line of sight to the target).
Attachment 1: NewInsulators.jpg
NewInsulators.jpg
Attachment 2: BrokenInsulators.jpg
BrokenInsulators.jpg
  164   Thursday, October 09, 2014, 15:59 John WongNb TARGET BOATIn progressConditioning Nb target (for Bob)

Thursday, October 09, 2014, 15:56

The target boat contains 5 samples of Nb discs.  Each disc is wrapped with Nb foil and labelled. 

Samples will be heated up to 1400C for 4 hours. 

chamber has been pumped down to 3.9e-6 Torr. HS valves open - no leaks detected.

Ramping up TGHT...


 

  166   Thursday, October 09, 2014, 17:41 John WongNb TARGET BOATDoneConditioning Nb targets (for Bob)

Thursday, October 09, 2014, 17:36

Target boat consists of 5 Nb discs.  Each disc is wrapped with Nb foil, and to be heated to 1400C for 4 hours.

Chamber has been pumped down to 6.5e-7 Torr.  HS valves open - no leaks detected.

TGHT has ramped to 330A to maintain the 1400C temperature. 

At 21:30, the target will be cooled down.

Temperature can be monitored from this link:

https://www.dropbox.com/sh/kor6gnutnlimqxw/AAAee2yb-Hj3JEbBysrAW2oYa?dl=0


 Thursday, October 09, 2014, 22:48

Samples have been heated at 1420C for over 4 hours.  

Pressure at 6.6 e-7 Torr. 

Cooling process initiated, ramping down at 2A/min. 


 Friday, October 10, 2014, 13:50

Samples were successfully conditions; no signs of any damage.


 

Attachment 1: samples@1400C.png
samples@1400C.png
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6H

Tuesday, November 04, 2014, 16:08

The purpose of this experiment is to improve the fabrication of SiC.  Previously, the SiC target was heated to 2000c and yellow crystals were observed.

In this experiment, 10g of SiC powder (7um size) was previously milled down (actual size to be determined under SEM).  The powder was mixed with 5% PVA and the slurry was pour onto a glass and let dry.  The semi-dry slurry was rolled up into balls. The SiC balls were let dry in over (115C) over night. Taken out 2.903g SiC + 5% PVA, it's rolled up with a small sheet of graphite foil.  Then the targer boat is filled with the sample and wrapped with 3-layers of Ta-heat shield.

The sample will be heated up to 2000C to see if the yellow crystals are reproducible.  It is suspected that there might be a phase transformation from 6H alpha-SiC to 3C beta-SiC. 

Chamber is currently being pumped down... 


Wednesday, November 05, 2014, 14:04

TGHT was ramped up over night, currently at 485A = 1800 C. 

Will do manual step up to get to 2000C. 


 

  170   Monday, November 10, 2014, 13:55 Laura LambertEmpty LP-SISDoneSintering TaC coating container for UCx#11 [2nd container]

Monday, November 10, 2014, 13:51

target container was sprayed with TaC on friday and sintered over the weekend.
vented and removed from evap2 this morning, looks good.

this container will be used as a round2 for UCx #11 since the last container broke as it was being assembled.

hopefully all the materials can be recovered and re-used/re-loaded into the new container...


 

  172   Wednesday, November 26, 2014, 14:09 Laura Lambert   MaintenanceOMEGA-IR dark patch and backing pump trip

 Wednesday, November 26, 2014, 13:47

OMEGA-IR laser had a dark patch on it [see picture]

Cleaned window, still dark patch

When tested by itself, through air, not through window, patch still visible - cleaned lens of OMEGA-IR, still no change.

Conclusion: assuming laser used to be able to focus the OMEGA-IR to a specific area - so visual only, but the measurements itself will not be affected.


Wednesday, November 26, 2014, 13:53 

Backing pump trips off every time roughing valve turned on through epics.

Requested further investigation...


Friday, November 28, 2014, 12:09

Backing Pump has been replaced, waiting on a reply from OMEGA re: dark patch on laser

 

Pancake monitor was also acting funny. Background was reading 100cpm and jumping up to as high as 400cpm by simply moving the probe piece.

The wire connecting the probe to the monitor was replaced and works fine now.


 Tuesday, December 09, 2014, 15:55

Finally got a reply from the OMEGA people:

"That [ dark patch] would happen because of sharp bends in the fiber, or simply defective fiber cable.

As manufacturer we allow 2% of broken fibers, out of 870 in the bundle.

As far as measurements is concerned, if IR2 is used in dual colour mode, 

the field of view can be obstructed as much as 50%, 

without changing the readings accuracy. This laser issure should not affect readings."

-Quote from Brian Newport from OMEGA


 

Attachment 1: IR_focus.jpeg
IR_focus.jpeg
  173   Thursday, December 11, 2014, 10:20 Laura Lambert   Maintenancewater supply shut off for lab closure over holidays

 Thursday, December 11, 2014, 10:17

water supply and return valves closed for lab closure over the holidays.

all taps leading into evap2 have been closed.

evap2 was fully flushed leaving no water left inside the system.


 

  174   Wednesday, January 14, 2015, 13:46 Anders MjosEmpty  MaintenancePumping down for water leak test

 Wednesday, January 14, 2015, 13:46: Roughing

Wednesday, January 14, 2015, 14:57: Starting turbo


Monday, January 19, 2015, 13

Water opened up to one circuit at at time. No response on the vacuum could be seen.

IGP1 at 1.7E-7 T

IGP2 at 3E-8 T


Tuesday, January 20, 2015, 13:11: Stopped turbo and roughing pump.


Wednesday, January 21, 2015, 15:46: Venting

Rick and Anders found CG1A to be reading too high a value. A borrowed gauge from the vacuum group confirmed this. A new gauge will be installed


Thursday, January 22, 2015, 14:06: Roughing

Thursday, January 22, 2015, 14:18: Venting

The reading is consistent between CG1A and CG1B, which simplifies pump down.

  175   Thursday, January 22, 2015, 14:21 Anders MjosEmpty  Problems resolvedCG1A replaced

 See previous e-log entry for details

  194   Friday, May 22, 2015, 11:44 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on Ta target boat

 Friday, May 22, 2015, 11:43

A target boat was sprayed with TaC coating and let dry yesterday.

The target boat is wrapped with 3-layers of Ta-heat shield.

The boat was installed in EVAP2, chamber is currently being pumped down.


 Friday, May 22, 2015, 14:22

HS water valves opened, no leaks detected.

IGP1 = 2.4e-6 Torr.

Tapping up manually...


 Friday, May 22, 2015, 14:33

Tapped up to 20A.

Vacuum jumped up to 7e-6 Torr.

Backed off to 5A before vacuum started to drop again.

IGP1 = 5e-6 Torr.

Tapping up manually again...just more slowly...


 Friday, May 22, 2015, 15:31

Tapped up to 12A, unable to tap up very fast due to volatile content in coating.

IGP1 = 3.6e-6 Torr.

Initiating auto-ramp at 0.1A/min with a max current of 580A.


 Monday, May 25, 2015, 09:03

IGP1 = 3e-7 Torr.

TGHT = 397.5A, 6.43V

Increasing ramping rate to 1.0A/min.


 

  207   Thursday, June 04, 2015, 11:10 Laura LambertEmpty LP-IG-LISIn progressSintering TaC coating container for UCx

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

  208   Friday, June 05, 2015, 12:19 John WongEmpty LP-IG-LISIn progressSintering TaC coating container for UCx

Laura Lambert wrote:

 Thursday, June 04, 2015, 9:07

Container was sprayed with TaC and let dry.

Container has 3x Ta heat shields including center block.

Container was loaded into EVAP2 yesterday and pumped down overnight.

HS water valves were opened up this morning, no leaks detected.

IGP1 = 4.6e-7 Torr.

Tapped up manually to 40A.

Waited ~25min, Vacuum stable.

IGP1 = 5.0e-7 Torr.

Initiating auto-ramp.

TGHT will be ramped to reach 2000C


 Friday, June 05, 2015, 10:01

IGP1 = 4.5e-7 Torr.

TGHT = 313A, 4.47V

OMEGA = 1444C

Increasing ramping rate to 1.0A/min


 Friday, June 05, 2015, 11:31

IGP1 = 1.2e-6 Torr.

Increasing ramping rate to 2.0A/min


 

 Friday, June 05, 2015, 12:01

TGHT reached to 465A/7.56V, temp is stable at 2000C. Current vac at 1.2e-6 Torr and coming down

Cooling down process can be initiated after 4 hours. 


 

  218   Thursday, June 18, 2015, 11:39 Rick Maharaj    Installation of Extraction Electrode Insulator - New Material

Tuesday June 16, 2015

An Extraction Insulator ITD0381 made from a different grade of AiN was installed in Evaporator 2 for testing purposes. The sub assembly included the SIS Restraint Housing ITD0389, New Extraction Insulator ITD0381, Repeller Electrode ITD0377, Extraction Electrode ITD0374 with fingerstock mounted.

The standoff insulator ITD0400 was found to be swelled up and broken. It was replaced with and glazed alumina insulator.

The tube heater Insulator ITD0342 - central support helicoil was repaired.

  231   Thursday, July 30, 2015, 17:07 John Wong   MaintenanceConnect NALCW to EVAP1

 Thursday, July 30, 2015, 17:02

EVAP1 cooling system is now on the NALCW.  The city water has been removed from the system.  

Tested all the cooling system interlocks by shutting off each individual valve, and the main supply valve to the lab -  All Passed!  


 