Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 27 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  569   Wednesday, March 09, 2022, 06:27 Darwin Ortiz RosalesTaC42464-2HP-FEBIADDoneTaC coating/sintering Wednesday, March 09, 2022, 06:25
Ta HP-FEBIAD was coated
  
  570   Wednesday, March 23, 2022, 10:52 Darwin Ortiz RosalesTaC44692-9HP-FEBIADDoneTaC coating Wednesday, March 23, 2022, 10:49
Ta HP-FEBIAD was coated
 image_2022-03-24_201954.png 
  576   Wednesday, May 18, 2022, 09:59 Darwin Ortiz RosalesSiC44692-9HP-FEBIADDoneT-220516 Sintering SiC Wednesday, May 18, 2022, 09:46
Total number of foils:
  
  578   Tuesday, June 07, 2022, 07:31 Darwin Ortiz RosalesSiC42464-2HP-FEBIADDoneT-220524 Sintering SiCTuesday, June 07, 2022, 07:19
Total number of foils:
  
  580   Thursday, June 09, 2022, 09:09 Darwin Ortiz RosalesTa HP-FEBIADDoneTroubleshootingThursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container
 MicrosoftTeams-image_(3).pngMicrosoftTeams-image_(4).pngMicrosoftTeams-image_(5).png 
  582   Tuesday, June 14, 2022, 09:04 Darwin Ortiz RosalesTa37978-1HP-FEBIADDoneTaC coating sinteringTuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated
  
  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sinteringTuesday, June 21, 2022, 09:43
Total number of foils:
  
  586   Wednesday, June 29, 2022, 10:12 Darwin Ortiz RosalesTaC44692-10HP-FEBIADDoneTaC coating sinteringWednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated
  
  589   Thursday, August 25, 2022, 10:16 Darwin Ortiz RosalesTiC44692-10HP-FEBIADDoneTiC 220818 Sintering (TiC #6)Thursday, August 25, 2022, 10:06
 
Target container is loaded with 379
  
  609   Thursday, February 23, 2023, 18:24 Darwin Ortiz RosalesTaC45441-2HP-FEBIADDoneTaC coating sinteringThursday, February 23, 2023, 18:20
Ta HP-FEBIAD was coated
 WO_45441-2.png 
  619   Tuesday, April 04, 2023, 12:50 Darwin Ortiz RosalesTaC45447-1HP-FEBIADDoneTaC coating sinteringTuesday, April 04, 2023, 12:48
Ta HP-FEBIAD was coated
  
  644   Thursday, August 31, 2023, 07:09 Darwin Ortiz RosalesTaC45447-4HP-FEBIADDoneTaC coating sinteringThursday, August 31, 2023, 07:07
The coated container was wrapped
in 3 Ta foil heatshields.
  
  650   Wednesday, December 06, 2023, 09:57 Darwin Ortiz RosalesSiC45447-4HP-FEBIADDone231204SiC conditioningWednesday, December 06, 2023, 09:47
Target number of foils:370
  
  652   Friday, January 26, 2024, 07:06 Darwin Ortiz RosalesTaC45447-1HP-FEBIADDoneTaC coating sinteringFriday, January 26, 2024, 07:05
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2
  
  683   Monday, March 10, 2025, 09:56 Darwin Ortiz RosalesEmpty45447-3HP-FEBIADDoneTaC coating sintering
Monday, March 10, 2025, 09:50
The coated container was wrapped
in 4 Ta foil heatshield and left in evap2 
  
  689   Friday, April 04, 2025, 06:55 Darwin Ortiz RosalesSiC45447-1HP-FEBIADDoneSiC-250402 conditioningFriday, April 04, 2025, 06:41
Total number of foils:328
  
  1   Monday, March 28, 2011, 12:40 John Wong    Under ConstructionEvaporator #2 is still under construction. 
For further information please contact Jens
Lassen.
  
  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
  
  3   Monday, February 13, 2012, 16:24 John Wong   DoneEvaporator #2 Commissioned  Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
 See attachment#1 for the commissioning
 Evap2_Commissioning_Report.PDF 
  5   Thursday, March 01, 2012, 14:42 John Wong    IEVAP2:TGHT/TBHT max current setpoint issueThursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT
maximum current setpoints on the vacuum page
 TGHT_TBHT_setpoints.JPG 
ELOG V2.9.2-2455